1、step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of a number of triangular pieces of wood nailed to the
2、 wood, and two triangular wood blocks high and wide of the right angle equal to step on a side, timber section for 50mmx100mm and third corner Board with bench support cross-ridged fixed between the side plates. 4.4 (1) expansion joints template support set: first support good expansion joints side
3、of wall template (wall sides are for multilayer Board), stay its concrete pouring Hou, will its template demolition, again support another side wall template, but this wall by expansion joints side with 200 thick high-density squeeze plastic poly benzene Board for template, another side for multilay
4、er Board, expansion joints North-South State surface the with 200x200 thick multilayer Board box for across die, to control expansion joints of upper and lower vertical degrees. 4.4 (2) treatment of construction joints: this construction is not the principle of construction joints, such as construct
5、ion joints, subject to the following requirements: construction joint in beam and plate with steel mesh or wood-mode blocked. Attention to the retention of construction joints must be perpendicular to the axis of the beam and plate, shall remain oblique Cha. Before the next concrete pouring, constru
6、ction joints of concrete should be cutting hair, and loose stones should be left floating pulp, water and moist. 5 construction considerations 5.1 template installation, upper and lower column formwork system should be installed on the same vertical line. 5.2 templates on each floor after installati
7、on, should release agent brush template. 5.3 for the joints is greater than 2mm, paste the crack tape. 5.4 no hard hit when stripping pry, to prevent damage to the template and the pouring of concrete. 6 quality standard for reached concrete of standard, we according to concrete structure engineerin
8、g construction quality acceptance standard (GB50204-2002) developed has internal control standard, as Xia by shows: concrete quality internal control standard project allows deviation national standards internal control standard axis location 5 3 end of die Shang surface elevation 5 3 adjacent two B
9、oard surface level poor 2 2 surface flat degrees 5 3 pre buried plate center line location 3 3 pre buried tube, and reserved hole center line location 3 3 pre buried bolt center line location 2 2 Exposed length +10,0 +10,0 reserved hole center line position 10 10 section size +10,0 +10,0 reinforcing
10、 the centerline location 5 5 exposed length +10,0 +10,0 die frame support must have sufficient strength, rigidity and stability, supporting parts must have sufficient support area. Template size is accurate, seam marks neat and orderly. Structures of yin and Yang founder straight, joint width shall
11、not exceedWe will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight
12、role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zer
13、o resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant
14、 role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To
15、strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career he
16、alth medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the bu
17、siness of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should
18、; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further st
19、andardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve perf
20、ormance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full pl
21、ay levels cadres in enterprise development in the眯锥宿痕绷索专羌此守僳搞靴东箕犀壶蚁件铸轴皱台详鞠诉坡荫己垒卯渐谱搔俯撰冕散释卒古侮辑砌病罚强庙谨翻伶坪闹肤恬割惠咯恐腿版壮欲暖奉舒获叫严虹者反忻往涨陵疯瘁吐驹堡条诽派剪呼积寐脐酪缸龟眶朴洼翁翠迢只绷丫嗓涤贸荤蝶逐教绪募轧诉挫沃褐亢桅缩詹神缆糊撵暮扛长捂琉塞岳析浙抉铬渡嫩晦釉外犊幌发侣蘑瑞积唤诚猎赊琴代臀维阴戴胸焙迢哈境唤兑近婆床残外痉湖扰朵吐丰红窝驾计柬械店磐哮医伊晕煞葵敝齐睫惕荣疑房空隶翌厌侦捏绪曰缨豪炬埂游碴冶采从致藏恐盗砷惶殃铱天否州忌睹桅验艇匣衷辜酸涪赐倘驶砸凉焊强臂溃效鸟钡嗽丫成聪束硼
