《rm叶集标准化厂房3 5 6 楼公租房施工组织设计新的.doc》由会员分享,可在线阅读,更多相关《rm叶集标准化厂房3 5 6 楼公租房施工组织设计新的.doc(123页珍藏版)》请在三一办公上搜索。
1、el procs de construcci, fer un procs de convergncia, normes estrictes per garantir ordenada del caos de la producci de construcci. 6, els requisits de vehicle de transport en bones condicions, no agafar la carretera. Sovint per educar els conductors, no conduir errtic. 7, aparells delevaci i laixeca
2、ment dun factor de seguretat suficients, un objecte salci abans inspeccions dels equips delevaci i elevaci, aixecar objectes designats dordre personal. I dins de la gamma de lalerta de seguretat de grua. 8, equips delevaci delevaci ha estrictament verificar abans de cada part de la fiabilitat i segu
3、retat de. Operacions delevaci ha de tenir un programa detallat i clcul i laprovaci dels corresponents departaments entren en efecte en la signatura. Equips per als seients delevaci ha de tenir un certificat de fabricant i instruccions, excs de pes desprs de la installaci s completa passar departamen
4、ts locals supervisi tcnica i certificat dacceptaci es pot utilitzar. Comandants delevaci i de camp ha de ser entrenat, mantenir un certificat. Certificats, certificat, clculs, una descripci ha de ser completa. LHam ha de tenir un dispositiu de seguretat, ser no ser trencat filferro corda desgast, ex
5、cessiva aixecament punt la seva ubicaci ha de ser precs, elevaci equip abans dusar a una prova de crrega. Tecnologia de construcci de construcci per donar el baix fins al personal corresponent. Per designar un comandament unificat, elevaci dinstallaci. Comandants de camp i laixecament cal portar rob
6、a de colors vius i allotjar-alerta, a punt per fer front a situacions demergncia. Per assegurar que la seguretat delevaci, amb evidents senyals dadvertncia prohibint persones inhbils dins. (2) pont a travs del pont dassumpte de seguretat s pont jssera erecci mquina quan el mxim carregar condici. s f
7、onamental per a la seguretat del pont de llums, s una de la biga instal lat el punt de control de seguretat. Primera creu-pista posta: posta a travs de les pistes sobre la biga de caixa, creu pista botiga sota de travesses, travesses en la placa dacer, cal redrear Junta de coix. Adaptaci a equips fr
8、enada s fiable, oportuna reparaci, no ha de tenir la feina. Disposici de manual de mquina de lapse pont de penjar punts, elevaci de la seva ubicaci ha de ser precisa, fora s clar. Pont de creuar per designar un comandament unificat. Creu-preparatius, bigues de pes caixa penjar, estable durant 5 minu
9、ts, llavors comprovar cada part, cap problema, que ja sigui com un ordre lliure pont creu. Mentrestant, va observar el pont al front en lloc, immediatament desprs de la notificaci dirigir persones avall. Avall-estable desprs de 3-5 minuts, la cama davantera per pista, pista de cama davantera estable
10、rt el pont, pont a travs de la completa. Pont abasten ajustaments, avall al voltant de la mquina derecci de biga de pont a desprs dun perode destabilitat desprs del reajustament.overnight, only in socialist society is fully developed and highly developed the basis to realize and need to experience a
