hh汉源二中南侧步行梯道建设项目施工组织设计.doc

上传人:sccc 文档编号:4791738 上传时间:2023-05-15 格式:DOC 页数:245 大小:1.16MB
返回 下载 相关 举报
hh汉源二中南侧步行梯道建设项目施工组织设计.doc_第1页
第1页 / 共245页
hh汉源二中南侧步行梯道建设项目施工组织设计.doc_第2页
第2页 / 共245页
hh汉源二中南侧步行梯道建设项目施工组织设计.doc_第3页
第3页 / 共245页
hh汉源二中南侧步行梯道建设项目施工组织设计.doc_第4页
第4页 / 共245页
hh汉源二中南侧步行梯道建设项目施工组织设计.doc_第5页
第5页 / 共245页
点击查看更多>>
资源描述

《hh汉源二中南侧步行梯道建设项目施工组织设计.doc》由会员分享,可在线阅读,更多相关《hh汉源二中南侧步行梯道建设项目施工组织设计.doc(245页珍藏版)》请在三一办公上搜索。

1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit

2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,

3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi

4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail

5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the

6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi

7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free

8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i

9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al

10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material

11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev

12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan

13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to

14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen

15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of

17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple

18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize

19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma

20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels

21、cadres in enterprise development in the施工组织设计目录第一章 综合说明第一节 编制说明第二节 编制依据第三节 工程概况第四节 项目管理目标第二章 施工组织机构第一节 组织机构的设置第二节 项目人员配备第三节 部门职责安排第四节 主要岗位职责第五节 组织管理第六节 企业综合管理制度第三章 施工总平面布置第一节 综合布局原则第二节 施工用水、用电第三节 砼及砂浆的搅拌第四节 工地试验室第五节 现场消防系统的布置第六节 生活区的布置第四章 施工方案与技术措施第一节 施工难点、重点与特点分析第二节 施工测量方案第三节 土石方工程施工方案第四节 基础工程施工方案第

22、五节 挡土墙工程施工方案第六节 楼梯建筑工程施工方案第七节 楼梯装饰工程施工方案第八节 楼梯安装工程施工方案第九节 总平电气工程施工方案第十节 总平给排水工程施工方案第十一节 景观工程施工方案第十二节 景亭工程施工方案第十三节 铺装工程施工方案第十四节 总平绿化工程施工方案第十五节 协调配合措施第五章 质量管理体系与措施第一节 质量目标第二节 质量组织机构第三节 质量组织计划第四节 质量保证体系第五节 质量管理制度第六节 工程质量监督体系第七节 施工技术质量保证措施第八节 质量控制措施第六章 安全管理体系与措施第一节 安全管理目标第二节 安全控制体系与制度第三节 消防队伍的配备第四节 施工现场

23、管理基本要求第五节 安全控制措施第六节 文明施工管理体系第七节 文明施工措施第八节 安全应急预案第九节 治安管理计划及突发制安事件紧急预案第七章 环境保护管理体系与措施第一节 环境目标第二节 环境保护体系第三节 环境保护组织机构与职责划分第四节 环境保护管理措施第五节 减少噪音、降低环境污染施工措施第八章 工期进度计划与措施第一节 工期进度计划第二节 工期保证措施第三节 主要岗位工期保证职责第九章 资源配备计划第一节 劳动力安排计划第二节 劳动力管理措施第三节 劳动力保证措施第四节 机械设备的安排计划第五节 机械设备投入计划保证措施第六节 试验检验仪器设备第七节 材料供应计划第八节 材料采购组

24、织安排计划第九节 资金计划第十章 关键工序、复杂环节对应措施第一节 施工重点、难点分析及控制措施第二节 冬季施工措施第三节 雨季施工安排第四节 夜间施工安排第五节 雨期安全文明施工措施第十一章 地下管线及地上地下设施保护措施第十二章 附表、附图附表一:拟投入本标段的主要施工设备表附表二:拟配备本标段的试验和检测仪器设备表附表三:劳动力计划表附表四:计划开、竣工日期和施工进度网络图附表五:施工总平面图附表六:临时用地表recovery and treatment in a timely manner. At the time of construction, should be taken to

