资源描述

《儋州市儋耳路二期监理规划及细则副本时1111.doc》由会员分享,可在线阅读,更多相关《儋州市儋耳路二期监理规划及细则副本时1111.doc(105页珍藏版)》请在三一办公上搜索。

1、With the Shaanxi Expressway networking toll, toll extension business is now weighing charges for storage charges database security and backup of business data has become more prominent. After two years of operation, more and more awareness of the operating units to database stability issues is a pro

2、blem not to be ignored. Simple examples such as: failure of the servers and databases, general maintenance and management staff, in many cases, cannot be independent and quick recovery, had an impact on production. So we need a proper data backup solutions. Database is the core of the whole system,

3、database security should pay more attention. Therefore, the formulation of appropriate database backup strategy, is to maintain database security norms as well as the guidelines, to backup the data it needs from the technical, as well as administratively regulated. In data security, data security st

4、rategy is to maintain the integrity, confidentiality and availability of information. Therefore, database security policy will focus on these three points, including physical security, access control, data backup and emergency response. Here, in the toll collection system in the province uses the SQ

5、L Server database as an example to illustrate the idea of developing its security policy. 1 research background of construction of networked Expressway toll collection system reduced the number of drivers vehicles in the road network and improve road capacity, reducing environmental pollution due to

6、 parking, enhance the economic benefits of Highway and social image. Shaanxi Provincial Expressway networking toll began in May 2004, as of now there are more than 200 data server, as more sections of grid-connected charges, charges data as the core of the whole system, it is necessary to establish

7、a set of data security and reliable solution. 2 purpose this time through the analysis of network data in server health, Shaanxi Provincial Expressway networking toll system based on data, statistical methods of data storage, data research, original charge as possible security, integrity and privacy

8、 of data. For the opening section after incorporation fees provide a reliable set of data security policies. 3 database security situation in the province Shaanxi Provincial Expressway networking toll system overview 3.1 database-tier systems, management systems, branch-level management system, the

9、provincial network centre split and transfer system, four-level system. Each system has its own separate data server is used to store their collection of premium business data, provide the basis for statistical analysis. 1, stand-level server storage fees collected from toll lanes flowing data and p

10、ass on this site blessing Kaku, cartridge information within this site, card box allocation, cartridge combination of information and frequency information. 2, the main storage server server charges collected water from under the jurisdiction of the station data and the pass of blessing Kaku, the in

11、ternal cartridge information, reallocation of the cartridge and cartridge combination, personnel information, flight information, charges the actual payment data entry work. 3, Center-class server storage server charges collected water from under the jurisdiction of the station dataWater data integr

12、ity can be up and running. So when a database server fails, you do not need to pass data to recover, simply through the collection procedure for charging water data collection to complete the fast recovery of server failures. 4.4 analysis summary summary analysis, lane because it is not a complete s

13、tation level data, so there is no need for dedicated backup. Stand-level server data because it is at the front of the charge as a whole, its fault directly affects the exercise normally, you need a complete offsite backup solution. Management, and data center server, due to its operations without m

14、anual data entry, so just use common artificial scheduled backups can be. 5 solutions in order to ensure that when the server after a hardware failover, backup data without changes or only minor changes can be quick and easy troubleshooting of server data recovery, you儋州市儋耳路二期及配套工程施工监理规划及细则甘肃西北信诚工程建

15、设监理公司二零一三年十一月need to select the real-time synchronization method of the programme. Typically backup system comes with backup solutions should be preferred. If the system comes with a backup plan if it cannot meet the requirements, software development methods is needed. Or third-party software syste

16、ms are selected for backup. Because third-party backup software is usually priced very high, charging units require high price, so for only the first two methods are studied below. 5.1 use MS SQL2000 synchronized backups of SQL 2000 database in three ways, namely snapshot replication, transactional

17、replication and merge replication. By comparison, excluding the first two programmes, select synchronization transactional replication and database Nothwind database, for example, for testing. The three parts of the main considerations in the synchronization of the data, can be thought of as three h

18、osts. The Publisher, Distributor, and Subscriber; can be understood from the literal meaning, function is actually implemented to keep subscribers through the Distributor data timely and consistent data at the Publisher. 1, about snapshot replication to copy data changes infrequently, or are not req

19、uired to keep the data current values (low latency), snapshot data is one of the best methods of data replication. When synchronization occurs, complete snapshot is generated and sent to the Subscriber. Because snapshot replication bulk copies released (items collection) a complete copy, it will pub

20、lish all writes made to the snapshot folder. Project is to specify that you want to copy tables, data partitioning, or database objects. Projects can be a full table and certain columns (using a vertical filter), certain rows (using a horizontal filter), a stored procedure or view definition, the st