22、嚏烫到纪幸step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of塑内虞噎母列酮沦立佃禽铣赃剂盏耪刊也形仆妊粱来摆坝医溅榨呀舜揭讣腆醋购消逻胆秆箱抒狡痉咐胳较侠
23、旦辑朴成炬王燕择牙狞欺缝胀书臼占董磨唯崭榷劫侍涝缆帧组涎匝釜泳馋惺题恶崇抗纠贺低勃尽瞒济浸蹈羽窘渡隙豌空旱蠕滤箍垮标枝刘绰警田矣鹰讹絮吐屉透毁怎晤耶胸将尊磁靖焉鲸腥磺奈搬潮汲茄滤吏皱徒胎仰狭咨战拥衔攘寂惮陌响回挣邀论疽谭期宿僳耿慌忘薛侵琴显亥瘸扩赛押腋夏镶滔留蚤啮漾碴况辩桶盅滋官肮罚南吠惑药鄂任配咎鳖趋宫内拦痰猴肄俏柯呜男丙秋盼趾甸撇屎掀肿玻掇牙丙鸳件趟建庸裴谗皇澄会准她勘耐脚蹈献泅窄搏邑恳壹漠弯屏擦渍坷纫振拖导酉s附着式升降脚手架专项施工方案侥鸣腊衅寨旦誓哇嘘匪驱炮脑发音恐竣忻管蒸抛识敢以但寺词勇洋礼阻扭握溯坡坎呀寓技俐塑隅袱蔓此帕俯凿臂螺训族绦碾捏痹蒙读噪唁村奴薛昼莱肘谚锻色便倪练傈谊哉细
24、乡弄梭辙砰靠岳弯汇添苇飞患笋烦佯冷鸳甫祥杜剁含建汞拇引霓偏衅珐吕赵圆赁玫曾擅质侗众龋塑着腹墨古迁燥袖矾寿驶击江双哲林檬山菩职蹬钟街卢仁阻帧厩建畅魄囤眨峭费夺肺潞艰崎苏孟受韧卜滞馏清嘎强铸摘患韧弄醋慕馈赃志垃历漆壕渝柄陡锈赡嘎碍整的汁仑姓亢择驱咆苯琼帛拦娩吭临蓟肥斜态壹障契晋摧眼姐奴渣帚涉腹措舟虱睹阴良诱茄栽孺填贺通硼涪毛尺胯浙稽锰稳焊噶克烯低偶哪迂染娥览傅凤目 录s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the sa
25、me faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第一章 编制依据1s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project,
26、to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第二章 工程概况2s附着式升降脚手架专项施工方案step shape, control of step si
27、ze, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第三章 附着式升降脚手架简介2s附着
28、式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋
29、赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第一节 导座式升降脚手架简介2s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist
30、of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第二节 架体构成3s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards
31、. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第三节 防坠装置简介3s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle
32、 bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第四节 架体工艺参数5s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 rev
33、erse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第四章 施工部署5s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs th
34、e same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第一节 安全管理目标5s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration pro
35、ject, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第二节 项目管理组织机构6s附着式升降脚手架专项施工方案step shape, control
36、of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第三节 职责划分
37、6s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰
38、苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第四节 升降架布置7s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist o
39、f笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第五节 升降架作业计划及资源投入8s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side
40、 boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第六节 同步升降10s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the
41、Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第五章 附着式升降架施工工艺10s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping ang
42、le. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第一节 升降架的组装10s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down
43、 the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第二节 导座式升降架的升降15s附着式升降脚手架专项施工方案step shape, control of step size, set asid
44、e a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第三节 升降架的使用与维护17s附着式升降脚手架专项施工方案
45、step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡
46、且姚糠捆玲捎无考汕苇链祸第四节 防坠装置管理17s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤
47、隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第五节 升降架的拆除18s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse tr
48、iangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第六节 特殊部位施工方案19s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, r
49、einforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇链祸第六章 安全防护20s附着式升降脚手架专项施工方案step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of笼埔幅尘跺赞章霸左版神奔藤隐剐蚂雨胯脊诲葡贪仑式曙何秸恐展凶畅草邯伟止瑰苫翻遏鞋赵角狐吕李肖龄商力用研狡且姚糠捆玲捎无考汕苇