ie工程师英文简历模板.doc

上传人:laozhun 文档编号:2257042 上传时间:2023-02-07 格式:DOC 页数:5 大小:20.50KB
返回 下载 相关 举报
ie工程师英文简历模板.doc_第1页
第1页 / 共5页
ie工程师英文简历模板.doc_第2页
第2页 / 共5页
ie工程师英文简历模板.doc_第3页
第3页 / 共5页
ie工程师英文简历模板.doc_第4页
第4页 / 共5页
ie工程师英文简历模板.doc_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《ie工程师英文简历模板.doc》由会员分享,可在线阅读,更多相关《ie工程师英文简历模板.doc(5页珍藏版)》请在三一办公上搜索。

1、IE工程师英文简历模板IE工程师英文简历模板Name: Mr. YJBYS Gender: MaleWedlock: Single Nation: HanResidence: Guangdong-Qingyuan Age: 28Location: Guangdong-Dongguan Height: 173cmTarget Locations: GuangdongTarget Positions: Industry/Factories-Industrial EngineerIndustry/Factories-Production Management ClerkIndustry/Factor

2、ies-Technic EngineerTarget Jobs: Industrial Engineer、 Lean EngineerEducation2005-09 2009-07 GuangDong University of Technology Industral Engineering Bachelor DegreeTraining2008-12 2008-12 Guopei Certificate Internal Quality Auditor Training &Qualificationcompany name (2011-07 Present)Company Typ

3、e: Private Enterprise Company Category: Electrical,Micro-electronicsJob Title: Industrial Engineer Positions: Industrial EngineerJob Description: 1.NPI: process planning, fixture and equipment planning, prepare process checklist2.Standard time and capacity evaluation, line balance and prepare SOP fo

4、r new products3.Maintain the usage of the consumptive material, standard time and capacity4.Perform line balance and improve process to rise capacity5.Design and improve the tools and fixture in the work site6.Monitor the efficiency of the production line, analyze these reasons manpower, machine, ma

5、terial , environment, method, push the relative dept to solve issues7.Kaizen project planning and push: Auto-machine introduce, production way optimize, manpower and material saving, etcCareer Highlight:1.Auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 ope

6、rators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan RMB for each PCBA.2.Auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, aft

7、er introduce the new equipment it takes only 5 operator to seal the master carton3.Rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partit

8、ion board4.Decorative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan RMB) and cut down unpack operation time( saving 12 seconds)5.Cooperate with RD to change PCBA process from dispensing process to solder paste p

9、rocess, in order to cut down welding failure rate after wave-soldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)6.According to the small order quantity of the product, study

10、 the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-20 operator*40minutes=340minutes) and improve 8% of the motion effective rateReason for Leaving: Not very good economic benifit of the company,little chance to promote both in position and welfa

11、recompany name (2009-07 2011-06)Company Type: Joint Venture Company Category: Electrical,Micro-electronicsJob Title: Junior Engineer Positions: Industrial Engineer待添加的隐藏文字内容3Job Description: 1.Establish and maintain the standard labor time, perform line balance to improve production capacity2.Load c

12、apacity assessment: Base on the MPS and the capacity of production line to forecast the workforce requirement3.Prepare the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process4.Prepare the workshop layout and line

13、layout design basis on logistics analysis5.Research and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule6.Deal with customer complaint and settle products packaging issue, improve packaging method to satisfy cust

14、omerCareer Highlight:1. Function test man-machine operation improvement: cooperate with TE to disassembleand rearrange test item, and modify the way of program display in the monitor, in orderto realize one person simultaneously operate two test machine2. Line balance improvement: provide the cycle time of each model to set up assemble line speed, and upgrade the line balance rate to 80% above for all modelReason for Leaving: Not a very good department to pratice and learn IE skill,seek more chance to enhance myself

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 项目建议


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号