江苏联通SGSN培训.ppt

上传人:文库蛋蛋多 文档编号:2224345 上传时间:2023-02-02 格式:PPT 页数:49 大小:5.48MB
返回 下载 相关 举报
江苏联通SGSN培训.ppt_第1页
第1页 / 共49页
江苏联通SGSN培训.ppt_第2页
第2页 / 共49页
江苏联通SGSN培训.ppt_第3页
第3页 / 共49页
江苏联通SGSN培训.ppt_第4页
第4页 / 共49页
江苏联通SGSN培训.ppt_第5页
第5页 / 共49页
点击查看更多>>
资源描述

《江苏联通SGSN培训.ppt》由会员分享,可在线阅读,更多相关《江苏联通SGSN培训.ppt(49页珍藏版)》请在三一办公上搜索。

1、USP4.0 SGSN Training,MotorolaWei M13910215253,Agenda,System OverviewSoftware StructureHardware StructureSGSN ConfigurationHardware ConfGb interfaceGr interfaceGn/Gp interfaceGa interfaceBasic Signaling FlowTroubleshooting,System Overview,BSS,BTS,BSC,PCU,PSTNISDN,Internet,Intranet,MSC/VLR,GMSC,HLR/AU

2、C,SGSN,CG,BG,GGSN,GPRS backbone,RAN,CN,Other PLMN,SS7,SGSN function in GPRS network,GPRS Standard Protocol Interface,System Overview,ATM交换,子系统,Gb接口处理子系统,GTP-C处理子系统,数据转发子系统,计费子系统,N7信令处理子系统,操作维护子系统,时钟子系统,GSN/CG,BSS,OMC/LMT,BITS/LINE1/2,HLR/MSC,System Overview,SGSN Software Structure,First Cabinet of U

3、SP4 SGSN4 PSM SubRack per Cabinet at Max.,System Overview,SGSN Hardware Structure,Rear Slot,Front Slot,For UFCU Only(0-5),System Overview,SGSN Hardware Structure1.Switch Sub-rack,UFCU realizes the interconnection between the basic subrack,the switch subrack and the expansion subrack.UGFU realizes th

4、e external interfaces of Gn/Gp and the transfer of user plane.,Rear Slot,Front Slot,2G service board,UCKI is fixed.,Fixed Configuration,SGSN Hardware Structure2.Basic Sub-rack,System Overview,Contains O&M boards:UOMURealize the clock extract with UCKI boardsContains service boards:UGBI/USPU/UGTP,Fix

5、ed Configuration,SGSN Hardware Structure3.Expanded Sub-rack,System Overview,Rear Slot,Front Slot,Typical 2G expansion Subrack,6+1 for UGBI,together with 2+2 USPU,System Overview,SGSN Hardware Communication(1)Between subracks,System Overview,SGSN Hardware Communication(2)Fiber connection,System Overv

6、iew,SGSN Hardware Communication(3)Clock Scheme,Agenda,System StructureSoftware StructureHardware StructureSGSN ConfigurationHardware ConfGb interfaceGr interfaceGn/Gp interfaceGa interfaceBasic Signaling FlowMaintenance and troubleshooting,Hardware Conf,Basic Configuration:System:SET OFI SET SIGATTR

7、/ADD N7OPC/ADD SCCPOPCSub-racks:ADD SUBRACK Switch subrackBoards:The sub-board of UEEC/UAIC/USS7 could be added same time with front boards.The back board of UPIU/UEPI could be added with the front ones.Except the standby UGBI board(N+1 backup)need to be added separately,other standby boards(1+1back

8、up)will be added together with the active one.UPIU back of UGFU need to configure the port property:SET UPIU_PORT,Gb Interface Conf,Gb interface protocol stack,User Plane,Control Plane,Gb Interface Conf,Gb interface protocol stack,L1(PHY),NS,BSSGP,LLC,GMM/SM,NS,FR,BSSGP,LLC,Control Plane,User Plane,

9、SNDCP,Gb Interface Conf,Configuration Concepts:BC:the bearer channel of FR corresponding to the timeslot group of E1/T1,the timeslot distribution must be consistent with PCU side.PVC:the BC contains some PVCs distinguished by DLCI,the DLCI value must be consistent with PCU side.NSVC:virtual link pro

10、vided by NS layer for BSSGP layer,the NSVC value must be consistent with PCU side.NSE:NSE manages a group of NS-VCs,and corresponding a group of cells.BVC:BSSGP virtual connection is used in the BSSGP layer,classified to Sig BVC,PTP BVC and PTM BVC.One PTP BVC corresponds to one cell.,Gb Interface C

11、onf,Gb interface Example,Gb Interface Conf,Configure Commands:,Gb Interface Conf,Maintenance:BSSGP layer:DSP SIGBVC:;NSVC layer:%DSP NSVC:SRN=0,SN=1;%Sub No.Slot No.E1/T1 port BC NSVC identifier Valid status 0 1 1 0 1020 UNBLOCKED 0 1 3 0 1040 UNBLOCKEDBC layer:%DSP BC:SRN=0,SN=1,PN=0;%Subrack No.Sl

