1、rehabilitation training, because at that time the city has not specifically for deaf children of professional rehabilitation agencies, she will accept rehabilitation training must go to Suzhou, due to her age is too small must take care of their parents, her mother had to resign to Suzhou to take ca
2、re of her, thus to their family brought two problems, one is the economic pressure, second, children are in the most need caring parents feel Term age and father separated, unable to feel the happy family to grow. In order to avoid more and more families appear this kind of circumstance, actively co
3、ordinating the city FIMITIC established rehabilitation center, operation center for the XX membership received rehabilitation training of special children and parents brought great convenience, to enable them to the nearest and handy to get high-quality rehabilitation services, Huimin policy of the
4、Communist Party of China has been fully reflected.Regular organization of the fast forward, three special children into society. Due to the special childrens own disability, they rarely and social contact, we hope that in their rehabilitation training can have more opportunities to integrate into so
5、ciety, by the municipal CDPF coordination has been relevant departments of the strong support, promote the special children into social work: one is the municipal CDPF and City Bureau of education in training children rehabilitation assessment, 2015 years 3 hearing-impaired children get a rehabilita
6、tion of the good results, enter the ordinary kindergarten and primary school; the second is the city library volunteer monthly to center on childrens stories, playing games and other entertainment activities, into a Step broaden their way of thinking; the third is under the support of the City Board
7、 of education, the center will and Yanshan Mountain kindergarten cooperation, fusion education project weekly by the special education teacher lead 1-2 hearing-impaired children into Yanshan Mountain kindergarten accept half a day of kindergarten education, let children with special filling feeling
8、kindergarten learning atmosphere, for their future access to kindergarten and primary school lay a solid foundation., handicap love, care for children with special. Caring for children with special needs to let them with healthy children as happy growth but also our work direction: one is actively c
9、ontact the society from all walks of life of the difficulties children with special care and support this year in coordination with the city FIMITIC, Ningbo Bank Co., Ltd. XX branch president assistant Zhao Yi for a row represents dandelion love fund to in the center received rehabilitation training
