资源描述

《sl桥梁下部结构安全专项方案.doc》由会员分享,可在线阅读,更多相关《sl桥梁下部结构安全专项方案.doc(104页珍藏版)》请在三一办公上搜索。

1、security rope fence. (2) must be equipped with the rope tube protection. (3) position of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt . (2) power co

2、rd into the drop of bend, entry must be entered after the fuse before going into the switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the

3、box to separate single-phase three-hole outlets, top loading protector, using single-phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from

4、 the power, illumination, welding. 3, electricity lines: (1) electric line, required for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber

5、 cable portable power tools, lead length not more than 5 m from the switch box, without joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up,

6、 switch set. 4, grounding and zeroing device: (1) grounding electrode available angles, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wi

7、re, do not use aluminium wire for grounding (neutral) wire joints by welding, crimping a reliable electrical connection. (3) rubber cable core in the black or green/Huang Shuang-color line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line co

8、nstruction, erection of bamboo protection frame. (2) in the vicinity of high voltage cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15m

9、A/0.1s wet job (includes the following equipment: vibration machine, polishing machine, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof s

10、heds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixer lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)problems that canno

11、t be ignored. Some leaders unwilling to do masses work, masses concept weak, on masses feelings not deep, pendulum not are with masses of relationship, think masses work is revolutionary war era of things, now obsolete has, buried business work, ignored masses work of situation compared General; som

12、e leaders not do masses work, old method regardless of with, new not with, not understand masses psychological, not understand masses wishes, not said masses language, work method simple stiff, caused masses of conflict and antipathy; some leaders cant do masses work, Faced with a lot of contradicti

13、ons among the people worry about fear, panic set in encounter group events, and some are even mismanaged, inflame, so work has suffered heavy losses, and so on. These problems we are soberly aware, enhancing the partys ruling capability, the maintenance and development of the partys advanced nature

14、and purity, and to enhance the ability of party committees and leading cadres are good people. Attach great importance to and is good at doing mass work, has become the new urgent situation strengthening the partys governing capacity-building tasks. Combined practice of maintaining flesh-and-blood t

15、ies with the masses, urged the broad masses of party members and cadres, especially all levels . Processing to improve as a guide to the country. What I did is summed up these new things, be promoted. This is a vivid manifestation of the Deng Xiaopings mass. Deng also put people support does not sup

16、port, agreed not to agree, happy happy, promise not to promise as a starting point and destination of developing guidelines, policies, and as the only standard for measuring compliance with the wishes of the masses of the people. Under the guidance of Deng Xiaoping theory, Central Government adopted

17、 a series of important measures to strengthen links with the masses. In December 1989, the CPC Central Committee made on adhering to and perfecting the system of multi-party cooperation and political consultation under the leadership of the Chinese Communist Party, closely for CPC and the democratic

18、 parties and the relationship between the part of the masses that they contact, effectively carrying out the mass line, played a positive role. In March 1990, the 13 plenary session adopted the decision on strengthening contacts with the masses of the Party noted that created and developed in the lo

19、ng struggle of the partys mass line, is to realize the partys ideological line, the fundamental political and organizational work route, can always maintain flesh-and-blood ties and development of the masses, is directly related to the rise and fall of the rise and fall of the party and State. In Se

20、ptember 1994, 14 adopted by the plenary session of the Party on strengthening decision on several major issues of party building. The requirements of the decision of the partys leading bodies and leading cadres should develop a democratic style of work, come from the masses, to the masses, together,

21、 stick to the mass line. Party of 13 session four in the plenary yihou, to Jiang comrade for core of party浙江省三门湾大桥及接线工程第TJ3标段 桥梁下部结构安全施工专项方案XXXXXXXX工程第TJ3合同桥梁下部结构安全施工专项方安编制: 复核: 审核: XXXXX工程局有限公司XXXXXXX合同项目经理部2015年1月security rope fence. (2) must be equipped with the rope tube protection. (3) position

22、 of the switch box must be placed correctly, prohibit reverse switch operation sight must be good, if push button switch, the operator has a power switch, move the button switch must be in the 36-Volt . (2) power cord into the drop of bend, entry must be entered after the fuse before going into the

23、switch inside the oven to complete the grounding and zero connection terminal Board, metal casing should be zero protection. (3) tap inside the box where the air switch, GFCI above to set a separate switch. (4) the box to separate single-phase three-hole outlets, top loading protector, using single-

24、phase equipment must be equipped with a monophase plug of the power supply. (5) where a mobile switch box, housing a reliable protection of zero (ground), equipped with a brake leak. (6) to be clearly separated from the power, illumination, welding. 3, electricity lines: (1) electric line, required

