1、表H-421母线安装记录Bus installation record项目:Project装置:Unit工号:Section名称Name施工日期Date电压等级VoltagekV图号Drawing No.母线型号、规格Bus model and spec.套管、绝缘子型号Bushing insulator model1、一般安装检查: General installation inspection序号No.检查调整项目Inspection and adjustment item安装检查结果Inspection result1母线型号、规格、材质核对Bus model, spec, and ma
2、t. Inspection型号 规格 材质 Model Specification Material2绝缘子、穿墙套管检查Insulator and lead-in insulator型号规格 油位、密封 绝缘 Model Oil level, seal Insulation3母线支架制作安装Bus support fabrication and installation规格 安装尺寸 防腐 Spec. Dimension Anti-corrosion4母线安装检查Bus installation排列、相色 弯曲倍率 伸缩节 Arrangement, color Curve radius Ex
3、pansion joint5连接螺栓、垫圈检查Bolt and washer inspection规格 热镀锌 露出长度 Spec. Galvanization Left length6母线接触面Bus contact area inspection光洁平整 搪锡 电力复合脂 Smooth. Enam. Polymer7硬母线焊接检查Rigid bus welding inspection焊工合格证号Weldor No.8软母线、组合母线安装Flexible and combine bus installation2、母线接触面连接紧密检测:Bus contact. Tightness ins
4、pection螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque最小值Min.最大值Max.最小值Min.最大值Max.最小值Min.最大值Max.3、软母线弛度:Flexible bus sag inspection软母线名称Flexible bus name设计弛度(mm)Design sag实测弛度(mm)Actual sag4、母线相同、对地最小距离检测:Bus phase and phase
5、 to earth min. Distance measure母线类别Bus type主母线Main分支母线Branch实测最小相间距离(mm)Min. Phase to phase distance实测最小对地距离Min. Phase to earth distance备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-422蓄电池充(放)电记录Storage battery charging/Discharging record项目:Project装置:Unit工号:Section名称Name型号Model出厂日期Manuf. Date电压Volt
6、ageV容量capacityAh电池总数Number of battery电解液Electrolyte电解液化验单或合格证号Electrolyte report or certification No.蒸馏水化验单或合格证号Distilled water report or certification No.注入时电解液温度Electrolyte temp. at filling电解液比重Specific gravity of electrolyte开始注入时间Filling start time结束时间End time初充电First charging充电开始时间Charging start
7、 time结束时间End time单独补充充电的电池编号Separately charged cell No.放电Discharging放电开始时间Discharge start time结束时间End time放电电流Discharge current放电容量Discharging capacity为额定容量的%(换算到25时) % of rated capacity (at 25)充(放)电特性曲线图:(充放电记录见附表)Charging/Discharging characteristic curve备注:Remarks结论:Conclusion技术负责人Check施工人Operator
8、表H-423蓄电池充(放)电记录附表Attached table for storage battery charging/Discharging record项目:Project装置:Unit工号:Section名称Name型号Model出厂日期Manufacture date电压VoltageV容量CapacityAh电池总数Number of battery时间Time充(放)电电压(V)Charge/Discharge voltage充(放)电电流(A)Charge/Discharge currentNoNoNoNoNoNoUDTUDTUDTUDTUDTUDT技术负责人Check施工人
9、Operator日期Date表H-424电机抽芯检查记录Motor loose-core inspection record项目:Project装置:Unit工号:Section名称Name位号Tag. No.检查日期Inspection Date型号Type额定容量Rated capacitykW额定电压Rated voltagekV额定电流Rated currentA接法Connection绝缘等级Insulation class转速Rotation speedr/min转子结构Rotor structure防爆等级Explosion proof class出厂编号Manufacturer
10、 No.制造厂Manufacturer防护等级Prevention class检 查 内 容Installation contents标记Mark备 注Remark铁芯轴颈无伤痕锈蚀No Damage & corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage & corrosion on surface of commutator and slip-ring 绕组绝缘层完好,绑线无松动Winding insulation coating and fixing inspection绕组连接正确,焊接良好Winding connection