10、 of Xu Yang and Xu Miao brother and sister to send two of the loving enterprises special care; the second is actively contact the love team and community volunteers to the children in the center to all kinds of theatrical performances and interactive games, let them enjoy the happiness in the activi
11、ties, and further enrich the Their spiritual and cultural life.Five, increase the propaganda of rehabilitation services, and further enhance the sense of rehabilitation. In the suburbs especially in rural areas, to disabled技 术 标工程编号:CEET-GC2010-005工程名称:迁安市九江200万吨/年焦化污水处理机电及工艺管道安装工程批准人:审核人:崔景宽编制人:刘晓宇
12、三冶管道公司2010年6月18日目录一. 工程概况-3二. 施工方案-4三. 人员配置-12四. 施工机具配置-12五. 施工计划-12六. 安全措施-13七. 施工技术标准选用-14八. 施工质量保证措施-14九. 施工平面图-15一. 工程概括:本次招标工程项目的招标范围主要包括焦化污水处理(吸附池、隔油池、酚水井)及泵房;调节池、事故池、生化反应池、后处理(污泥浓缩池、二沉池、混凝沉底池)及后处理泵房、综合处理泵房、布水器泵房、风机房等的机械设备和工艺管道安装调试项目。主要设备一览表序号名 称型 号 及 性 能单位数量1刮油刮渣机12MP-2台42编缆式撇油机SY-120 Q=2000L
13、/h套43双吸离心泵600S75A Q=3400m3/h H=60m台84配套电机Y560-6 N=800Kw n=970r/min V=10Kv台85潜污泵WQ20-9-1.5A Q=20m3/h H=9m台2配套电机Y型电机 N=1.5Kw N=1470r/min v=380v台26渣浆泵40PV-SP Q=26.64m3/h H=22.5m台2配套电机Y132S1-2 N=5.5Kw n=2100r/min V=380v台27电动桥式吊车G=10t Lk=10m 起升高度10m台18电动抓斗式吊车G=10t Lk=21m 起升高度15m台19立式泵600LT-1100X2 Q=3000m
14、3/h H=39m台910泵配电机YL500-6 N=500Kw V=10Kv台911立式泵200LT-400X3 Q=300m3/h H=37.5m台112泵配电机YL250M-4 N=55Kw V=380v台113膜片式水泵控制阀 DN600 P=1.0MPa台914膜片式水泵控制阀 DN250 P=1.0MPa台115电动组合(三片)式矿浆阀 DN600 P=1.0MPa台916双偏心金属硬密封电动蝶阀 DN600 P=1.0MPa台117桥式起重机 Lk=28.5m Qt=16t台118铁皮抓斗 V=2.5m3 台119SG手动单轨小车 Qt=5t台1二.施工方案1.基础验收 在接到工
15、序交接单后,应对接到具备安装条件的基础进行复测,主要复测内容:1)基础不得发生倾斜,表面应无孔洞,麻面,不漏筋.2)基础表面及地脚螺栓孔内的模板必须拆净,螺栓预留孔内无异物、碎石等,孔内如有积水、油污必须清除.3)根据蓝图所给的尺寸,对基础的几何尺寸、螺栓孔距、预埋件数量、预埋件位置、标高、表面不平度进行复测.4)所有的基础必须有明确的标高点,坐标位置的纵横轴线,复测结果必须符合下表规范的规定.序号项 目极限偏差1基础各不同平面的标高+0-202基础坐标位置(纵横轴线)203基础上平面外形尺寸凸台上平面外形尺寸凹穴尺寸20-20+204基础上平面的水平度(包括地平上需要安装设备的部分)5/10
16、0010(全长)5竖向偏差5/100010(全高)6预留孔地脚螺栓:中心位置 深度 空壁垂直10+20102.垫板的选择经计算后垫板规格选用16090mm每根螺栓各垫两组垫板,满足要求.3.设备的吊装搬运由于平流池的水泵房土建已全部施工完毕,泵房已全部封闭,设备运进室内比较困难,由其室内的10t桥式吊车必须先安装,因为室内所有设备都靠它吊运安装.泵房上盖已全部封闭,大部分防雨层已做完, 但是受现场实际位置所限,只能在M N跨揭开盖板,利用30t汽车吊站在草图所示位置,将天车吊装到泵房内的天车轨道上. 由于泵房已封盖,电机、双吸泵只能从大门口水平移进,因为室内天车只能到大门口4m处,双吸水泵单重
17、约4.3t配套电机重约6.15t,膜片水泵控制阀重2.5t由于室外汽车吊只能送到泵房的大门口,室内的天车又决不允许外拉斜拽,只有采取临时措施,具体办法如图示用型材在室外做一平台,与室内地平标高相等,或略高于室内,用6根钢轨或工字钢铺在上面做滑道,室内设水平底滑轮,然后利用室内天车做动力,将设备拽入室内天车能吊到的位置.4.双吸泵的安装:设备运到现场后,如果出厂日期在泵的防锈保证期内,又无明显的缺陷,泵不宜拆卸,只作表面的清洗和检查,泵的安装纵向、横向水平偏差不应大于0.10/1000mm,在泵加工面上测量,由于基础的设计为预留孔,泵需两次安装,初找正时,在土建浇灌地脚螺栓时要注意检查地脚螺栓是
18、否碰歪,以防水泥凝固后螺栓歪斜无法处理.当泵体精找各项指标符合国标后,在安装电机,此时应检查两轴的同心度,通过测查联轴器的同心度,调整电机使联轴器的径向位移、端面倾斜和联轴器的端面间隙达到标准要求.立式泵安装时,各部件的轴线均应与泵座轴线重合,泵座法兰面不水平偏差不应大于0.05/1000,各法兰连接面接触要严密,无渗漏现象,联轴器端面之间应无间隙,接触应严密,螺栓应均匀拧紧.弹性柱销联轴器装配允许偏差联轴器外形最大直径D(mm)两轴心径向位移(mm)两轴线倾斜端面间隙s(mm)90-1600.050.2/100023195-2002.54280-3200.0835360-410464800.
