基坑降水引起的相邻建筑物直接经济损失预测研究.ppt

上传人:laozhun 文档编号:2266491 上传时间:2023-02-08 格式:PPT 页数:55 大小:7.98MB
返回 下载 相关 举报
基坑降水引起的相邻建筑物直接经济损失预测研究.ppt_第1页
第1页 / 共55页
基坑降水引起的相邻建筑物直接经济损失预测研究.ppt_第2页
第2页 / 共55页
基坑降水引起的相邻建筑物直接经济损失预测研究.ppt_第3页
第3页 / 共55页
基坑降水引起的相邻建筑物直接经济损失预测研究.ppt_第4页
第4页 / 共55页
基坑降水引起的相邻建筑物直接经济损失预测研究.ppt_第5页
第5页 / 共55页
点击查看更多>>
资源描述

《基坑降水引起的相邻建筑物直接经济损失预测研究.ppt》由会员分享,可在线阅读,更多相关《基坑降水引起的相邻建筑物直接经济损失预测研究.ppt(55页珍藏版)》请在三一办公上搜索。

1、Direct loss Prediction on Buildings around Construction Pit Caused by Ground Water Pumping,SONG Jianxue,Zhengzhou University,1,in collaboration with SONG Danju,outline,BackgroundGround water table after pumpingGround settlement caused by water pumpingGround settlement and settlement gradientAdjacent

2、 building direct loss predictionPractical application,2,1 Study background,More and more skyscrapers:deep foundation pitsmore and more underground projects Metro underground shop mallResult in:Deep excavation,3,Zhengzhou International Conference and Exhibition Center(ICEC),4,Zhengzhou ICEC Hotel,5,Z

3、ijingshan Metro Station:In the future,the L-2 Metro line will run beneath this station.Here will be a busy transfer center for travelers.,6,Adjacent ground settlement and crack caused by ground water pumping in construction pit,7,Pipeline cut by ground settlement that resulted from ground water pump

4、ing,8,Residential buildings damaged by ground settlement that resulted from ground water pumping,9,How far?,Magnitude?,Is settlement magnitude the only factor?,10,Construction pit ground water pumping,Determining of ground water table and contour after pumping,Building direct loss vs.ground settleme

5、nt gradient,Ground settlement gradient,Determining of ground settlement and contour,Adjacent building direct loss prediction,11,2 Ground water table and contour after pumping,2.1 General algorithm for water table determining,A-Solution of fluid mechanism:strict analytic solution,B-Solution of hydrau

6、lics:approximate solution,(3-D stable flow),(2-D stable flow),12,C-Numerical simulation,Pore water pressure numerical simulation-1,13,Pore water pressure numerical simulation-2,14,Ground settlement numerical simulation-1,15,Ground settlement numerical simulation-2,16,However,these algorithms are too

7、 complicated to be applied in practical project!,On the other hand,most of the Chinese civil engineers are used to following the national codes system,This must be taken into consideration!,17,18,Assumptions:2-dimension stable flow,without water cutting wall surrounding the pit,Determining of ground

8、 water table after pumping,The ground water table may be obtained by,19,(Dupuits equation),20,Loess geological area,Alluvion geological area,21,Before applying,the validity of the formula has to be checked,Six projects are chosen as cases study,and only one is discussed here,Zhengzhou Metro Station:

9、Athlete Center Station,22,23,24,Calculated water table and monitored water table,25,26,Calculated water table and monitored water table,After verification in six projects,it is found that the Dupuits equation can be used to determine the water table after pumping,3.1 Algorithm-soil compression accum

10、ulation(SCA),For the convenience of engineers,the algorithm stipulated in Chinese National Code(SCA)is employed:,3 Ground settlement caused by water pumping,27,S2-usually very small,may be neglected According to the National Code,in order to obtained S1,the modification factor has to be determined f

11、irst,28,modification factor:_determined by local engineering geology condition.,(3.1),Modification factor,29,modification factor,30,Presume comply with the standard normal distribution,31,,,Take as 0.29,then the settlement calculation error,32,4 Building loss results from ground settlement,4.1 Main

12、assumption Only direct loss is taken into consideration,33,34,4.2 AlgorithmThe ground near the construction pit is divided into a series of donuts.(2)Equation(3.1)is employed to determine the settlement of each donut(the middle line of each donut is taken as target).(3)Settlement gradient between bo

13、rdered donuts is obtained.(4)Economic loss rate vs.ground settlement gradient is set up.(5)A certain scope around the pit is chosen,all buildings loss in the scope is accumulated.,35,4.3 Donuts4.3.1 Usually,the geometric center of pit is set as the center of all donuts4.3.2 The affecting scope(taken

14、 as 5Sw,Sw-the depth of water table falling beneath the pit ground)is divided into a series of donuts with the increment as 0.2Sw,36,4.4 ground settlement gradient,37,Ground settlement gradient in the Case Project,38,Generally,the further the distance from the pit edge is,the smaller the ground sett

15、lement gradient is.,39,However,if a donut runs across over the soil surface which is below and above the water table before and after pumping,the gradient here is likely to leap significantly.,40,For the sake of security,1 is taken as the threshold of ground settlement gradient.,4.5 The threshold of

16、 difference settlement building,41,4.6 The relationship between ground settlement gradient(G)and economic loss rate()of building,1 When G is smaller than 1,=0.2 Theoretically,when G approaches,=1.3 Several historical cases are employed to set the relationship between G and,such as,(Above parameters

17、are all from reference),Then,the form of the Equation is determined as,42,The Powell Optimize Method is used to obtain the parameters,then a=0.9692b=30.4862c=-0.03179,43,The formula is derived from masonry structures around construction pit,4.7 Building Direct loss Prediction,The direct loss of dama

18、ged building caused by ground water pumping may be obtained as,V-current value of building,and,VN _rebuild cost of buildingV _depreciation of building,44,5 Practical Application,A case project is chosen to verify the algorithm,45,If a certain building is located in one donut,then G is set as the gra

19、dient of the donut.If a certain building is cross-over several donuts,then G is taken as the maximum gradient of the donuts.,Assumptions,46,47,48,49,50,51,52,DiscussionTake it for granted,the buildings loss will increase with the increasing of water table falling.However,the analysis results show th

20、at although the general tendency of loss increase with water table falling,at some certain spot,the curve turns to the reverse direction.,More detail analysis shows that the building loss is in proportion to the ground settlement gradient,rather than settlement itself,and G is affected by the soil d

21、istribution and water table of a certain area.,6 Conclusions,53,1 The Dupuits equation is verified to be adequate to determine the water table after pumping in construction pit,2 For the convenience of engineers,the algorithm stipulated in Chinese National Code(soil compression accumulation)may be u

22、sed to determine the ground settlement.For the north-east part of Zhengzhou,the modification factor,3 The formula for building direst loss vs.ground settlement gradient is set up as,54,4 The adjacent building loss is proportion to the ground settlement gradient,rather than settlement itself,and G is affected by the soil distribution and water table falling as a certain area.,Thanks for your attention,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 项目建议


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号