25、for overhead installation of resilient rubber sheathed cable or plastic. Adopted at the lane or road protection pipe buried underground, set up signs, connectors must be overhead or located connector box. (2) rubber cable portable power tools, lead length not more than 5 m from the switch box, witho

26、ut joints. (3) use mobile power tools and lighting are soft rubber cord, do not use plastic resin line instead. (4) temporary wiring installations, use a rubber or plastic insulated wires must be knob cables set up, switch set. 4, grounding and zeroing device: (1) grounding electrode available angle

27、s, steel of not less than two, depth of not less than 2 m and not less than 2.5 metres in distance between two grounding, grounding resistance is less than 4 ohm. (2) ground (neutral) wires using insulated copper wire, do not use aluminium wire for grounding (neutral) wire joints by welding, crimpin

28、g a reliable electrical connection. (3) rubber cable core in the black or green/Huang Shuang-color line as the ground wire. 5, high voltage line protection: (1) in the vicinity of overhead power transmission line construction, erection of bamboo protection frame. (2) in the vicinity of high voltage

29、cable erection Derrick (gantry), scaffolding outside power lines above the water, all safety nets (Booth). 6, handheld or mobile motor: switch box must have leakage protection devices, leakage current 30ma/0.1s, 15mA/0.1s wet job (includes the following equipment: vibration machine, polishing machin

30、e, ramming machines, submersible pumps, electric hand Planer, hand drills, grinders, cutters, pipe threader, moving lights, and so on). 7, mixer, mortar machines: (1) it must be against objects made-and rain-proof sheds. (2) drainage must be smooth, with gutters and sedimentation ponds. (3) the mixe

31、r lever must have a safety device. (4) must have a good ground (zero) device. (5) the gravel yard walls must be sturdy and reliable. (6) complete horizontal mortar mixing Drum booth. 8, hoist: (1)of third generation Central led collective, banner Deng Xiao-pings theory great flag, insisted liberatio

32、n thought, and facts, and times, in both at home and abroad political storm, and economic risk, severe test before, relies on party and people, defended China features Socialist, created socialist market new system, created full open new situation, advance party of construction new of great engineer

33、ing, founded three a representative important thought, Continue to steer the ship of reform and opening up forward on the right. Comrade Jiang Zemin said: strengthening and improving the partys mass work in the new situation, it is of decisive significance to consolidating the ruling Foundation of t

34、he party. Through our party and some of the worlds major lessons learned from the success of the old party of the party, Comrade Jiang Zemin pointed out: the biggest political advantage of our party is in close contact with the masses, the most dangerous after the ruling party was divorced from the

35、masses. He said: our reform and construction, only the understanding, support and participation of the people, peoples enthusiasm and creativity into full play in order to advance; the leadership of the party, only the tie and win the masses embraced, can be consolidated and strengthened. He pointed

36、 out that strengthening and improving the partys work style construction, maintaining the partys flesh-and-blood ties with the masses is the core problem, the key is to do solid work, implement, resolutely oppose and overcome formalism. Comrade Jiang Zemin stressed that all the work and policies of

37、the party, are in compliance with the fundamental interests of the overwhelming majority of the people to the highest degree, to the majority of people are not satisfied with the fundamental guidelines, strive to make our workers, farmers, intellectuals and other people enjoy . Single, everyone seem

38、ed to know. But well known does not mean perfect. Some party members and leading cadres, consider contacting their small departments, within a small circle of people, or contact individual owners, the entrepreneur, is the masses, this idea is obviously not correct. The Communist Party of China, peop

39、le should have three characteristics. First, the people should be the most social, is a Department within the scope of the majority. Specific to the party and Government departments, especially the cadres working in the Central and State organs, mass is the 1.3 billion Chinese people, work for the p

40、arty members and cadres, masses are the land within the jurisdiction of the common people. The second characteristic of the masses, is that we have common interests. Masses are manifestations of each specific people, but the crowd is a comprehensive political concept, refers to people with common po

41、litical and economic interests in the period of social transformation, social differentiation between the interests of the masses is large, if you do not find the interest in doing mass work, the party members and cadres, will be in a passive position. The third characteristic of the masses1中交第一公路工程

42、局有限公司目录1 编制说明11.1 编制依据11.2 编制目的21.3 适用范围22 工程概况22.1 项目简介22.2 水文地质条件42.2.1 水文条件42.2.1.1 水深条件42.2.1.2 潮汐特征42.2.1.3 设计流速42.2.1.4 桥墩冲刷52.2.2 地质条件52.3 施工平面布置132.4 施工准备情况132.4.1 技术准备132.4.2 施工现场准备133 施工工艺143.1 技术标准143.2 工艺流程、施工方法及要求143.2.1 桩基施工工艺流程、施工方法及要求143.2.1.1 陆地回旋钻反循环孔灌注桩143.2.1.2 陆地冲击钻反循环孔灌注桩213.2.