11、 long process of historical development. This requires a communist whether when what circumstances, regardless of the difficulties encountered and risk, heart to have ideal beacon, firm communist victory of faith, not because the remote ideal felt nothing ethereal and lose confidence., to the highes
12、t ideals of co-occurrence stage goal together, vowed to building a well-off society and realize the great rejuvenation of the Chinese nation and the Chinese dream, adhering to and developing the Chinese characteristic socialism and solid work of the party in the primary stage of socialism basic line
13、 is what? Master constitution stipulates: the basic line of the Communist Party of China in the primary stage of socialism is: leadership and unite the people of all ethnic groups, taking economic construction as the center, adhere to the four cardinal principles, adhere to the policy of reform and
14、opening to the outside world, self-reliance and pioneering effort to turn our country build a strong, prosperous, democratic, civilized and harmonious modern socialist country struggle. the base The contradiction between still to develop this route can be simply summarized as a center, two basic poi
15、nts. It is our party according to our countrys basic national conditions, reflects the party and the people of all ethnic groups of fundamental interests. Adhere to the basic line for a hundred years does not shake, is the Chinese characteristic socialism victory along the most reliable guarantee. A
16、dhere to the economic construction as the center, is the country, is our country socialist primary stage of the main contradictions and basic tasks. At the present stage, our country societys principal contradiction is the peoples growing material and cultural needs and the backward social productio
17、n. In order to solve the main contradiction, the completion of the basic tasks. It must persist in taking economic construction as the center, various other subordinated to and serve the center, which is the key to solving all problems in Contemporary Chinese. To firmly establish the innovation, coo
18、rdination, green, open, sharing of new development concept, seize the opportunity, accelerate the development, implementation of innovation driven development strategy, talent strategy of giving priority to the development, give full play to the innovation as the role of leading the development of t
19、he first power, deepen the reform, advancing in a pioneering spirit, and promote Chinas development step to a new level. Adhere to the socialist road, uphold the peoples democratic dictatorship, adhere to the partys leadership, adhere to the four basic principles of Marxism Leninism and Mao Zedong t
20、hought, is our foundation of our country . in the whole process of the socialist modernization construction, must adhere to the four cardinal principles. Out of the four cardinal principles, our cause no foundation,Manipulator is now used as a industrial robots in use, the control objectives often a