19、157540686305.设备安装 刮油刮渣机的安装按随机技术文件及说明书的要求进行安装,因设备是在轨道上运行,轨道安装的好坏直接影响到设备的运行. 轨道安装前应对其池面上的预埋件进行测量,记录下各点预埋件标高的高低差,所用的钢轨要对端面直线度,扭曲进行检查,合格后方可使用,钢轨铺设时,可将一根钢轨断为两截,铺在两条钢轨的起始端,一根在轨道的南端,一根在轨道的北端,使两轨道的接头错开,两平行的钢轨的轨距4m,两平行轨道端面的高低差5m,纵向不水平度10m,对于其它方面的要求按蓝图中的技术要求进行.6.工艺管道安装所有工艺管道安装均采用V形坡口,坡口形式如下表管道焊缝加强面标准(mm)管壁厚度s
20、20加强面高c1.5+12+13+1焊缝宽度e1-22-32-3管道安装的技术要求:除蓝图要求外,均按国标GB50235-97执行,需要注意的是焊缝离开支架不得小于100mm,所有管道在与泵体连接时均应处于自由状态,绝对不允许给泵附加外力,如使用卷制钢管,对接时焊缝要相互错开大于100mm,不准形成十字焊缝,焊缝距离弯管从起弯点算起不得小于100mm,管件制作或安装时在焊口两侧应先刷些涂料或白粉,这样很容易清除干净焊后的飞溅.1600环形管制作见下图1,下料见下图2。7.管道的试压,吹扫方案,设备的无负荷试车规程另行编制 图一图二三.人员安排工种铆工配管钳工电焊气焊架工电工后勤数量624664
21、16四.配置施工机具1.电焊机 6台 交流2.气焊工具 6台套3.框式水平 2个 200mm 1个 150mm 1个4.角磨机 6台5.水平仪 1台6.经纬仪 1台7.电动水压泵 1台 1.0MPa8.弹簧秤 1个 200N9.千斤顶 3台 (5t、10t、30t)10安全灯变压器 1台11.链式起重机 12台 (2t、3t、5t)五.施工计划六.安全措施1.开工前要对全体参加施工人员进行周围现场介绍,遵守工地甲乙双方制定的安全规章制度,不得违犯.2.在平流池池边工作时,池边要设置临时防护栏,防止在池边工作人员掉入池内.3.泵房内管沟有人作业时,基础面上不得堆积杂物,以防掉进沟内伤人,如必须堆
22、放时,要放置牢固,固定住.4.在旋流井下面作业时,因上面有孔洞,又无法遮盖,要设警示牌,提醒附近人,下面有人作业或设人看护.5.旋流井、平流泵房地表以上、行人平台上,碎石、碎铁头要清理干净,以防行人踢下,伤着下面作业人员,如需在上面作业,每天工作完毕,必须清理干净.6.在安装抓斗吊时,由于露天无挡墙,在高空轨道两侧作业区域设临时护栏,待天车安装完毕后拆除.7.旋流井和泵房内如需照明,要用电缆线,不得使用胶质线,如用手拿灯,要采用24v安全电压.8.所有电动工具、器具都要做好接地保护.9.现在正值雨季,室外作业如遇阴雨天,要停止作业,确实需要,要配置雨具,并穿戴好绝缘鞋、绝缘手套.10.地坑或井
23、内干活,氧气、乙炔要放在室外.11.用天车向井内、泵房内吊装设备时,要由专业起重人员作业,并要设专人指挥作业.12.施工临时用水用电要由负责人与甲方取得联系,联系好后再接,不得私自乱接.七.施工技术标准选用1.设计蓝图首页施工说明 图号19.4-9水1-1 19.4-9水2-12.工业金属管道工程施工及验收规范 GB50235-973.现场设备工业管道焊接工程及验收规范 GB50236-984.通风与空调工程施工及验收规范 GB50243-975.采暖与卫生工程施工及验收规范 GBJ242-826.机械设备安装施工及验收通用规范 GB50231-987.压缩机、风机、泵安装工程施工及验收规范
24、GB50275-988.起重设备安装工程施工及验收规范 GB50278-98八.施工质量保证措施1.施工作业单位认真审核图纸及有关技术资料做好施工准备工作,如人员安排,材料机具准备,对施工人员进行技术交底.2.设置质量管理点,如立式泵,双吸泵的安装,管道焊接等质量关键工序严格控制,严格管理,标准化作业.3.认真执行三捡制,做好自检、互捡,并如实填好施工记录.4.对施工中发现的设备,材料有缺陷应及时处理,如果不能处理,应及时提出,会同有关人员协商不得擅自施工.5.所进的钢材、焊接材料、油漆等必须有有效的材质证明,合格证或其它书面证明的材料.九.施工平面图office.children are i
25、n need of early detection, early intervention. Early rehabilitation concept is relatively weak, is generally believed that developing children behind with the growth of the age will continue to improve, to increase the propaganda of rehabilitation policy and the concept of rehabilitation is crucial.
26、 For this center to increase efforts to promote the relentless efforts: is to assist the city FIMITIC in national ear care day national helping the disabled day during major festivals held special rehabilitation knowledge lectures, rehabilitation policy and rehabilitation concept and a series of pub
27、licity activities; the second is on a monthly basis to carry out parent training and rehabilitation guidance Into the family and other rehabilitation services. Two regulations promulgated in party power for a long time and under the condition of governing the country according to law, implement the