25、 prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam

26、 for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site constru

27、ction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollu

28、tion and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second

29、 comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be

30、checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (peo

31、ple, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated lo

32、cation, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site befor

33、e construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public faciliti

34、es have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialof backbone backbone role; to full strengthening members youth work, full play youth emplo

35、yees in company development in the of force role; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We m

36、ust strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of develo

37、pment. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across

38、a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation com

39、pany and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in the new year, good health, happy, happy第一章 综合说明第一节 编制说明1、衷心感谢业主对我公司的信任,给予我公司参加汉源二中南侧步行梯道建设项目施工投标的机会,我们深知工程的特殊性和重要性,将十分珍惜此次难得的机会,借业主方搭设的舞台,一展我公司的实力!2、在接到设计图纸和招标文件后,公司多次组织工程技术人员对图纸进行仔细认真的

40、研究,反复阅看,并召开了方案研讨会,针对本工程的重、难点进行研究方案论证比较,力求编制的施工组织设计科学、合理、详尽,具有很强的可操作性和针对性。3、为了更好地完成施工组织设计的编制,我公司组织了专业人员前往施工现场进行踏勘和了解,并对现场进行了实测实量,获得了宝贵的施工现场的数据、图片等第一手资料,对场地周边环境和各种条件有了很深的了解,诸如道路交通、场地地形地貌,场地围挡情况、施工供水、排水、供电情况,周围环境等,这对施工组织设计的制定和今后现场施工十分有益。4、我公司对该工程重点和难点方面积累了较为丰富的施工经验,形成了一套成熟先进的施工技术和管理经验,特别是对施工管理和协调,与业主、设

41、计、监理和政府部门的配合、协作等。同时我们结合本工程的特点,进行了认真细致的方案设计和招标,制定了专项施工方案和保证措施,为本工程的园满完成奠定了基础。5、我公司为本工程所选派的项目经理部的技术管理人员已经全部拟定,其中项目经理和主要管理人员,承担过多个大型建设项目并具有类似工程施工经验。该项目经理部的管理人员综合素质高,业务能力强,作风过硬,是我公司最为优秀的项目管理班子之一。6、在本工程施工过程中,我公司会积极、主动、高效为业主服务,本着“急业主所急,想业主所想”的指导思想,努力拓展并延伸为业主、设计和监理等有关各方的服务范围和内涵,处理好与业主、监理、设计以及相关政府部门的关系,与业主设

42、计以及监理密切配合,诚心诚意接受业主工程师、监理工程师和设计人员在施工全过程中的指导、监督和热忱帮助,使工程各方形成一个团结、协作,高效和谐的有机整体,共同促进项目综合目标的实现。第二节 编制依据1、汉源二中南侧步行梯道建设项目施工招标文件;2、汉源二中南侧步行梯道建设项目施工设计的施工图纸;3、国家现行有关工程施工和验收的标准、规范、规程、图集;4、与本工程相关的国家、行业和地方现行的其他规范、标准和规程;5、公司ISO9001:2008质量体系标准;6、我公司的技术实力,机械装备情况及各项企业管理制度。7、招标文件及图纸要求的技术规范:工程建设标准强制性条文;工程质量检验评定标准工程测量规

43、范市政基础设施工程施工技术文件管理规定市政工程质量等级评定规定市政工程质量等级评定补充规定园林绿化施工规范绿化工程施工及验收规范国家水准测量规范国家三角测量和精密导线测量规范施工现场临时用电安全技术规范质量管理体系认证标准 等国家有关工程施工规范、条例、办法及施工图设计文件。如有变化的,以现行最新技术规范为准。第三节 工程概况1、工程名称:汉源二中南侧步行梯道建设项目;2、建设单位:汉源县城乡规划建设和住房保障局;3、建设地点:汉源县县城富林镇汉源二中南侧;4、建设规模:建长约为600米步行梯道及相关附属设施; 5、招标范围:施工设计图纸及工程量清单所表达的全部内容;第四节 项目管理目标根据业