43、1.3 海上回旋钻反循环孔灌注桩283.2.1.4 海上冲击钻反循环孔灌注桩373.2.2 地系梁的施工工艺流程、施工方法及要求463.2.2.1 地系梁的施工工艺流程463.2.2.2 地系梁的施工方法及要求463.2.3 承台的施工工艺流程、施工方法及要求473.2.3.1 墩柱承台的施工工艺流程、施工方法及要求473.2.3.2 桥台承台的施工工艺流程、施工方法及要求513.2.4墩身的施工工艺流程、施工方法及要求543.2.4.1 陆地墩身的施工工艺流程、施工方法及要求543.2.4.2 海上墩身的施工工艺流程、施工方法及要求573.2.5 中系梁施工工艺流程、施工方法及要求613.2

44、.5.1 中系梁施工工艺流程613.2.5.2 中系梁施工方法及要求613.2.6 盖梁的施工工艺流程、施工方法及要求643.2.6.1 盖梁的施工工艺流程643.2.6.2 盖梁的施工工艺流程643.2.7 支座垫石的施工工艺流程、施工方法及要求683.2.7.1 支座垫石的施工工艺流程683.2.7.2 支座垫石的施工方法及要求683.2.8桥台的施工工艺流程、施工方法及要求693.2.8.1 扩大基础重力式U型桥台693.2.8.2 扩大基础肋板式桥台743.2.8.3 扩大基础座板式桥台783.2.8.4 承台基础肋板式桥台824 施工计划854.1 进度计划854.1.1 王岙大桥8

45、54.1.2 XXXX864.1.3 XXXX864.1.4 新桥枢纽匝道桥864.1.5 XXXX874.2 材料与设备计划874.2.1 王岙大桥874.2.2 XXXX884.2.3 新枢纽主线桥894.2.4 新桥枢纽匝道桥904.2.5 XXXX924.3 劳动力计划935 危险因素分析946 施工安全保障措施956.1 技术措施956.2 监测监控措施966.3 管理措施966.3.1 组织机构966.3.2 安全教育976.3.3 安全纪律976.4 安全应急措施977 安全检查和验收997.1 外模安装997.2 液压系统997.3 电气系统997.4 钢筋制作、绑扎1007.

46、5 电器设备1007.6 高空作业1007.7 台风1017.8 水上作业1018 附件102 1 编制说明1.1 编制依据(1)浙江省三门湾大桥及接线工程TJ3标中标通知书(2)三门湾大桥及接线工程招标文件(3)浙江省三门湾大桥及接线工程第SS03合同两阶段施工图设计(4)浙江省三门湾大桥及接线工程第SS03合同施工图设计阶段地质勘察 报告(5)中华人民共和国工程建设标准强制性条文(建标2002202号)(6)公路桥涵施工技术规范(JTG/TF50-2011)(7)公路工程施工安全技术规程(JTJ076-95)(8)公路工程质量检验评定标准第一册(土建工程)(JTG F80/1-2004)(

47、9)公路桥涵设计通用规范(JTG D60-2004)(12)公路桥涵地基与基础设计规范(JTGD63-2007)(13)公路钢筋混凝土及预应力混凝土桥涵设计规范(JTG D62-2004)(15)海港工程混凝土结构防腐蚀技术规范(JTJ275 -2000)(16)钢筋机械连接通用技术规程(JGJ107-2010)(17)滚轧直螺纹钢筋连接接头(JG163-2004)(18)港口工程桩基工程规范(JTJ254-98)(19)公路工程混凝土结构防腐蚀技术规范(JTJ/T B07-012006)(20)公路全球定位系统(GPS)测量规范(JTJ/T066-98)(21)工程测量规范(GB50026-

48、2007)(22)国家和交通运输部现行施工技术规范、规程及标准等(23)浙江省高速公路工程施工施工标准化管理实施细则(24)施工现场实地勘察获得的调查资料(25)我单位的技术实力以及近年来参加类似工程的施工经验。11中交第一公路工程局有限公1.2 编制目的为防止或减少本合同段下部工程施工中的各类事故灾害,保障下部工程施工过程中的人身、财产安全,维护下部工程施工的正常秩序,不出现盲目蛮干的现象,实行安全生产目标管理,确保施工安全达标。专职安全生产管理人员持证上岗率100%;特大事故、重大、较大事故为零;一般事故死亡率、重伤率为零;机械设备检测合格率100%;岗前安全教育合格率100%;安全达标100%。1.3 适用范围