28、full strictness of strategic deployment, implementation by Board Trustee administering the party and strengthen the inner-party supervision of major initiatives. Two rules match, the guidelines adhere to the positive advocacy, LiDE, party members and cadres to visible, reach the high standards; Arou
29、nd discipline cracked the requirements of the regulations, set out a negative list, and focus on State control, which gives the party organizations and party members out of the bottom line. The following, mainly from four to two party rule interpretation: first part of both necessity and process of
30、legislative changes within the party; part two interpretation of legislative changes within the party principles of part two of regulation within the party after the third major change and several key issues need part on how well the two implementation of inner-party regulations. A, the guidelines a
31、nd the regulations of the need for revision and revision process of Central Committee of CPC party members and leading cadres honesty in politics a number of amendments to the guidelines and the Chinese Communist Party disciplinary regulations classified as 2015 1 the focus of strengthening the cons
32、truction of partys laws and regulations. Two party rule revisions last year, centralized the party wisdom, gather consensus, learn from historical experience, respect for wisdom, reflecting the unity of inheritance and innovation; Follow the correct direction and seize the limited objectives, uphold
33、 the partys leadership, people, centered on solving problems. New standards and regulations, as amended, and reflects the partys 18 and 18 in the third, four in the plenary session, reflects the experience of studying and implementing the XI series of important speech, General Secretary, reflects th
34、e partys 18 since the comprehensive practice of strictly administering the party. (A) the need to amend the two regulations in the party of the code was in 1997 the CPC party members and leading cadres honesty in politics a number of standards (for trial implementation) revised on the basis of which
35、, published in January 2010, on strengthening the construction of leading cadres play an important role. But with the deepening of the party controls the party, strictly administering the party, has been unable to fully adapt to the needs. A is content had fan, 8 a ban, and 52 a no to remember, and also to practice line; II is gel refining positive advocate insufficient, ban sex terms too much, no reflected self-discipline of15