44、主招标文件的要求和本工程的特殊重要性,我公司确定了该工程项目管理的综合目标如下:一、质量目标符合国家现行施工验收规范合格标准。二、工期目标我公司在接到本工程招标文件后,结合本工程的特点、重点、难点进行了施工组织设计的详细编制,对进度计划的可行性进行了认真仔细的深入研究,对工程施工组织、管理进行了细致的部署、安排和筹划,对每一道工序的安排做到科学合理、高效紧凑、衔接紧密,在确保施工质量目标的前提下,对工期提出了如下目标:工程计划工期270日历天,计划开工日期:2013年8月/日,以监理工程师发出开工令中规定的日期为准,计划竣工日期:2014年5月/日。三、工程成本造价控制目标我们将始终站在业主的

45、角度,树立工程全局观念,通过优秀的人才、科学的管理、先进的技术和设备、经济合理的施工方案和工艺、科学的策划和部署、有效的组织管理、协调和控制,使该工程成本和造价得到最为有效的控制;同业主、设计院、监理公司的工程相关各方共同努力,优化施工组织和安排,使工程各个环节衔接紧密,高效顺利地向前推进;从图纸设计、材料设备选型、专业承包商的选择和工程招标、现场施工组织、管理、协调与控制等各个方面,提出行之有效的合理化建议和方案,加强“过程”和“环节”控制,追求“过程精品”,避免不必要的拆改、浪费,尽最大能力减少和节省工程成本和造价,使业主的投资发挥最佳的效益和效果。通过长期的工程实践,我们充分认识到只有整

46、个工程成本和造价得到良好的控制,才能对整个工程有利、对业主有利、对各承包商有利。四、安全目标我司将采取切实可行的措施和充足的安全投入,通过严密的安全管理,确保施工现场不发生重大伤亡事故、火灾事故等恶性中毒事件,轻伤发生频率控制在千分之三以内。五、环境保护和文明施工目标我公司将严格按照按市政府规定,做好施工场地及周边清洁卫生,文明施工。在签发交工证书时,应从施工现场清除并运出我方剩余材料、垃圾和各种临时设施等,并保持整个现场及工程整洁,达到监理工程师认为合格的使用状态。费用已包括在投标报价内,包干使用。六、付款条件接受招标文件要求的付款条件。第二章 施工组织机构第一节 组织机构的设置本工程设立项

47、目经理部,项目部为本单位的派出机构,对法人代表负责,并按照项目管理的要求设置职能部门,以便在项目管理中合理配置生产要素、协调内外部门及人员间的关系、发挥各项业务职能的能动作用、确保信息流通、推进施工项目目标的优化实现。第二节 项目人员配备主要人员详见投标书:“六、项目管理机构配备”当辅助劳动力紧缺时将在当地雇用。第三节 部门职责安排一、工程技术部负责技术业务工作,直接领导试验室和量测组。1、在项目技术负责人领导下负责施工组织设计和施工方案的制定,相应制定质量、安全保证措施及作业规程,并负责技术交底。2、制定进度计划、检查、督促计划的完成。3、校审设计图纸和技术文件,按管理分工上报项目技术负责人

48、直至项目经理签发。4、及时了解并研究解决施工现场的技术问题,对重大问题及时向项目经理、项目技术负责人报告。并与别的科室合作,对项目管理活动提供技术上的支持。5、组织技术交流及合理化建议活动,引导技术革新,提高施工技术水平。6、组织撰写施工技术总结和竣工报告。二、质量安全部1、认真贯彻相关质量管理的方针、政策、法规及本单位质量管理规定。2、协助工程技术科在项目技术负责人领导下制定质量保证措施,并对作业规程编制提出质量要求。3、编制质量计划,并负责督促实施。4、检查、督促、指导生产过程中的质量活动,组织质量检查和各项质量培训教育。5、负责对工程所需原材料、半成品、成品按规定逐项进行检查;负责每道工序的质量复检,负责按本项目质量目标及设计意图、规范、标准及合同要求进行质量检查把关。6、负责工地质量事故的调查处理。7、执行质量一票否决权。负责工程安全管理工作。1、认真贯彻相关安全管理的方针、政策、法规及安全管理规定。2、协助工程技术科在项目技术负责人领导下制定安全保证措施,并对作业规程编制提出安全要求。3、检查、督促、指导生产过程中的安全活动,组织安全检查和各项安全培训教育。4