城市地下铁道连拱隧道群施工技术研究英文翻译.doc

上传人:laozhun 文档编号:2853238 上传时间:2023-02-27 格式:DOC 页数:14 大小:60KB
返回 下载 相关 举报
城市地下铁道连拱隧道群施工技术研究英文翻译.doc_第1页
第1页 / 共14页
城市地下铁道连拱隧道群施工技术研究英文翻译.doc_第2页
第2页 / 共14页
城市地下铁道连拱隧道群施工技术研究英文翻译.doc_第3页
第3页 / 共14页
城市地下铁道连拱隧道群施工技术研究英文翻译.doc_第4页
第4页 / 共14页
城市地下铁道连拱隧道群施工技术研究英文翻译.doc_第5页
第5页 / 共14页
点击查看更多>>
资源描述

《城市地下铁道连拱隧道群施工技术研究英文翻译.doc》由会员分享,可在线阅读,更多相关《城市地下铁道连拱隧道群施工技术研究英文翻译.doc(14页珍藏版)》请在三一办公上搜索。

1、 Urban Underground Railroad arch tunnel Construction Technology Group Abstract Project in Guangzhou Metro Line, right-arch construction method of tunnels to explore. Subway Construction in Guangzhou for the first time put forward a double-arch tunnel to single-hole tunnel construction technology, an

2、d a single type of wall and split in the wall structure, comparison and selection of Technology solutions were obtained to meet the structural safety, construction safety and Economic benefits of better Technology solutions for the future design and construction of similar projects to provide refere

3、nce and reference. Keywords: double-arch tunnel group; a single type of wall; construction Technology; split in the wall. As the circuit design requirements subway tunnel, the tunnel structure produces a variety of forms, ranging from cross-section from double-arch and the three-arch tunnel composed

4、 of double-arch tunnel section is commonly used in the connection lines and crossing lines. In this paper, engineering examples, according to tunnel in which geological conditions, duration requirements, raised through the comparison and selection can achieve rapid construction and the purpose of co

5、nstruction cost savings of the best construction programs. 1 Project OverviewGuangzhou Metro Line Road station turn-back line of sports for sports Road station after the return line, structure complex, DK3 016.047 037.157 varying cross-section set the double-arch structure, three-arch structure of t

6、unnels. Ranging from cross-arch tunnel excavation span 20.1m, excavation height of 10.076m, cross-vector ratio of 1:0.5, after lining a hole span 5.2m, large holes, after lining span 11.4m, the wall thickness of 1.6 m. Three double-arch tunnel excavation span 19.9m, excavation height of 7.885m, cros

7、s-vector ratio of 1:0.1. -Arch tunnel section of rock from top to bottom are: artificial fill soil, red - alluvial sand, alluvial - alluvial soil, river and lake facies soil, plastic-like residual soil, hard plastic - a hard-like residual soil, all weathered rock, strong weathering rock, the weather

8、ed layer and the breeze layer. Tunnel through the rock strata are more homogeneous, the intensity high, carrying ability, good stability. Thickness of the tunnel vault covering 15.5 18m, of which grade Wai rock vault thickness 5.6 7.6m. Double-arch tunnel segment groundwater table is 2.28 4.1m, main

9、ly Quaternary pore water and fissure water. Section 2 dual-arch construction scheme comparisonAs the double-arch tunnel segment structure more complex, the tunnel cross-section changes in large, complicated construction process, construction was very difficult, the construction cycle is long, so I c

10、hose a good quality and efficient completion of the construction program segment arch tunnel construction is particularly important. Selection of a construction program, the main consideration the following aspects: (1) construction safety and structural safety; (2) construction difficulties; (3) th

11、e construction cycle; (4) cost-effectiveness. Based on these four principles, through the construction of research and demonstration program to select the following two programs to compare the selection of the construction.2.1 a single type of wall construction plan The programs main construction st

12、eps and measures are as follows: (1) The right line of double-arch tunnel hole within the return line side of temporary construction access, dual-arch and the three-arch in the wall construction, is completed in a timely support for the wall, the construction to prevent bias. (2) construction of the

13、 wall lining is completed, according to first small then big, closed into a ring principle, the right line with the step method of construction, with CRD engineering method returned a four-lane span tunnel construction. (3) When the return line side of the construction to the three-arch tunnel in th