12、ot No.E1/T1 port BC Valid status of BC PVCs activated 0 1 0 0 Valid(unblocked,LMI valid)1Physical layer:%DSP UEPIUTPILNK:SRN=0,SN=1,PN=0;%Subrack No.Slot No.E1/T1 Port Link status 0 1 0 Normal,Gr Interface Conf,Gr interface Protocol StackLocation and subscription management of mobile userUEPI board

13、provide the E1 interfaceUSS7 board provide the MTP2 processing abilityUSPU board process the MTP3,SCCP and MAP layer,MTP1,MTP3,SCCP,TCAP,MAP,MTP2,保证物理传输,进行链路控制,完成网络传输,完成信令网中SP之间可靠的信令传输,有增强的寻址选路功能,控制信令点之间非业务相关的信息的传输,完成移动用户的位置管理、用户数据管理等,Gr Interface Conf,Connect to HLR through STP,Gr Interface Conf,Co

14、nfigure Commands,Gr Interface Conf,Maintenance:SCCP layer:%DSP SCCPDPC:;%DPC index Network indicator DPC OPC Status Loadshare DPC Backup DPC status SCCP status Congest status 0 National network 0 xFF0981 0 xFF099D Allow Allow NULL Allow Non-congested 1 National network 0 xFF0980 0 xFF099D Allow Allo

15、w NULL Allow Non-congestedMTP layer:%DSP N7LNK:;%Subrack No.Slot No.Link No.Transmission service Link fault Link congest 0 4 0 Yes No No Yes No Physical layer:%DSP UEPIUTPILNK:SRN=0,SN=4,PN=0;%Subrack No.Slot No.E1/T1 Port Link status 0 4 0 Normal,Gn Interface Conf,Gn interface Protocol Stack:,-UGTP

16、 changed in board type:GTPC/GTPC_GTPU/GTPUGTPC:GTP-C forwarding,DNS client and NTP client,Need to bind with UGFU and need to configure IP addr.GTPU:GTP-U PDP control and charging data,UGFU boards,UGTP/USPU boards,Gn Interface Conf,Gn transfer realization,Gn Interface Conf,Configuration Commands,Gn I

17、nterface Conf,Maintenance:GTP-C Path:%DSP GTPCPATH:SRN=0,SN=12,IPT=IPV4,PIP4=220.206.131.33;%GTP version of path=GTP V1 Attribute of path=SM path State of path=NormalTST GTPCPATH:SRN=0,SN=12,IPT=IPV4,PIP4=220.206.131.33;GTP-U Path:%DSP GTPUPATH:SRN=3,SN=12,ITP=IPV4,PIP4=220.206.131.33;%GTP version u

18、sed for path=GTP V1 Path category=UDP data path with GGSN Path status=Path normalTST GTPURNCGSN:SRN=3,SN=12,ITP=IPV4,PIP4=220.206.131.33;If Path is down,we could check the IP connection:%PING IP:SRN=3,SN=12,DIP=220.206.131.33;%If not specify a source address,the board IP address is pinged by default

19、.,Ga Interface Conf,Ga interface Protocol Stack:,UGTP function:Transfer CDR between the GSN and the CG.Redirecting the CDR to another CG.Notify the peer entity to re-transmit the data when the unavailable GSN or CGF turns to normal.,Ga Interface Conf,Configuration Commands,SM/MM Conf,Mobility Manage

20、ment:Modify 2G MM software parameters:SET GMM:includes security procedure parameters,P-TMSI reallocation parameters and IMEI check procedure parametersSET GMMTMR:RAU timer,MS reachable timer.SET SDBTMR:purge timer.ADD CONNECTPLMN:add for the roaming user access.Session Management:Modify 2G SM softwa

21、re parameters:SET 2GSM:APN OI,QoS parameters.ADD PDPAPN:set the default APN for IPv4 PDP.Return to home:After the APN customization function works,based on the IMSI or MSISDN number segments,the SGSN can flexibly choose different GGSNs for the MSs to access the PDN in one PLMN.When the MSs use the p

22、ublic APN to activate PDP contexts after the APN customization function works,the SGSN adds a label for the APN to differentiate the MSs.An operator can configure the IP addresses of different GGSNs for different APNs,and thus realize choosing GGSN,Agenda,System StructureSoftware StructureHardware S

23、tructureSGSN ConfigurationHardware ConfGb interfaceGr interfaceGn/Gp interfaceGa interfaceBasic Signaling FlowMaintance and troubleshooting,GPRS Attach,GPRS Attach,GPRS Attach,PDP Activation,Backbone,APN-NI,APN GGSN IP address,APN-NI,PDP Activation,Agenda,System StructureSoftware StructureHardware S

24、tructureSGSN ConfigurationHardware ConfGb interfaceGr interfaceGn/Gp interfaceGa interfaceBasic Signaling FlowMaintenance and troubleshooting,System Fault,1.The performance measurement data is lost in some periods and that in other periods is normal.Possible Cause:the UOMU is reset.the boards relate

