1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .驻马店市安装股份有限公司 碱回收车间施工方案河南内乡仙鹤纸业集团有限公司220T/D碱回收车间安装工程施工方案驻马店市安装股份有限公司二00七

24、年九月二十日 目 录1、前言3 2、工程概况5 3、100T/D碱炉施工方案5 4、蒸发器、冷凝器安装施工方案335、通用设备安装施工方案356、工艺管道安装施工方案417、电气安装施工方案458、仪表安装施工方案549、非标设备制作安装施工方案7110、管道、设备防腐保温施工方案 8111、施工技术措施 8412、施工计划网络图 9112.1、燃烧工段施工计划网络图 9212.2、蒸发工段施工计划网络图.9312.3、苛化工段施工计划网络图 9412.4、碱炉安装质量控制点流程图 9512.5、碱炉安装质量控制环节一览表 9612.5、质量保证体系图 10212.6、安全保证体系图 1061

25、3、机具设备一览表 10714、施工人员组成 10815、施工平面布置及配置 108碱回收车间施工组织设计一、前言蒸发工段是造纸厂治污工程碱回收车间所属三个工段中的首前工段,它的主要任务是把蒸煮后的废稀黑碱液经过本工段的多效蒸发器,并利用较短的时间生产出可送燃烧工段浓度为43-45%的浓黑液,所以燃烧工段能否得到合格的浓黑液关键在于蒸发工段对稀黑液的蒸发质量和浓度指标。碱回收锅炉是现代碱回收装置的最主要设备之一。黑液锅炉的安全问题是至关重要的,碱炉的炉膛是由膜式水冷壁构成的,若任何一点疏忽都会造成水冷壁泄漏和爆管。从而发生熔融物遇水爆炸事故给工厂带来巨大损失,造成人员伤亡,设备严重损坏。其后果

26、远比一般中、高压锅炉水冷壁爆管严重得多。因此,除制造厂在设计和制造上采取一系列的可靠的结构和制造工艺外(一般按高压锅炉的标准),安装工作也是锅炉建设过程中重要的环节,对锅炉的安全、经济和可靠运行极为重要。苛化工段是造纸厂治污工程碱回收车间所属三个工段中的最后一个工段,它的主要任务是把燃烧工段送来的绿液与稀白液混合澄清后,经苛化制成烧碱(即白液),送蒸煮工段使用。为了确保碱回收车间的安装质量和工作顺利进行,我公司认真研究了碱回收车间的设备和工艺要求,根据有关技术资料编写了碱回收车间的安装施工组织设计,供现场施工人员和质量人员参考使用,编写过程中,我们所依据的技术资料和所遵守的法规如下:1招标方技

27、术交底;2.武汉锅炉集团所设计的图纸;3.设计院设计的图纸及说明;4.蒸汽锅炉安全技术监察规程,劳程发1996276号;5.DL/T507495电建规(锅炉机组篇);6.DL500792电建规(火力电厂焊接篇);7.DL503194电建规(管道篇);8.DL5881电建规(电厂化学篇);9.DL/T50961996电建规(钢制承压管道对接接头射线检验篇);10.DL/T504896电建规(管道焊缝接头超声波检验篇);11.GBJ235-82工业管道施工及验收规范;12.GBJ23682现场设备、工业管道焊接工程及验收规范;13.JB/T162093锅炉钢结构技术条件;14.JB161393锅炉

28、受压元件焊接技术条件;15.JB1612XX锅炉水压试验技术条件;16.SDJ6682火力发电厂耐火材料技术条件验收方法;17.SDJ6885火力发电厂热力设备和管道保温材料技术条件与验收方法;18.轻工部首造纸工业碱回收安全技术规范ZB(6702289);19、有关碱回收炉、风压试验,筑炉保温及烘煮炉试运行按武汉锅炉集团碱回收炉产品说明书及现场条件制定方案执行;20、DLCS281电力建设施工与验收技术规范;21、ZBC6702289造纸工业碱回收炉安全技术规范;22、GB5025294工业安装工程质量检验评定统一标准;23、GB5027598压缩机、风机、泵安装工程施工验收规范;24、GB

29、5023198机械设备安装工程施工及验收规范;25、DL/T507951电建规范(锅炉机组篇);26、GB5023598 (工业金属管道工程施工及验收规范);27、GB5023698 (现场设备、工业管道焊接工程施工及验收规范);28、GB5027398 (工业锅炉安装工程施工及验收规范);29、GBJ12890(立式圆筒形钢制焊接油罐施工及验收规范);30、GBJ12689(工业设备及管道绝热工程施工及验收规范);31、QBJ1-64(制浆造纸专业设备安装工程施工及验收技术规范);32、GB5027098 (连续输送设备安装工程施工及验收规范);33、GB5027698 (破碎粉碎设备安装工

