《南金平南布河水电站水电条站监理大纲.doc》由会员分享,可在线阅读,更多相关《南金平南布河水电站水电条站监理大纲.doc(129页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .云南金平南布河水电站工程监理大纲云南金平南布河水电站水电站监理大纲1监理项目和合同控制项目1
14、.1 监理项目1.1.1工程概况云南金平南布河水电站装机规模5MW,为引水式水电站,南布河水电站位于茨通坝河右岸支流南布河上,行政区划属云南省金平县,距金平县城90km。茨通坝河为红河水系一级支流藤条江右岸支流,河流流向为西东向,南布河位于河流中段右岸。南布河水水电站为引水式开发,主要任务为发电,并兼顾下游减水河段环境生态用水等要求。水电站于南布河与茨通坝河汇口上游4km处建坝取水,经左岸1.40km长引水暗渠、0.14m长倒虹管和长0.7km的压力钢管引水至茨通坝村附近,在茨通坝河右岸阶地建地面厂房发电。水电站装设二台2.5MW机组,总装机5MW。本工程引用流量3.07m3/s,设计水头19
15、6.13m,水电站年利用小时数4195h。根据水利水电工程等级划分及洪水标准(SL2522000)和防洪标准(GB502011994)的规定,本工程确定为等工程。枢纽建筑物中挡水建筑物、泄洪排沙建筑物、水电站厂房等永久水工建筑物按5级建筑物设计,次要水工建筑物按5级建筑物设计,临时性水工建筑物按五级设计。该水电站枢纽由取水口、引水暗渠、压力前池、主副厂房框架土建工程及倒虹管、压力钢管引水式水电站厂房等建筑物组成。南布河电站行政区划属于云南省金平县,地理位置界于东经1024648、北纬223245之间。南布河发源于哀牢山余脉中越边境西隆山一带,河流流向大体为南北方向,流域地势陡峻,两岸山坡坡度一
16、般在25以上,河谷深切,呈“V”型断面,是典型的山区性河流。南布河为茨通坝河下段右岸支流,茨通坝河为红河水系一级支流藤条江右岸支流,河流流向为西东向。在水系划分上,南布河为红河水系的三级支流。拟建的南布河电站为引水式电站,挡水坝坝址位置靠近南布河下游高程约700m处,集水面积27.5km2,坝址以上河道长度14 km,河道坡度极为陡峻,平均坡降达15.4。厂房位置在南布河下游靠近河口处,高程约480m,发电尾水经小支流河道汇入茨通坝河。经1/2.5万地形图量算,全河河道长度17.47 km,流域面积为27.7km2。流域处于亚热带山岳丛林区,植被茂密,森林覆盖率在50%以上,河谷大多为热带雨林
17、,有原始森林分布于山腰和分水岭脊线一带。良好的植被条件对涵养水源和洪水的坡面汇流起着重要的作用。电站坝址以上流域人烟稀少,主要分布在流域1000m高程以下,下游靠近茨通坝河一带村寨相对多一些,但经济活动不发达,人类活动对河川径流基本无影响。南布河属茨通坝河一级支流,全长约17.47km左右。电站枢纽区位于其下游流域段,河谷两岸山岭海拔高程约在500m1500m之间,在工程枢纽区1.5km河段上,落差150m,坡降100左右,河谷断面基本呈“V”字形,河床段由志留系砂泥岩岩石组成,河床堆积物甚少,谷底几乎为河床全部占据,谷坡与河床无明显分界线。枢纽区工程地质条件地质构造本区大地构造单元属康藏歹字
18、型构造体系中部的东边分支哀牢山脉。是一个巨型反“S”型构造发育成为的具褶皱变形的一个地槽区。按照传统大地构造学观点,本区属于藏滇地槽褶皱系的横断山地槽之东南部,是一个以印支运动为主旋回的地槽型褶皱带,属绿春复背斜带。本区构造的主要特点是:褶皱与断裂均具明显的线状,延长一般在数十公里甚至达数百公里。褶皱与断裂大致呈平行相间排列,主要走向(除东北角外)为北西西至北西,但整体看又有向北西变宽撒开,向东南变窄收敛的趋势。工程场地周围150km范围内分布的区域活动断裂有红河断裂、楚雄建水断裂曲江断裂及曲江断裂、无量山断裂;工程场地周围40km范围内分布近场断断裂主要有哀牢山逆深大断裂、牛孔黄草岭断层、牛