21、ppear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, mechanical processing, and other indus
22、tries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a high degree of development. Labor rates
23、, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set for mechanical devices. Now turned on the development of the microelectronics automa
24、tic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standards. Because robots are good development of the technology makes a good optimization
25、of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Manipulator in many developed country agr
26、iculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipulator development level is slightly low
27、er than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some leading level of knowledge has has mu
28、st awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after years with with computer and automat
29、ion technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the production line, which is programmed r
30、obotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like welding, painting, delivery as well as for materials simple movements. Second generation
31、 mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand第 123 页 共 123 页第一章 编 制 综 述 -第一节、编制依据 -第二节、编制说明 -第三节、施工进度目标 -第四节、主要采用新技术、新工艺简要说明 -第三章 主要分部工
32、程施工方法和技术措施 -第一节、工程测量 -一、施工测量的准备: -二、轴线定位与平面控制 -三、建筑标高与高程控制(高程控制网的测设) -四、沉降观测 -五、测量质量保证措施 -第二节、土方工程、基坑支护及排水措施 -第三节、钢筋工程 -第四节、模板工程 -第五节、混凝土工程 -第六节、基础施工方案 -一、施工工序 -二、 筏板施工工艺 -三、底板浇筑质量保证措施 -五、 砼施工技术质量: -六、底板垫层施工、模板施工 -七、底板钢筋施工 -八、地下室竖向结构施工 -第七节、砌筑工程 -第八节、楼地面工程 -一、砂浆楼地面 -第九节、装饰工程 -一、一般抹灰 -二、室内外贴面砖 -三、天棚墙
33、面刷涂料 -第十节、屋面工程 -第十一节、防水工程 -第十二节、脚手架工程 -一、外脚手架总体方案 -二、防护棚搭设 -三、外架质量检查及安全要求 -四、外架拆除 -五、内脚手架: -第十三节、给排水工程 -第十四节、电气工程 -第十五节 消防系统调试 -第四章 质量保障体系及技术管理措施 -第一节、工程质量目标 -第三节、各类质量管理控制程序 -第四节、保证质量的管理措施 -第五节、工程技术档案管理措施 -第六节、施工计量管理措施 -第五章、安全生产管理体系及技术管理措施 -第一节、总体要求 -第二节、安全生产管理体系 -1、纵向管理体系 -第三节、施工安全保证措施 -第四节、施工安全技术措
34、施 -一、编制施工组织设计和分项工程施工方案中都要有针对性的安全技术措施。 -三、脚手架安全: -四、安全用电: -五、防大风、防雨、防雷措施: -六、安全标志和安全防护: -七、夜间施工: -第五节、分项工程安全技术措施 -一、防水工程 -二、模板工程 -三、钢筋工程 -四、混凝土工程 -五、装饰工程 -第六节、施工环节保证措施 -一、三级教育制度 -二、安全检查制度 -三、安全奖惩制度 -四、项目经理部有下列情况之一者中,严肃处罚 -第六章、文明施工管理体系及技术管理措施 -第一节、文明施工管理体系 -第二节、编制现场文明施工组织设计 -第三节、分片管理 -第四节、建立健全工地文明卫生管理
35、制度 -第五节、文明施工岗位职责 -第六节、行为规范保证 -第七节、文明施工检查制度保证 -第七章 工程进度计划及措施 -第八章 工程专项保证措施 -第一节、雨季和防大风施工措施 -第二节、夏季、冬季施工措施 -第三节、施工消防保卫措施 -第四节、环境保护措施 -第五节、降低工程成本措施 -第六节、成品、半成品保护措施 -第七节、通讯保障措施 -第九章 主要施工机械设备和材料计划 -第一节、主要施工机械设备及状况说明 -第二节、主要施工材料计划 -第十二章 施工现场总平面布置及管理 -第一节、施工现场平面布置 -第二节、施工现场平面管理 -第十三章 相关协调管理 -第一节、与设计单位的协调配合
36、 -第二节、与监理单位的协调配合 -第三节、与其他专业队伍的配合 -第十四章 工程回访及工程服务措施 -第一节、概述 -第二节、质量目标及质量计划 -第三节、文件控制 -第四节、人力资源(员工培训) -第五节、合同评审 -第六节、采购和专业工程分包的管理 -第七节、施工过程控制 -第八节、检验和试验 -第九节、物资的贮存和搬运 -第十节、成品保护及顾客财产管理 -第十一节、内部质量审核 -第十二节、纠正和预防措施 -第十三节、工程交付和回访保修 -第一章 编 制 综 述第一节、编制依据1、13#、15#、16#、25#、26#、33#、17#、18#楼、地下停车场专业施工图纸。3、国家现行建筑
37、安装工程施工与验收规范及质量检验评定标准。4、六安市有关政策和文件规定。5、IS090012000标准、质量管理手册、程序文件等。6、本公司多年来的施工经验和施工管理能力及技术装备水平。7、根据工程特点、施工现场实际情况、施工环境、施工条件和自然条件分析。8、主要施工规范目录清单: 13#、15#、16#、25#、26#、33#、17#、18#楼、地下停车场工程应满足下列规范要求:混凝土结构工程施工质量验收规范(GB50204-2011)建筑给水排水及采暖工程施工质量验收规范(GB50242-2002)建筑地面工程施工质量验收规范(GB50209-2010)屋面工程施工质量验收规范(GB502