11、 and welding inspection绕组电阻检测合格Winding resistance inspection定子槽楔无断裂凸出及松动,端部槽楔牢固Stator slot wedge inspection转子平衡块紧固,平衡螺丝锁车Rotor balance block and bolt fixing inspection风扇完好,方向正确Fan inspection磁极及铁轭固定良好Magnetic pole and hub fixing inspection励磁绕组紧固Exciter winding fixing inspection 鼠笼式电机转子导电条和端环焊接良好,浇铸无裂
12、纹Rotor conductor and end link of squirrel-cage motor轴承滚动体与内、外圈转动灵活无松动、卡涩Bearing rotating flexibility inspection加入轴承内的润滑脂已填满内部空间的三分之二Internal space of bearing is filled with lubrication grease电机机部清洁无杂物Motor internal cleanliness inspection结论:Conclusion技术负责人Check施工人Operator表H-425电机干燥记录Motor drying reco
13、rd项目:Project装置:Unit工号:Section名称Name位号Tag. No.干燥日期Drying Date型号Type额定容量Rated capacitykW绝缘等级Insulation class定子电压Stator voltageV转子电压Rotor voltageV制造厂Manufacturer定子电流Stator currentA转子电流Rotor currentA出厂日期Manuf. Date接线Connection转速Rotation speedr/min出厂编号Manufacturer No.干燥方法简述Brief discription of drying met
14、hod干燥开始时间Drying start time 年 月 日 时 分Date干燥结束时间Drying end time 年 月 日 时 分Date干燥过程最高温度Max. drying temp.定子 Stator转子 Stator干燥后绝缘电阻及吸收比Insulation resistance and absorptance after drying.测试部位Test position定子对地Stator to earth转子对地Rotor to earth电机温度()Motor temperatureR15(M)R60(M)KR15(M)R60(M)K备注:Remarks结论:Conc
15、lusion技术负责人Check施工人Operator表H-426电机干燥记录附表Attached table for motor drying record项目:Project装置:Unit工号:Section时间Time温度()Temp.定子绝缘电阻(M)Stator ins. resistance转子绝缘电阻(M)Rotor ins. resistance干燥电流(A)Drying current备注Remark123456测温点位置:nTemp. measure position 1. ;2. ;3. ; 4. ;5. ;6. ;技术负责人Check施工人Operator日期Date表
16、H-427电机试车记录Motor test run record项目:Project装置:Unit工号:Section序号No.电机名称或位 号Motor name or tag. No.额定数据Rated data试车记录数据Test run record data环境温度()Envi-ronment temp.试车日期Date容量(kW)Capa-city电压(V)Vol-tage电流(A)Curr.绝缘等级Ins. class绝缘电阻(M)Ins. resis.电压(V)Vol-tage空载电流(V)Vol-tage负载电流(A)No-Load curr.电机温度(A)Motor tem
17、p.轴承温度()Bearing temp.前Front后Rear备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-428架空线路施工记录Overhead line stringing record项目:Project装置:Unit工号:Section线路名称Line name施工日期Date线路电压Voltage线数Line number线路长度Length线路起点Start place线路终点End place施工记录Stringing record电杆型号、规格及数量Pole model, spec. Quantity拉线材料及组数Stay ma
18、terial and quantity导线型号及规格Line model and spec.路灯型号及数量Road lamp model and quantity绝缘子型号及规格Insulator model and spec.路灯线型号及规格Toad line model and spec.弛度Sag耐张杆号(号一号)Anchor pole (No. No.)设计弛度(mm)Design sag实测驰度(mm)Real sag环境温度()Environment temp.对地、交叉跨越距离测量:Line to earth and to cross-over objects distance
19、measurement跨越杆号号一号Cross-over pole No.-N0.被跨越物名称Cross-over object name被跨越物对最近杆、塔的水平距离(m)The nearest distance between crossover object and pole导线对被跨越物的最小垂直距离(m)Min. Vertical distance from line to cross-over object温度()Temp.线中绝缘电阻(M)Line insulation resistanceAB,C,E,OBA,C,E,OCA,B,E,O相位检查Phase sequence in