19、巩大冲头断层等。本区新构造运动十分强烈,主要变现为大幅度间歇性上升运动。区域地震活动频繁,工程区内无区域性断裂通过,距区域烈度活动性主干断裂大于55km,距该强地震带大于80km,属于外围地震的影响区。总体来说,工程区属构造较不稳定区。据1:400万中国地震动峰值加速度区划图(GB18306-2001图A1)和中国地震动反应谱特征周期区划图(GB18306-2001图B1),工程场地50年超越概率水平的地震动峰值加速度为0.10g,地震动反应谱特征周期为0.45s,相应的地震基本烈度为度。地形地貌及物理地质现象枢纽区物理地质现象主要表现在岩体风化、岸坡卸荷裂隙、崩塌、滑坡及泥石流等,但因其发育
20、程度低、分布范围有限而未形成突出的工程地质问题。水文地质条件枢纽区水文地质条件简单,地下水含水层可分为基岩裂隙水含水层和松散堆积层中的孔隙潜水含水层,相应的地下水为基岩裂隙潜水和第四系孔隙潜水。水质类型及对混凝土腐蚀性评价如下:坝址河水、地下水对水工混凝土具中等溶出型腐蚀。厂区地下水对水工混凝土无溶出型腐蚀。但一般酸性型腐蚀(弱)、碳酸型腐蚀(弱)、其它无。回水区工程地质条件本级电站初步拟定了2个取水口,一个取水口位于南布河主河道上(取水口1),另一个取水口位于其支流上(取水口2),相距约150m。根据初拟设计方案,两取水口均属低坝引水,坝型为重力式闸坝。组成两坝址库盆的岩石均为燕山期酸性侵入
21、岩体(52),岩性为新安寨灰色中粒黑云二长花岗岩。右岸山体雄厚,其库盆封闭条件较好,但取水口1左岸有厚度36m的崩坡积堆积体。因此,存在一定的库内渗漏问题,但不会很严重。两坝址水廻水区回水较短,岸坡均为林地,正常高水位附近无耕地、民宅,不存在水库淹没及浸没问题。坝址上游有规模不等的崩坡积、坡积、洪积等堆积体分布,是廻水区主要的固体径流物质来源。在地下水、地表水作用下,特别是暴雨洪水季节易被大量带至廻水区。由于电站属低坝引水,河流坡降大,水库回水短,库容较小,大量的固体径流物质易造成电站取水困难,建议设计采取相应的工程措施。取水口2廻水区内两岸为基岩出露,取水口1廻水区的岸坡右岸以岩质边坡为主,
22、左岸有部分覆盖层分布,基岩岩性为新安寨灰色中粒黑云二长花岗岩。覆盖层岸坡组成为第四系全新统崩坡积层,层厚约33m。但左岸自然坡度较缓,边坡相对较为稳定。而岩质边坡自然坡角较陡,由于受岩体风化卸荷影响,在水库蓄水后,在动水压力长期作用及雨水冲刷下,该类边坡将会形成小规模的库岸崩塌现象。坝址工程地质条件取水口1位于南布河主河道内,为低坝引水开发方案,主要水工建筑物有重力式闸坝和沉砂池。引水明渠沿右岸布置,各水工建筑物均基本完成了主体修建工作。(1)闸坝已建闸坝坝高约5m左右,坝体为混凝土浇筑,现闸门未安装,还未进行拦河蓄水。经现场勘察,闸坝未出现变形、裂缝等不良地质现象。坝基岩体总体承载变形及抗滑
23、稳定等各方面指标均较好。但裂隙发育段其渗透性较好,一般属中等透水层,由于库容较小,且河道内常年流水,建议设计依据工程情况确定其防渗处理措施。左坝肩坡度较缓,为崩坡积堆积体,厚36m,成分为块碎石夹粉土,结构疏松,架空现象明显属强透水土层,目前是稳定的,但长期在水流作用下,易受冲刷或淘蚀破坏,对闸坝稳定造成影响,建议对其进行护坡及防渗处理。右坝肩边坡更陡峭,基岩出露,为强风化花岗岩,风化裂隙及卸荷裂隙均较为发育,现场勘察发现其有小型的崩塌现象,散落的岩块堆积在陡坎之下,建议对右坝肩进行护坡处理措施。(2)沉沙池沉沙池位于左坝肩,其进口端为闸坝取水口,出口端紧接引水明渠。沉沙池底板及左右边墙均为条