25、d to measurement items are reset or switched over.the entire SGSN system is reset.Handling:Step1:Check if any of the following alarms is generated during the data loss period.UOMU reset alarmUOMU switchover alarmSGSN reset alarmStep 2:Check if the boards related to the measurement item with data los

26、s have historical alarms.,System Fault,2-1.DNS connection checkCheck whether DNS resolution works:TST DNSTST DNS:FN=0,SN=12,HOST=“uniwap.1322243.MNC001.MCC460.GPRS,RSVTP=ALL;If failed to resolve,go next.Check the DNS server state:DSP DNSSDSP DNSS:SRN=0,SN=12;(UGTP board)If DNS server no response,che

27、ck the link.2-2 NTP connection checkQuery the NTP Association status:DSP NTPAS211.136.70.98 Yes 71.80.83.0 V3 1-19 3000 0.020 0.007 0.002Query the time sync status of NTP client:DSP NTPSTAT Synchronized to NTP server flag=Yes IP address of synchronization clock=220.206.128.12 Stratum=2 Time precisio

28、n=-7 Reference time stamp=2007-06-07 10:19:19.182 Time sample delay(s)=0.068,Service Fault,3.Attach Reject with GPRS service not allowed”Possible Cause:The MS is roaming and the PLMN to which it belongs is not configured as an interconnected PLMN in the SGSN.The subscriber dose not subscribe GPRS se

29、rvice in HLR.Handling:Check the traced signaling to obtain the IMSI of the MS.Execute LST CONNECTPLMN on the LMT to query information on the interconnected PLMN.If incorrect,execute MOD CONNECTPLMN.If not found,execute ADD CONNECTPLMNIf the subscriber dose not subscribe GPRS sever in HLR,contact the

30、 HLR to confirm the subscription data.,Service Fault,4.After sending out Attach Request,Attach Reject with protocol errorPossible Cause:The global title(GT)code is unavailable for location update because the IMSI-GT table is not configured.Therefore,the attach request is rejected.Handling:Check the

31、traced signaling to obtain the IMSI of the MS.Execute LST IMSIGT on the LMT to query information.If not configured,use ADD IMSIGT to add the GT translation.,Service Fault,5.Description:After the SGSN sends an Update Location message to the HLR,the SGSN does not receive any Insert Subscriber Data or

32、Update Location Ack from the HLR.SGSN sends an Attach Reject message to the MS,carrying the cause value Protocol error,unspecified.Possible Cause:Gr interface has some problem.Handling:Check the traced signaling of Gr interface.DSP N7LNK to query the Gr link status,and DSP UEPIUTPILNK to check the p

33、hysical link status.Or contact HSTP supporter to investigate.,Service Fault,6.Description:All MSs in one cell cannot access the network or implement the GPRS services in a certain period.The Gb interface tracing or Ns interface tracing shows that the SGSN does not send any message to the MSs after r

34、eceiving AttachReq messages from MSs.Possible Cause:After the cell is reset,the PCU does not send the cell flow control message.Thus,the SGSN discards the MS message capsule directly.Handling:Execute DSP PTPBVC to check if the cell receives the flow control message.If the cell receives no flow contr

35、ol message,reset the cell to allow the PCU to report the cell flow control message again.RST PTPBVCIf the fault persists,ask the PCU maintenance personnel to check the PCU settings.,Service Fault,7.Activate PDP Context Reject with Missing or unknown APNPossible Cause:DNS resolution fails and the IP

36、address of the GGSN is unavailable.Handling:Check the DNS resolving:TST DNS:SRN=0,SN=12,HOST=uniwap.1322243.mnc001.mcc460.gprs,RSVTP=SERVER;If no response,check the connection between DNS Server:DSP DNSS:SRN=0,SN=12;And check the Gn interface of the resolved GGSN:TST GTPCPATH,Service Fault,8.The SGS

37、N sends an Activate PDP Context Reject with Activation rejected by GGSN.Possible CausesThe GGSN responds with a failure message.The GGSN response timed out.Fault RemovalTo locate the fault,check the failure cause value in the Create PDP Context Response.If the GGSN does not respond and the activatio

38、n is rejected 30 seconds later,you can infer that the link from the SGSN to GGSN is blocked.Capture the Gn interface packet with Ethereal and investigate further.,MS Configuration,9.MS normal configuration for GPRS:APNThe WAP service use the APN of uniwap.The web service use the APN of uninet.WAP br

39、owseSet the uniwap APN as the default APN on your mobile Input the as the destination linkGo on!MMS configure:Set the MMS URI with the link http:/mmsc-or http:/Select the correct APN for the MMS.Moto Mobile/Nokia MobileAll the CMCC configuration could also be used under unicom network.,MMS,接收方,归属WAP网关,归属短信中心,(7),发送方,发送方归属WAP网关,发送方归属MMSC1,接收方归属MMSC2,DNS,Thanks!,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 项目建议


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号