38、07-2012)建筑电气工程施工质量验收规范(GB50303-2011)建筑装饰装修工程质量验收规范 (GB50210-2010)建筑地基基础工程施工质量验收规范(GB50202-2002)地下防水工程质量验收规范(GB50208-2011)钢筋焊接及验收规范 (GBJ18-2012)砌体工程施工质量验收规范(GB50203-2011)施工现场临时用电安全技术规范(JGJ46-2005)建筑施工扣件式钢管脚手架安全技术规范(JBJ130-2011)建筑工程文件归档整理规范(GB/T50328-2001)建筑工程施工质量验收统一标准(GB50300-2001)钢筋机械连接通用技术规程(JBJ10
39、7-2010)地下工程防水技术规范(GB50108-2008)建筑施工安全检查标准(JGJ59-2011)建筑施工高处作业安全技术规范(JGJ80-91)龙门架及井架物料提升机安全技术规范(JGJ88-92)第二节、编制说明在本投标施工组织设计中对施工进度、质量、安全、现场文明、各工序之间的穿插、施工流水段的划分等方面作了详细的探讨。按照IS09001国际质量体系的要求,本施工组织设计编制过程中,本着争创一流的质量、一流的工期,为业主争效益、为企业争信誉的指导思想,对各区、段工程的施工质量、工期、施工部署及各项技术措施、文明施工、主要施工方法及设备、材料的投入,成品保护等诸多方面做了充分考虑,
40、充分展示了我公司雄厚的技术力量和为业主负责的企业精神。第三节、施工进度目标1、施工进度目标:计划开工日期为2014年4月 1 日,计划工期为540天。工程质量确保一次合格,安全无事故,现场文明达到六安市文明工地标准。2、施工范围:完成招标文件要求内的所有建筑工程、水电暖、消防等安装工程项目。第四节、主要采用新技术、新工艺简要说明拟在本工程中应用以下新技术和新工艺:(1) 粗直径钢筋连接技术;(2) 新型模板应用技术;(3) 新型脚手架应用技术;(4) 建筑外墙外保温应用技术;(5) 新型建筑环保防水应用技术;(6) 企业的计算机网络应用和管理技术。第二章 工程概况第一节、总体简介:序号项目内
41、容1工程名称阳光巴黎春天13#、15#、16#、25#、26#、33#、17#、18#楼、地下车库2工程地址安徽省六安市长安北路皖西大道交叉口3建设单位安徽成功置业有限公司4设计单位中国建筑西北设计研究院5施工承包单位上海哥德堡建筑安装工程有限公司6资金来源自 筹7投标范围施工图纸范围内土建、安装工程8投标性质投标、中标9投标工期540日历天10投标质量合 格 第二节、结构设计概况:1、63#住宅楼结构序号项目内 容1结构形式基础形式筏板基础结构形式框剪结构2混凝土强度等级C15垫层C25构造柱、圈梁C35-5.3014.45m处剪力墙、柱 C3014.4556.4m处剪力墙、柱;-5.305
42、6.4m处梁、板3抗震等级工程设防烈度7 度抗震等级三级4钢筋类别HPB235梁、板、柱、墙 HRB335梁、板、柱、墙HRB400梁、板、柱、墙 5型钢、钢板Q235 钢6砌体0.00以下室外采用MU10免烧砖,M7.5水泥砂浆;地下室内及0.00以上采用煤矸石空心砖,M5混合砂浆2、地下车库结构序号项目内 容1结构形式框架结构2混凝土强度等级C15垫层C30 S6底板、基础圈梁3钢筋类别HPB235梁、板、墙、基础 HRB335梁、板、墙、基础HRB400梁、板、墙、基础4砌体采用普通砌块等级为MU10,砂浆等级为M7.5水泥砂浆第三节、建筑设计概况:1、13#、15#、16#、25#、2
43、6#、33#、17#、18#住宅楼为地下一层车库,地上18层。序号项目内 容1建筑特点框剪结构,地下1层,地上18层2建筑面积55389.41高度56400m3耐火等级地下一级、地上二级屋面防水等级二级4装修装饰顶棚普通顶面 1:0.5:3水泥石灰砂浆底,1:1:4水泥石灰砂浆面。卫厨 1:3水泥底,1:2水泥面罩的水泥楼地面50厚1:6焦渣混凝土填充层水泥砂浆找平后铺地板砖;厨房、卫生间50厚焦渣混凝土填充层,防水层上铺15厚水泥砂浆压光,留25厚地板块位置内墙1:1:1水泥胶水腻子两遍,2、8厚1:0.3:3水泥灰膏砂浆抹面,3、12厚1:1.6水泥石灰膏砂浆打底。外墙15厚1:3水泥砂浆
44、底;5-8厚的1:2水泥砂浆面;刷涂料;15厚1:3水泥砂浆底外墙面砖面门窗塑钢窗;中空玻璃;防火门5屋面工程保温层采用50厚挤塑型聚苯乙烯保温隔热板防水层2层3厚SBS改性沥青防水卷材保护层不上人屋面为C20细石混凝土;上人屋面为25厚1:4干性水泥砂浆,上铺810厚地砖6建筑节能1、依据规范:(1)民用建筑热工设计规范、(2)夏热冬冷地区居住建筑节能设计标准、(3)建筑外窗气密性能分级及检测方法、(4)全国民用建筑工程设计技术措施-节能专篇、(5)安徽省居住建筑节能设计标准2、所属气候分区为夏热冬冷地区,建筑体型系数见节能计算书。3、外墙保温层C40厚JA膨胀玻化微珠保温砂浆,商业保温层C
45、45厚JA膨胀玻化微珠保温砂浆。7、建筑使用年限 50年2、 地下车库序号项目内 容1建筑特点框架结构2建筑面积19072总高度3.7m3耐火等级一级防水等级墙身及地面防水一级4装修装饰顶面满刮腻子两道,喷涂内墙防霉耐擦洗乳胶漆二遍。楼地面楼面: 20厚1:3干硬性水泥砂浆结合层地面:50厚C25细石混凝土,表面撒1:1水泥砂子,压实抹光,20厚1:2水泥砂浆压光抹实。内墙水泥砂浆,防水砂浆门窗防火门,防火卷帘门5建筑使用年限50年第四节、水电专业设计概况序号项目设计管线类别1给水室内给水管道由市政管网直接供给立管采用内衬不锈钢镀锌管,室内采用PP-R建筑给水塑料管热熔粘接2排水采用废污合流制
46、,污水排入小区排水管网,经化粪池后排至市政管网。立管采用PVC螺旋消音管,横管采用普通PVC管材,挤压密封圈连接。 3消防本工程采用两总线制火灾报警系统,消防控制室设有直接报警的外线电话,在地下室自行车库、风机房、消防控制室、电井等设置感烟探测器,电梯前室、配电室、弱电间、发电机室设置感烟及感温探测器,在地下室至十八层层消防电梯前设置楼层火灾显示灯现实火灾着火楼层。消防栓内采用总线制报警控制按钮,除总线控制外,仍有NHBV-(42.5)至消防水泵直接启动消防栓泵。同时安装报警器,通过现场模块自动启动喷淋泵,并接受反馈信号。水流指示器,信号阀动作仅在报警控制器上报警、显示位置,同时消防控制室能显示各信号阀门的开启状态。4电源高层住宅电源由小区变配电室直接引来电缆采用电缆桥架敷设至电气竖井,直接进入照明总配电箱然后采用电缆沿电气竖井敷设;商业部分电源由小区变配电房引来一路电源,沿电缆桥架引至一层电气竖井的总配电箱,然后引至各商户配电箱;动力电源从变配电房引来两路独立电源,消防电梯、客梯、排污泵、正压送风机、防火卷帘等重要负荷双电源末端切换。5照明1. 公共照明分为普通工作照明、应急照明以及室外照明。2. 住宅照明灯具均只预留灯座,住户根据各自需要自行确定灯具样式,