24、石衬砌,条石为花岗岩条石,条石间采用水泥砂浆勾缝,目前未发现底板沉降、边墙变形及裂缝等不良地质现象。根据相关施工资料,其底板基础放置在强风化花岗岩岩体上,承载力较高,变形较小。但其左边墙为崩坡积堆积体,在长期土压力的作用下,易导致边墙出现变形。建议对左边墙加强观测,以便及时采取合理的处理措施。(3)取水口2工程地质条件取水口2位于南布河右岸一小支流上,距取水口1平面距离约150m,初拟坝型为重力式低格栏栅坝,坝高约3m。河谷呈较为对称的“V型谷,谷底宽4m左右,河谷内表层为第四系冲洪积含漂卵砾石夹砂土,厚度小于1m,两岸基岩出露,为燕山期酸性花岗岩,强风化层厚25m。含漂卵砾石夹砂土结构松散,
25、承载力较低,变形大,属于土层强透水,若将坝基置于该层之上,极易造成管涌破坏和沉降变形,且该层厚度不大(一般只有几十厘米),因此,建议以花岗岩作为该坝基础持力层,坝基嵌入该层不低于1m。其强风化岩体厚度25m,裂隙较为发育,渗透性强,多属中等透水层,建议依据工程实际情况采取防渗处理。该支流上游径流固体物质来源丰富,在洪水期间易形成小规模的泥石流,对坝体有一定冲击作用,建议设计采取合理的抗冲措施。两岸边坡为岩质边坡,坡度在3060之间,局部形成陡坎,强风化厚度25m,强卸荷厚度一般510m,边坡较陡位置一般卸荷裂隙较为发育,因此,建议对边坡进行适当的削坡或护坡处理。两坝肩强风化岩体裂隙发育,渗透性
26、较强,属中等透水层,建议依据工程实际情况采取防渗处理。引水线路地质条件引水线路由隧洞、明渠、倒虹管、前池及压力管道组成。(1) 隧洞引水隧洞为新建隧洞,布置于取水口2与取水口1之间,全长149m。隧洞埋藏深度不大,533m不等,山体侧向厚度075m。地层岩性为燕山期酸性侵入岩体(52),沿线及其附近无断层及次一级褶皱通过,构造较为简单,岩石强度较大,但受风化卸荷影响,隧洞围岩类别普遍不高,以类为主,进出口段为类,具备小断面引水隧洞条件,其地质条件不算良好,但通过施工处理措施可以成洞。(2) 渠道渠道为已建渠道,由2段组成,前段为1#渠道,后段为2#渠道,中间由倒虹管分开,1#渠道长739m,2
27、#渠道长697m。渠道沿线地貌上属低山一中丘地貌类型,出露地层均为印支期次火山相侵入岩和燕山期酸性侵入岩以及下志留统地层S1,渠线附近无断层穿过,构造简单,属于相对稳定场地。不良地质作用少量发育,主要表现为风化及一些小型崩塌、滑坡。渠线一般沿斜坡布置,基岩出露或浅埋。(3) 倒虹管倒虹管建镇墩及支墩均已建好,其基础主要放置在强风化砂、板岩岩体上,总体上,其承载和变形能够满足要求。出口端镇墩放置在崩坡积块碎石层内,该层结构疏松稍密,变形大,承载力低,易造成镇墩的沉降变形破坏,建议对其进行固结处理。进口端镇墩基础放置在强风化岩体上,砌体较为单薄,其山外侧地形坡度较大,易造成砌体的抗滑稳定问题,建议
28、对砌体及其基础持力层进行加固处理措施。(4) 前池前池后坡地形坡度较大,约57,为岩质边坡,岩性为下志留统地层(S1)板岩夹变质砂岩,强风化层厚15m左右。受风化影响,边坡岩体较为破碎,强度低,易形成崩塌,对前池有一定影响,建议对后坡进行护坡处理措施。前坡坡度稍缓,约35,但前池前坡段地表为开挖前池时堆积的人工素填土,其结构松散,渗透性强,在雨水作用下,易形成土层滑坡,对前池及其下压力管道的安全运行有一定影响,建议对该堆积体进行处理。(5)压力管道压力管道为明挖形式,现其各支墩、镇墩基本已修建完成。前段沿山体斜坡布置,地形坡度1525,其镇墩及支墩基础主要放置在强风化砂、板岩岩体上,总体上,其