20、spection备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-429避雷、接地装置安装记录Lightning conductor and earthing device installation record项目:Project装置:Unit工号:Section名称Name施工图号Drawing No.1.绘图或简述避雷及接地装置情况(种类、材质、规格、长度、埋入深度、数量、连接方法、尺寸及防腐等)Drawing or brief discription of the lightning conductor and earthing device
21、 (kind, material, specification, buried length, quantity, connection, dimension and anti-corrosion, etc.)2.接地电阻测量记录Grounding resistance measurement record序号No.测试位置Measure position接地电阻()Ground. resistance试验日期Measure date当天及三天前天气情况Weather of the day and three days ago备注:Remarks结论:Conclusion技术负责人Check施
22、工人Operator试验人Tester表H-430 电气安装记录Electrical installation record项目:Project装置:Unit工号:Section技术负责人Check施工人Operator表H-431交流电机试验报告AC Motor test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacity(kW)型号Model出厂编号Manuf. No.绝缘等级Insulation class定子电压Stator voltageV定子电流Stator current
23、A额定转速Rated rpmr/min接线方式Connect mode转子电压Rotor voltageV转子电流Rotor currentA相数Phase number防爆等级E. P. class直流电阻测量DC Resistance measure 温度Temp. 定子绕组相别Stator phase直流电阻()DC Resistance转子绕组相别()Rotor phase直流电阻()DC Resistance各相直流电阻差别DC Resistance deviation定子Stator %;转子Rotor %;定子绕组极性Stator wind, polar.绝缘试验Insulati
24、on test绕组名称Wind name绝缘电阻(M)Ins. resis吸收比Absorp-tance交流耐压电压(kV)AC Withstanding voltage时间(mm)Time直流耐压电压(kV)DC Withstanding voltage时间(mm)Time直流泄漏电流(A)DC Leakage current定子绕组Stator wind转子绕组Rotor wind电机轴承绝缘电阻(M)Bearing ins. resistance附属设备检查Auxiliary device test设备名称Device name绝缘电阻(M)Insulation resistance直流
25、电阻()DC Resistance起动电阻器Start-up resistor可变电阻器Variable resistor灭磁电阻器Magnetic extinguisher备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-432直流电机试验报告DC motor test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacitykW型号Model出厂编号Manuf. No.励磁方式Excite mode额定电压Rated voltageV额定电流R
26、ated currentA额定转速Rated rpmr/min工作率Work ratio励磁电压Excite voltageV励磁电流Excite currentA1.试验与检查Test and inspection 环境温度:Environment temp. 励磁绕组的绝缘电阻及交流耐硬度试验Excite wind. Ins. R & AC withstanding voltage test M kV min电枢的绝缘电阻及交流耐压试验Armtr. Ins. R & AC withstanding voltage test M kV min励磁绕组的直流电阻Excite wind DC r
27、esistance电枢整流片间的直流电阻Armtr. Back-to-back DC resistance励磁可变电阻器的直流电阻DC R of Excite variable resistor绕组极性及其接线检查Wind. Polar. & connection碳刷位置检查Bruch position inspection2.发电机的空载特性Generator no-Load characteristics励磁电流(A)Excite current电压(V)Voltage备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-433变压器试验报告Tran
28、sformer test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacitykVA型号Model出厂编号Manuf. No.接线组别Connection额定电压Rated voltagekV额定电流Rated currentA阻抗Resistance%冷却方式Cool. mode直流电阻测量:AC Resistance measure 温度: Temp. 高压侧HV side()()()()()低压侧LV side电阻()ResistanceA a B b C c 误差 %Error变压比检查:Transformer rate inspection分接开关位置Tap position标称变比Nominal rate高压侧电压/低压侧电压HV/LV实测变压比Real rate变压比误差(%)Rate errorUAB/Uab(V)UBC/Ubc(V)UCA/Uca(A)ABBCCAABBCCA