30、程施工及验收规范);34、HGJ22991 (工业设备管道防腐蚀工程施工及验收规范);35、GBJ14990(电气装置安装工程母线装置施工及验收规范);36、GBJ14890(电气装置安装工程电力变压器、油浸电控器、互感器施工及验收规范);37、GBJ14790(电气装置安装工程高压电器施工及验收规范);38、GB5016990(电器装置安装工程接地装置施工及验收规范);39、GB5017192(电气装置安装工程盘柜及二次回路接线施工及验收规范);40、GB5017292(电气装置安装工程蓄电池施工及验收规范);41、GB5016892(电气装置安装工程电缆线路施工及验收规范);42、GB50

31、15091(电气装置安装电缆设备交接试验标准);43、SDJ6682(火力发电厂耐火材料技术条件与验收方法);44、SDJ6885(火力发电厂热力设备和管道保温材料技术条件与验收方法);45、武汉锅炉集团编制的SST2-3锅炉炉墙及保温说明书。二、工程概况2.1蒸发工段根据设计要求共配有如下设备:2.1.1各种槽(罐)8台,一般都作为现场非标制作安装,详细的制作安装要求请参看第五章槽(罐)的非标制作及安装。2.1.2蒸发器、冷凝器共8台,该8台设备都是蒸发工段的主要设备,体积大、重量大、安装精度要求较高,特别对该设备的基础,支架以及设备的铅垂度应有一定的要求。因为没有专项的施工及验收规范,故套

32、用(GB5027398)工业锅炉安装工程施工及验收规范中的“基础检查和划线”和钢架安装的允许偏差作为该设备的安装标准来控制安装质量。2.1.3各种泵33台,泵的安装应执行(GB5027598)压缩机、风机、泵安装工程施工及验收规范的相应部分标准(即第五节)。2.1.4其它设备13台,安装要求应达到转动灵活及实用方便即可。2.2燃烧工段主要包括220T/D碱炉1台、圆盘蒸发器1台、入炉黑液槽1台、溶解槽1台、碱灰溶解槽1台、除氧器1台、一次风加热器1台、二次风加热器1台、三次风加热器1台、储油罐2台、冷凝水箱1台、定期排污扩容器1台、连续排污扩容器1台、高位水箱1台、一次风机1台、二次风机1台、

33、三次风机1台、加药装置1套、重油加热器1套、圆盘阀3台、泵类设备18台、分汽缸2台、机封水过滤器2台等设备安装及管道、非标安装。2.3苛化工段安装工程的主要内容有:58台主要设备的安装,以及相关工艺管道的安装和非标制安,还有与之相配套的电气、仪表安装等。主要施工工序包括:设备安装、工艺管道安装、非标制安、电器、仪表安装等。三、220T/D碱炉施工方案第一章 锅炉概况1.1 锅炉主要规范:1.1.1 燃料种类:风干漂白全麦草浆黑液1.1.2 燃料量:黑液固形物理学220T/D1.1.3 黑液固形物热值:12.75103kj/kg固形物1.2 碱回收炉设计参数: 1.2.1 额定蒸汽压力 1.27

34、MPa1.2.2 额定蒸汽出口温度 1941.2.3 额定蒸汽量 26t/h1.2.4 给水温度 1041.2.5 锅炉排烟温度 2601.2.6 热风温度 2801.2.7 炉外加热风温 1001.2.8 入炉黑液温度 1101.3 给水品质要求:1.3.1 给水硬度 1.5微摩尔/升1.3.2 含氧量 7微克/升1.3.3 含铁量 50微克/升1.3.4 含铜量 10微克/升1.3.5 含油量 15000+2 8-10-8-12-12-12B.柱脚底板不垂直度为长或宽的5/1000.C.柱的上托架平面倾斜值不大于3D柱的弯曲度组对后小于或等于10E.柱的扭转值不大于柱长的1/1000且最大不超过10.F.护板框架,顶护板框架:a.对角线偏差:边长小于或等于2.5米时为5;当边长大于2.5米而不大于5米时为8.;当边长大于5米时为10.b.挠度和旁弯:对于护板,顶板及框架;当长度不大于2.5米时为4.长度大于2.5米时为6.;对桁架:当长度不大于6米时为6.长度大于6米而不大于10米时为10.(2)外观检查有无锈蚀,重皮或裂纹等缺陷.(3)外观检查焊接和其它连接的质量.(4)凡经检查不合要求或超差的金属构件必须已经处理.合格后方可进行组对和安装;3.2.2锅炉基础划线和垫铁安装3.2.2.1锅炉基础划线允许误差为: (1)柱子间距:小于或等于10米为1

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号