29、承载和变形能够满足要求。现场勘察各镇墩、支墩未出现变形、裂缝及不均匀沉降等不良地质现象,沿线也未出现崩塌、滑坡等不良地质现象。但其进口段为前池开挖时所堆积的人工素填土,其结构松散,渗透性强,在雨水作用下,易形成土层滑坡,对压力管道有一定影响。压力管道后段为茨通坝河级阶地,阶面平整。其表层为分布为粉质粘土及砾石土,厚度46m,粉质粘土一般可塑硬塑,稍湿,多属土层中等透水弱透水,承载力低,变形大为其主要特征。砾石土一般结构疏松稍密,中等透水强透水,承载力较低,变形较大。下层为含漂砂卵砾石土,漂石含量1520%,卵石含量约40%,结构稍密中密,透水性强,承载力较大,但局部有少量架空现象。根据勘察工作
30、揭露,压力管道的镇墩基础放置在含漂砂卵砾石土内,支墩基础放置在砾石土内,现均未出现变形、裂缝及不均匀沉降等不良地质现象,继续使用这些墩子安装压管是可行的。厂区工程地质条件厂房土体工程已经完建,为混凝土框架结构。厂区及其附近未见滑坡、崩塌、泥石流等不良地质现象,地质情况较为良好。现场勘察,已建厂房结构情况较为良好,未见变形、裂缝及不均匀沉降等现象发生,因此,未发现影响厂房结构安全的地质不利因素存在。钻探揭露,厂房基础埋置深度2m3.2m,为砂砾石土层中,该层结构稍密中密,以卵石含量占多数,其下为含漂卵砾石土,靠河侧有少量透镜状粉土分布,其埋深在10m以下,对厂房地基稳定有一定影响但影响较小。厂区
31、地下水位基本与河水齐平,埋深45m,对基坑开挖影响较小,但汛期施工水位抬升,将会对施工带来一定影响。因此,若在雨季施工,应注意加强施工排水和基坑护壁等工程措施。厂房后坡为茨通坝河级阶地前缘,该前缘坡高25m,局部有少量边坡失稳现象,但垮塌方量很小,对厂房影响不大,为防止该前缘斜坡长期受雨水冲刷或淘蚀受到破坏,建议对该边坡进行相应护坡处理。天然建筑材料工程需要的天然建筑材料种类为土料、砂砾石料、块石料,该电站装机容量小,且多数建筑物主体已完建,所需天然建筑材料数量不多。砂料建议采用达洛河规划的隔界西砂料场,骨料可用隧洞开挖出的新鲜基岩、河道内的花岗岩孤石均可作为混凝土人工骨料建筑物,但在具体使用
32、时,应做作为人工骨料的现场点荷载试验,满足要求后方可使用。工程为小型混凝土重力坝坝,所需石料不是很多,坝址附近有大面积裸露的二长花岗岩(区内二长花岗岩,应用类比法,其新鲜岩块饱和抗压强度达80Mpa以上,为坚硬岩,其质量可完全满足工程要求)。储量甚丰,岩性单一、稳定,可就地取材即可,还可充分利用施工开挖的废料、弃料及河道内的孤石。工程区残坡积堆积土层较厚,土料场可根据施工工程的场地位置、用量、要求质量、开采运输条件,就地选择土料场。其质量和储量能够满足要求。若需占地问题不好解决,也可采用土工膜防渗,购买使用。1.1.2 监理工作依据一、 适用的国家法律、行政法规和部门规章以及地方法规、规章:
33、(1)、中华人民共和国招标投标法; (2)、中华人民共和国合同法; (3)、水利工程建设监理规定(水建管1999637号文); (4)、水利工程建设监理单位管理办法(水建管1999637号文);(5)、水利工程建设监理人员管理办法(水建管1999637号文); (6)、水利工程建设监理合同示范文本(GF-2000-0211); (7)、水利工程建设项目监理招标管理办法(水建管2002587号文); (8)、水利工程建设项目招标投标管理规定(中华人民共和国水利部第14号令)、水利水电工程施工监理规范(DL/T5111-2000)二、本合同的监理依据(1)、国家有关水利水电工程管理法规和设计、施工