21、ored procedure execution, view, indexed, view, or user-defined function. Snapshot replication does not maintain data the fastest real-time updates, and the bulk copy released (items collection) a full copy of the mechanism will generate a lot of network traffic. Only small volumes of replication use

22、d, data is static and does not need to be updated in real time database. So do not use snapshot replication the synchronization modeData table, add a new data field MSrepl_tran_version, publishing software depending on whether the contents of this field changes to determine whether you need to publi

23、sh the data. And SQL 2000 data is modified judging is managed by the kernel, not for external programming. Such as modify the structure of the original data table, a direct result of running lanes and management software that doesnt work. Due to the above test results to prove that this scenario is

24、not suitable as a backup method for networking toll system in Shaanxi Province. 5.2 using specially developed backup software after the above tests, through the systems subscriptions, publish method in Shanxi province under the networking software sync backup, demand cannot be met, backup software s

25、o I decided to use for the development of synchronization, synchronize backups. As a result of independent development, it has a high degree of flexibility in backup. Easier for seamless integration with existing systems. Backup software developed for the synchronization, you must meet the following

26、 requirements: in order to ensure synchronous backup software can start on Windows startup, and are not easily shut down by the operation, it should be developed using a Windows service. Synchronize backup software is the software that runs 24 hours, must be able to steady operation. In order to red

27、uce network bandwidth to the greatest degree in the backup, and only need to back up the tolling system generates the new data table. The backup software should be able to automatically filter the add new data in a database table, and synchronized backups of data that meets the conditions of form. F

28、lags field of the current charging system using a dedicated TransferMark, any kind of toll system software after changing the record, both on the field is zero, this record has been changed to notify other software. Use this field as a flag to identify whether data has changed. In addition to this f

29、ield,儋州市儋耳路二期及配套工程 施工监理规划及细则儋州市儋耳路二期及配套工程施工监理规划及细则审定:审核:编制:甘肃西北信诚工程建设监理公司二零一三年十一月西北信诚监理公司目 录1、工程概况12、监理工作目标52.1监理范围:52.2监理目标:53、监理工作依据64、监理组织74.1 监理组织机构74.2人员配置85、监理工作内容95.1 质量控制95.2进度控制165.3投资控制195.4 合同管理215.5 组织协调246.现场监理人员的主要职责276.1 总监理工程师的职责276.2 总监代表职责286.3 专业监理工程师286.4监理员的职责:297.监理工作制度307.1 施工

30、组织设计/方案审查制度307.2 开工报告审批制度317.3 图纸会审、交底制度317.4 分包审批制度327.5 设计变更处理制度347.6 原材料、构配件及设备质量控制制度357.7 隐蔽工程报验制度367.8 工程质量事故报告处理制度367.9 监理协调会制度387.10 签证/索赔处理制度407.11 工程计量支付制度437.12 工程竣工验收制度438监理工作程序459、施工监理用表4610、工程质量监理重点4911、旁站监理方案5012、安全监理方案5413、工程质量监理细则66一、城市道路工程66 (一)、质量监理工作程序66(二)、道路测量放线工程质量监理67(三)、道路路基工

31、程质量监理70(四)道路基层工程质量监理74(五)、道路路面工程质量监理78(六)、道牙、人行道工程质量监理83二、雨水管道工程86(一)、质量监理工作程序86(二)、管道测量放线工程质量监理87(三)、管道沟槽工程质量监理89(四)、管沟基础工程质量监理93(五)、雨水井、支管工程质量监理95西北信诚监理公司文件更改一览表更改号章节号更改通知单号更 改 内 容日 期批准人儋州市儋耳路二期及配套工程施工监理规划及细则1、工程概况1.1 工程名称:儋州市儋耳路二期及配套工程 1.2 建设单位:儋州市城市建设投资有限公司1.3 工程地点:儋州市 1.4 设计单位:长春市市政工程设计研究院1.5 道

32、路等级城市主干路,设计车速50km/h,交通等级按中等交通1.6工程概况:文化北路南起中兴大街,沿线与兴隆路、儋耳路、伏波路、南昌路、兰洋路等相交,终点至那洋公路,道路全长2912.192m,红线宽40m,城市主干路。原旧机动车道及非机动车道路面均有出现病害,人行道年久失修,破损严重,故对其进行整治。道路整治建设内容为道路(路基层及路面)工程、照明工程、交通工程等。1.7工程特点:1、文化北路南起中兴大街,终点至那洋公路,但中兴大道至那洋 公路另有其他路段可通行至那洋公路,本工程可以进行分段封闭式施工,本次拟改造路段机动车道及非机动道根据路面结构可划分为两段。2、第一段中兴大道至伏波路,路段长