14、e wall, then in accordance with the right line of the wall construction method and the three-arch-arch in the wall construction, during which the right line to stop excavation until the completion of construction of the wall. (4) The return line side of the wall construction is completed, the right

15、line to continue to move forward the construction. The construction method for the domestic double-arch tunnel of conventional construction method, Guangzhou Metro, Nanjing and Beijing Metro subway both applications, and can secure successful completion of the construction of tunnels. However, examp

16、les of past engineering and construction Technology research can be found, the program has weaknesses and shortcomings. (1) The program used in this project, in a short span of 21.11m of double-arch tunnel, the tunnels opening between the supporting and secondary lining will be converted four times,

17、 the conversion too frequently. (2) wall and side holes covered by waterproof layer of tunnel lining construction, steel engineering, formwork, concrete pouring required multiple conversions, the construction period up to 2 months. (3) The lining is completed, the wall of anti-bias materials, equipm

18、ent, support and input, resulting in higher construction costs, Economic efficiency will drop. 2.2 The split in the wall construction plan The programs main construction steps and measures are as follows: (1) ranging from cross-double-arch tunnel into two single-hole, change the formula for the sepa

19、ration wall, the first line of one-way right-forward construction of the tunnel. (2) three arch tunnel in the wall to make the first non-Shi lining, according to single-line working condition through. (3) the right line of large-section double-arch tunnel wall construction method adopted in accordan

20、ce with CRD. (4) The return line is in accordance with the right line of the opposite side of the construction sequence of construction. Adoption of this program is in fact a one-way in accordance with the construction of two methods, compared with the previous one, after the program has the followi

21、ng advantages:(1) reduction of the construction process to speed up the convergence process conversion. (2) reduce the construction difficulty, shortening the construction cycle. (3) reduce the construction costs and improve Economic efficiency. (4) change a single type of wall to separate the wall,

22、 completely solved the structure of double-arch tunnel waterproofing defects. (5) The three-arch tunnel in the latter pArt of the construction hole, equivalent to large-span rock tunnels reserved for the core is conducive to both sides of the double-arch tunnel construction safety (Table 1). Section

23、 3 three-arch construction plan Right-line direct access to three double-arch tunnel, the Support parameters to the original designs for grating erection of the whole ring, according to design the whole ring of shotcrete, and enhance the bolt at the wall vault settings (return right side Tong Line C

24、onstruction method), wall construction in the tunnel when you need to get rid of Office, located at a vertical grill joints strengthened beam. Strict control of excavation footage of each cycle, grid spacing of 0.6m / Pin. Weak in the wall excavation using millisecond blasting program (conditional m

25、aximize the use of static blasting programs), minimize the wall rock and the lining of the tunnel has been disturbed, to ensure construction safety. The completion of excavation in the wall immediately after the secondary lining. After the completion of construction of the wall in wall voids of the

26、backfilling, plus jack supports. The side of the construction is completed, carry out the other side of the wall construction. When both sides of the wall construction is complete, in a timely manner on both sides of a single-hole tunnel secondary lining, and then proceed to three-arch tunnel excava

27、tion and lining of the middle of rock. Construction, special attention should be three arch tunnel in the wall at the settlement and convergence deformation, such as the unusual phenomenon, an immediate reinforcement.4 construction of the force structure of Behavior Analysis Across the range of the

28、double-arched wall canceled, changed to separate the wall, in the domestic urban underground railway engineering has not yet been a similar engineering design and construction experience, there is no such tunnel structure design, and therefore the structure is safe, as well as the course of construc

29、tion conversion process of construction is safe, the program will be the focus of the study. Application of ANSYS finite element software for common procedures ranging from cross-arch tunnel numerical simulation, using stratigraphic - structural model of the structure of the tunnel by the force and

30、deformation analysis (Figure 1, Figure 2, Figure 3). The scope of the horizontal direction taken by force along the direction of the tunnel cross-section to cross-hole 3 times the limit, taking the top of the vertical direction to the surface, the bottom-hole span to 3 times the limit, unit model us

31、es the DP formation of elastic-plastic material entity, the tunnel Lining with elastic beam element simulation, beam elements and solid elements used to connect coupling equation. Through the analysis of data in Table 2 we can see that during the construction of large tunnels in a greater impact on

32、small tunnel, if a small section of the tunnel with the necessary strengthening of measures and control the removal of temporary support to the longitudinal spacing, the program is useful and feasible to The.5 Construction of key technologies and corresponding measures Arch tunnel construction segme