34、及验收规程、规范、标准;(2)、本合同项目的设计文件、水文地质报告、初设概算报告、预算及施工图;(3)、本合同项目的招标文件、投标文件、设计合同、施工合同、监理合同。1.1.3监理工作的范围1、监理服务范围:云南金平南布河水电站工程所有建构筑工程、各系统设备安装、调试工程、厂外单项工程(主要包括但不仅限于:施工用水、施工用电、供水工程、等)及(全部机组通过72小时、性能验收合格,竣工验收合格后12个月内所应承担的全部监理内容。监理服务包括:上述工程范围内的施工准备、设备材料采购(现场的管理)、施工、调试、竣工验收及启动试运、可靠性试验、性能试验、资料归档管理、工程移交、达标投产、优质工程检查评
35、定、质量保修、工程监理总结、竣工资料整理等全方位、全过程的监理服务内容。 2、监理服务阶段:包括上述项目从施工准备、四通一平、地基处理、土建、安装、调试、机组移交试生产、保修期全过程监理。3、监理服务方面:包括上述项目、阶段的“四控制”(质量、投资、进度、安全控制),“两管理”(合同管理、信息管理),“一协调”(承包商与现场其它各单位的关系)工作。1.2合同控制项目建设监理工作的目标主要是对云南金平南布河水电站水电站工程进行施工总目标控制,切实实现本工程项目的投资目标、进度目标和质量目标,通过项目的风险分析管理、项目目标规划和项目目标的动态控制,使云南金平南布河水电站工程项目的实际投资不超过概
36、算投资,实际建设周期控制在8个月,工程质量全部合格并争创优良工程等级。1.2.1 监理合同控制目标 依据国家有关工程建设现行的及不时颁布的法律、法规、行业规范和行业标准,以及业主颁布的云南金平南布河水电站水电站工程各相关管理制度、办法及细则,对云南金平南布河水电站水电站工程建设的质量、进度、安全、造价、环境保护、水土保持(与工程项目相关的措施)进行有效控制和管理,协助业主使本工程建设按合同目标顺利进行,实现工程建设的质量、进度、安全、造价、文明施工、环境保护与水土保持控制目标。1.2.2 质量目标 对施工过程、施工工序进行严格控制,使工程施工质量始终处于受控状态,对关键工序和关键工程项目的施工
37、进行旁站监理,促使工程承包合同的全面履行,使本工程的所有单元工程合格率达100,各分部、分项工程,单位工程施工质量均达到优良,无质量事故。1.2.3 进度目标 以达到施工承包合同的总工期要求为控制性工期要求。严控关键线路上施工项目的进度,在确保工程质量及投资目标的前提下,科学分析外部环境对各工序施工的实际影响,合理指导施工计划安排和施工方案的实施,以尽可能地优化施工程序,最有效地利用施工有效时间,来达到合同控制性工期的实现。 进度控制目标为业主制定的本工程工期。根据业主对工期的要求,分解主要工程项目工期目标,然后,制定相应的进度控制措施,确保进度目标的实现。 进度目标实现2011年8月底工程全
38、面竣工,并通过验收。1.2.4 安全目标 认真贯彻国家有关工程建设安全管理的文件精神,充分行使监理的责权,强化承包人的安全意识,督促承包人将安全生产落实到实处,确保本工程无重大安全事故。使因工重伤率不超过0.3,死亡率不超过0.2。1.2.5造价目标以工程计量、工程变更及工程索赔等审核额与实际结算支付额吻合率达 90 及以上。1.2.6环境保护目标根据国家有关部门审查批复的云南金平南布河水电站水电站工程环境保护设计等相关环境保护文件要求,本工程施工期的环境保护目标如下:(l)维护工程施工区现有水域功能,工程运行满足地表水环境质量标准(GHZBl-l999)类水域标准及渔业水质标准(GBll60