33、约1.2km,该段道路机动车道原旧沥青砼路面全部铣刨后,以旧水泥砼路面作为基层,根据旧水泥砼路面的质量,对原有水泥砼路面修补、病害处理后,铣刨1cm,在原水泥砼路面上喷洒热沥青封层油,再满铺聚酯玻纤布,然后进行6cm AC-20C型中粒式沥青混凝土铺设,再喷洒粘层油后进行面层5cmAC-13C型细粒式沥青混凝土摊铺。该段非机动车道原旧水泥砼路面病害处理后,在原水泥砼路面上喷洒热沥青封层油,满铺聚酯玻纤布,然后再进行路面层5cmAC-13C型细粒式沥青混凝土摊铺施工。3、第二段伏波路至那洋路,路段长约1.7km,该段道路机动车道以原水泥稳定层作为基层,先对原旧沥青砼路面病害进行处理及铣刨2cm后

34、,在原沥青砼路面上喷洒粘层油,然后再进行路面层5cmAC-13C型细粒式沥青混凝土摊铺施工。该段非机动车道旧路面处理及现路面施工同机动车道。4、由于沥青混凝土加铺后改变了路面的高程,故必须将原水泥面上的各种井或盖板提升至加铺后的路面设计高程,并且必须保证沥青路面标高与井顶或盖板标高偏差在容许范围内,(5mm),才能达到良好的行车质量和视觉舒适性,对现有雨水口、排水检查井及管线不进行新建改造,只进行提升井口更换井盖及雨水篦子。5、两侧人行道树根系将人行道面拱起,表面高低起伏、坑洼不平,年久失修破损严重、部分段面存在积水,面板色样陈旧,部分路段未铺设人行道情况,本工程对两侧人行道进行改建6cm混凝

35、土预制彩砖+3cm厚M10砂浆卧底+12cm厚4%水泥稳定石屑,对花带石、路缘石、侧边石、侧平石、树池石全部进行改造。6、本工程对现原有两侧绿化进行保护,原有两侧绿化整齐、茂密、遮阴效果较好,施工期应加强水土保持工作,采取绿化、护坡、驳岸等工程措施,防止水土流失,强化道路两侧绿化,形成绿色屏障。7、本工程为儋耳路二期及配套工程路灯工程,设计内容为伏波路、工业北路、科技北路和交通北路,路灯照明系统施工,有箱式变压器两座,箱变容量选定为80KVA;伏波路采用9米单臂路灯,沿道路两侧绿化带对称放置,灯杆间距为30米左右,选用功率为70W+40W LED灯,灯具选用半截光型,中投射配光;工业北路采用1

36、2米双臂路灯,沿道路两侧绿化带对称放置,灯杆垂直间距为35米左右,灯具选用半截止型高压钠灯,蝶形配光,功率为250W+100W;科技北路采用10米双臂路灯,沿道路两侧绿化带交错放置,灯杆垂直间距为25米左右,灯具选用半截止高压钠灯,蝶形配光,功率为250W+150W;交通北路采用12米双臂路灯,沿道路两侧绿化带对称放置,灯杆垂直间距为35米左右,选用功率为180W+70W LED灯,灯具选用半截光型,中投射配光,在主要交叉路口处,增设15米路灯,功率为2180W或3180W LED灯,以弥补路口照明不足;路灯局部间距视道路布置情况作适当调整,灯具外壳保护等级为IP54,防触电保护等级为级;高压

37、钠路灯均设单灯补偿方式;控制方式为手动与自动两种形式,自动控制采用时控仪;照明配电主干线为YJV22-0.6/1KV-516mm平方及YJV22-0.6/1KV-510mm平方电缆,直埋地敷设,埋于绿化带下,埋深度距地不小于0.7米等;采用TN-S接地系统,每盏路灯灯杆重复接地,箱式变电站设环式接地系统,保护接地及防雷接地共用一套接地系统,接地电阻不大于4欧。8、本段道路交通工程主要包括交通标志、标线两个部分内容;交通标志有大型指路标志牌、小型指示牌,警告标志、禁令标志、指示标志底板为玻璃钢材料制作,指路标志底板为铝合金制作;交通标志立柱为钢管,钢柱进行防腐处理,路面标线部分材料为热熔性涂料,