33、nt is required on a strict construction organization and strong technical assurance measures carried out under the good job in organizing the construction of steps to prepare the construction of a variety of technical preventive measures are key to success.5.1 pairs of pull anchor and strengthen the

34、 bolt Abolition of a single type of wall, the excavation is complete in the wall thickness of 0.8m, pull anchor and strengthen the right bolt set is very necessary. 22 steel bolt used on the pull bolt drug volume, pitch, 0.6m 0.5m, the length of the wall thickness according to the 0.8 2.0m. Strength

35、en the bolt in the wall located at the invert and side walls at both sides, using 3.0m of 25 hollow grouting anchor, spacing 0.6m 0.8m. 5.2 in the body wall, grouting rock block folders In the wall of rock thinnest Department to 0.15m, after repeated blasting excavation process, the impact of the ro

36、ck wall around the loose, their bearing capacity affected. Therefore, we must separate the wall in the vault, wall, invert Department for loose rock for grouting. 42 embedded steel, cement slurry to take - water glass pairs of liquid slurry, the parameter of 1:1 cement and 30 45Be sodium silicate so

37、lution, grouting pressure of 0.2 1.0MPa. In both excavation grouting in the wall were carried out, after the completion of the final excavation carried out in saturated sandwich wall grouting. 5.3 millisecond blasting technology microseisms Tunnel excavation construction method used in all drilling

38、and blasting. Because the lot is located in downtown Guangzhou, the ground-intensive buildings, and the Tunnel 0 spacing excavation, blasting must be set aside in accordance with glossy layer of smooth microseismic millisecond blasting program construction blasting vibration control will be allowed

39、within the . For the double-arch tunnel in which strata of , grade rock blasting to take measures as follows: (1) The blasting equipment, using low-speed emulsion explosive shock. (2) strict control of footage per cycle (0.6 0.8m), around the borehole spacing of 0.4m, reduce the loading dose to cont

40、rol the smooth blasting effect (Figure 4). (3) The use of multiple detonators per blast detonation, using non-electric millisecond detonator initiation network asymmetric micro-vibration technology. (4), excavation and construction of the wall at the second to take first reserve 1m smooth layer, Cut

41、ting away from the eyes arranged in the side of the wall on the second floor reserved for smooth blasting around the eyes more than surface layout of the empty eyes, a small charge. Put an end to ultra-digging, digging, when partially due to artificial air pick excavation. Through the above effectiv

42、e measures, in the wall during the construction of the second blast, right in the thick wall of 0.15m basic did not cause damage to the smooth passage of the double-arch tunnel 0 from the excavation.5.4 Auxiliary scissors to strengthen supporting By ANSYS simulation analysis, in order to ensure that

43、 small section of tunnel construction safety, the need for auxiliary support of small section tunnel reinforcement to resist the impact of blasting and rock produced by the instantaneous release of excavation loads generated by bias. Supporting materials, using I20 steel, welded steel plate embedded

44、 in the grille on both ends, using high-strength bolt reinforcement. Support arrangement spacing of 0.6m, which are arranged on a grid for each Pin, arranged to extend the scope to a double-arch on each side of 1.2m, and the completion of the excavation before the big end. The height and angle of su

45、pport arrangements to ensure the smooth passage of construction machinery and equipment. Through the construction of proof, supporting the setting is necessary and effective, small-section tunnels in additional support after the convergence of scissors just 5mm. 5.5 Information Construction In order

46、 to ensure structural safety and construction safety, in the tunnel construction process to carry out real-time monitoring measurements to study the supporting structure and the surrounding strata deformation characteristics to predict the corresponding supporting structure deformation and verify th

47、at the supporting structure is reasonable, for the information technology provide the basis for the construction. Construction Monitoring and Measurement shows a small section of the tunnel maximum settlement of 14.6mm, maximum settlement of large-section tunnel 17.2mm, structural convergence of a m

48、aximum of 7.6mm, maximum ground subsidence of 10mm, three-arched vault in the largest settlement of tunnel excavation 22.8mm.6 Construction Summary Through this project example, proved that the use of separate programs to ensure that the wall construction of tunnels section of arch construction safety and structural safety, duration of more than a single type of wall construction program faster 1.0 to 1.5 months. This project for similar futu