39、789);施工期废水排放达到污水综合排放标准(GB8978-1996)一级标准,其中施工期废水中悬浮物按电力部“九五”规划的规定,去除率达到80以上。 (2)维护施工区及其周边区域的大气环境质量,使施工人员生活区达到环境空气质量标准(GB3095-1996)二级标准。 (3)维护施工人员生活区及其周边敏感区域的声环境质量,施工期施工区边界噪声满足建筑施工场界噪声限值(GB 252390)。 (4)达到施工承包合同有关要求。1.2.7 水土保持目标 (1)达到施工承包合同有关要求。(2)根据审查批复的云南金平南布河水电站工程环境保护设计,力争使项目建设区其影响地区的新增水土流失得到有效控制,总体
40、水土保持效果达到并超过项目建设前水平。2 对工程项目的理解与响应2.1对工程项目的理解该工程为小(2)型水电工程,我院已承担过类似工程的设计和监理工作,并取得了相当丰富的设计、监理经验。我院有能力承担该工程施工监理工作,我们将根据合同要求和工程实际情况,成立工程监理部。全面履行监理合同规定的监理职责。我们将坚持“守法、诚信、公正、科学”的原则,实事求是,认真负责,严格监理,热情服务。依据合同文件及有关规程、规范,对工程建设进行质量、进度、投资及安全控制和合同管理、信息管理,协调施工中产生的争议,实现合同规定的建设目标,工程质量达到合格并争创优良工程。2.2对工程项目的响应2.2.1主要监理服务
41、内容云南金平南布河水电站工程建设监理是施工阶段全过程和全面的监理。监理人的监理工作是指监理工程项目从招标发包、施工准备开始,经施工直至该项目按施工承包合同规定全部完成、缺陷责任期结束的全部建设过程的全面的监理工作,在业主授权范围内,依据国家有关水利水电工程建设的法律、法规、技术规程规范和标准以及金平县南布河水电站工程建设文件,通过对工程质量、进度、造价、施工安全、水土保持和环境保护的有效控制,对工程合同的管理以及组织协调工作,协助业主使工程项目的建设实施按合同目标顺利进行和实现。我单位将依据施工承包合同、监理合同和依法成立的工程建设合同文件、工程设计图纸、技术规程、规范、质量评定与验收规程等有
42、关文件要求,对所监理的工程进行质量、进度、投资、安全控制,管理工程施工承包合同和信息,协调业主和承包人之间的关系。即控制投资不突破工程预算。工程质量达到或超过施工承包合同要求的等级标准。合同管理力求全面、公正、准确地监督合同的履行,维护合同的合法性和严肃性。确保工程建设顺利进行,建设过程实行管理规范化、标准化、程序化;信息管理包括及时准确收集、整理工程建设的有关信息,采用计算机进行信息管理。我院将凭借其丰富的工程建设监理经验,结合工程建设的具体情况,尽可能地减少或避免索赔的发生。同时,在监理工作的各个环节中认真如实作好各种记录,作好反索赔工作,保证工程建设的顺利进行,公正维护业主和承包人的合法
43、权益。2.2.2监理人应向委托人提供的信息文件2.2.2.1设计方面(1)协助业主与勘察设计单位(以下简称“设计单位”)签订勘察设计、科学试验合同及施工图供应协议;(2)管理业主与设计单位签订的有关合同、协议,督促设计单位按合同和协议要求及时供应合格的设计文件;(3)熟悉设计文件内容,检查设计文件(包括:设计说明、施工范围、技术要求、操作规程、设计修改通知等)是否符合批准的设计任务和初设审批意见,以及是否符合勘察设计合同规定;(4)代表业主核查设计文件和各项设计变更,提出意见与优化建议;(5)及时向本工程承建单位签发设计文件,发现问题及时与设计单位联系,重大问题向业主报告;(6)组织设计单位进
