1、精选优质文档-倾情为你奉上定向钻导向记录工程名称:盛泽新城区电力通道工程 井位区段:J32J33(舜湖西路) 钻进长度:144m钻进距离(m)4.5913.51822.52731.53640.54549.55458.56367.57276.58185.590角度百分比-24-24-24-24-22-20-14-13-10-7-3000000001平面位移(m)4.14.14.14.24.24.44.44.44.54.54.54.54.54.54.54.54.54.54.54.5水平距离(m)4.18.212.316.520.725.129.533.938.442.947.451.956.460
2、.965.469.974.478.983.487.9探测深度(m)0.81.62.63.94.75.66.77.28.18.78.899.19.19.19.198.88.88.6钻进距离(m)94.599103.5108112.5117121.5126130.5135139.5144角度百分比358101216202325252525平面位移(m)4.54.54.54.54.44.44.34.24.14.14.14.1水平距离(m)92.496.9101.4105.9110.3114.7119123.2127.3131.4135.5139.6探测深度(m)8.07.77.36.96.35.85.24.63.72.61.40导向钻进剖面图导向钻进平面图专心-专注-专业