44、行现场设计交底;(7)协助业主会同设计单位对重大技术问题和优化设计进行专题讨论;(8)审核承建单位对设计文件的意见和建议,会同设计单位进行研究并督促设计单位尽快给予答复;(9)代表业主审核按工程承建合同文件规定应由承建单位提交的设计文件;(10)保管所有设计文件及过程资料;(11)其他相关业务。2.2.2.2采购方面(若需要)(1)协助业主进行采购招标与发包工作; (2)管理采购合同,并对采购计划进度进行监督与控制;(3)及时提请业主按期供应主要永久工程设备;(4)协助或代表业主对进场永久工程设备、钢筋、水泥、粉煤灰等主要建筑材料进行质量检查与到货验收; (5)审定承建单位提交的三材及其他材料
45、的采购计划;(6)其他相关业务。2.2.2.3施工方面协助业主进行工程招标发包和签订工程承建合同; (2)全面管理工程承建合同,就承建单位选择的施工单位资格及项目进行审查,并报请业主批准;(3)检查并督促业主按本工程合同的规定,落实必须提供的施工条件,检查工程承建单位的开工准备工作,并在检查与审查合格后签发合同工程开工令。(4)审批承建单位提交的施工组织设计、施工技术措施计划、作业规程、工艺试验成果、临建工程设计以及使用的原材料等;(5)签发补充的设计文件、技术规范等,答复工程承建单位提出的建议和意见;(6)工程进度控制:编制工程控制性进度计划,提出工程控制性进度目标给业主审批同意后执行。并按
46、此审查批准承建单位提出的进度计划,下达季、月及年度进度计划,并检查其落实情况,督促承建单位采取切实措施实现合同目标要求。当由于各种原因已致使实施进度发生较大偏差时,及时向业主提出调整控制性进度计划的建议意见,并在通过业主批准后完成其调整;(7)施工质量控制:审查承建单位的质量控制体系和措施,核实质量文件。依据工程承建合同、设计文件、技术规范与质量检验标准,对施工前准备工作进行检查,对施工工序与资源投入进行监督,以单元工程为基础对基础工程、隐蔽工程、分部工程的质量进行检查、签证和施工质量评价;对主要施工过程实行旁站监理。(8)工程造价控制:协助业主编制投资控制目标和分年度投资计划。审查承建单位提
47、交的资金流动计划,审核承建单位的节点工程结算等。受理索赔申请,进行索赔调查与谈判,并提出处理意见。依据业主授权处理合同与工程变更,下达变更指令;(9)工程计量控制:配置满足工程需要的测量、监测、检验、试验人员与仪器设备,负责工程施工的测量、监测、检验和试验工作,负责检查、抽查、监督、审核承建单位的工程施工的测量、监测、检验和试验工作。(10)施工安全与保护监督:检查施工安全措施、劳动防护和环境保护设施,督促检查汛期防洪渡汛措施等。参加重大安全事故调查并提出调查报告及处理意见;(11)主持并进行监理合同授权范围内工程建设各方协调工作,编发施工协调会议纪要;(12)协助业主按国家规定进行工程各阶段
48、验收,按国家二级档案标准,审查设计单位和工程承建单位编制的竣工图纸和资料,按规定向业主移交。(13)信息管理:做好现场监理记录与信息反馈。按监理合同协议附件要求编制监理月、年报。对工程资料及档案按期进行整编与管理,并在工程竣工验收或监理服务期结束后移交业主;(14)其他相关工作。 2.2.2.4咨询方面(1) 配合委托人聘请的咨询专家工作并提供有关资料与文件;(2) 对监理合同项目有关的咨询专家建议、意见进行分析研究,并作出相应的书面意见。2.2.3监理人向业主提供的信息2.2.3.1定期信息文件根据承担的监理工程项目、范围及内容,随工程施工进展向业主报送下列月报和年报,其主要内容为:(1)施工质量情况;(2)工程进度情况;(3)进场施工机械设备及劳动力动态;(4)合同变更与工程变更情况;(5)工程支付情况;(6)施工进展情况。(7)其他(如工程建设大事记)。2.2.3.