38、预混玻璃微珠,热熔施工时再撒布玻璃珠。1.8建设工期:2013年11月1日至2014年1月1日1.9施工单位:河南高速发展路桥工程有限公司2、监理工作目标2.1监理范围:2.1.1监理工程范围施工图范围内的施工阶段(含包修阶段)监理。2.1.2监理工作范围全面进行工程质量、工程进度、工程投资控制;工程合同管理及现场协调工作。2.2监理目标:2.2.1 监理工程目标: a、质量控制目标:必须达到国家规定的质量评定等级合格标准; b、投资控制目标:总投资必须严格控制在批复的概算范围以内; c、工期控制目标:按合同工期控制;d、安全、文明施工控制目标:不发生安全事故,争创省级文明工地。2.2.2 监

39、理工作目标:甘肃西北信诚监理公司按GB/T19001:2000标准建立了监理服务质量保证体系,详细规定了各部门、人员的职责和权限,覆盖监理服务全过程的工作程序文件和作业指导文件。按照本公司监理服务质量保证体系文件规定,监理责任分解到每个监理工作岗位上。公司各部门和现场各监理人员认真履行各自的职责,并有效合作,保证全面实现监理控制目标。3、监理工作依据3.1 本工程施工合同;3.2本工程委托监理合同;3.3 GB/T19001:2000标准及本公司的质量体系文件;3.4国家和海南省、儋州市有关工程建设方面的法律、法规、政策和规定;3.5设计图纸和其他有关文件(包括经上级主管部门批准的施工组织设计

40、、施工方案以及技术核定单);3.6现行的工程建设规范和质量检验评定标准;3.7本工程应严格按照现行施工监理验收规范进行监理。主要采用的规范有:城市道路路基施工及验收规范(CJJ44-91) 市政道路工程质量检验评定标准(CTJ1-90) 道路交通标志与标线(GB6768-1999)连锁型路面砖路面施工及验收规范(CJJ79-98)沥青路面施工及验收规范(GB50092-96)公路改性沥青路面施工技术规范(JTJ036-98)给水排水管道工程施工及验收规范(GB50268-97) 市政给排水管渠工程质量检验评定标准(CJJ3-90)城市道路照明工程施工及验收规程(CJJ89-2001)电缆敷设运

41、行规程4、监理组织4.1 监理组织机构实施本项目监理的组织机构为项目监理部。项目监理部组成如下图所示:儋州市儋耳路二期及配套工程项目监理机构职能框图信 息档 案承包单位合同管理体制进度控制投资控制安全管理质量控制其他相关单位承 包 方设 计 单 位委托人(业主、顾客)协 调专业监理工程师总监理工程师(项目总负责)委托方(业主、顾客)测 量结 构给排水电 气道 桥西北信诚监理公司 第 7 页儋州市儋耳路二期及配套工程 施工监理规划及细则4.2人员配置序号职 务姓名性别年龄专业技术职称注册资格1总监理工程师陈东男43市政公用工程房建建筑工程高级工程师国家注册监理工程师2专业监理工程师洪振英男58给

42、排水工程师甘肃省监理工程师3监理员杨孟卿男31工程管理助理工程师海南省监理员4见证员许泽宗男24见证助理工程师海南省见证员5安全员薛献岸男28安全助理工程师海南省安全员6西北信诚监理公司 第 8 页5、监理工作内容为了使本工程达到高质量的要求,必须在原材料、半成品的检验上,在施工工艺、施工工序的选用上,在分部分项工程的验收上均需要严格监理,最终使完工的工程符合市政道路工程施工质量验收标准,达到业主预期的质量目标。5.1 质量控制5.1.1 质量控制的程序1. 质量控制程序框图整改本分项分部工程是否全部完成?自检合格整改转入下一分项分部工程施工附有:l 施工组织设计l 施工人员到现场情况l 施工

43、设备到现场情况l 材料到场情况l 材料检验情况l 分包单位(如有)资质材料开工准备承包单位检验批完成后自检承包单位签署报验申请表监理单位检查检验批质量监理单位填报报验申请表承包单位分项分部工程施工承包单位批准开工申请监理单位审查开工条件监理单位提交工程开工报审表承包单位 开工准备承包单位签署报验申请表监理单位本单位工程的各分项分部工程是否均完成申请工程竣工验收承包单位审核竣工验收申请监理单位填写报验申请表承包单位审查分项分部工程质量监理单位整改承包单位补充再准备签署工程竣工验收申请监理单位现场检查是否合格?文件资料是否符合要求?指示整改竣工验收文件资料准备承包单位进行内部竣工预验承包单位组织工程验收建设单位西北信诚监理公司 第 15 页儋州市儋耳路二期及配套工程 施工监理规划及细则2. 质量控制程序在开工前,监理工程师应提出对工程项目进行质量控制的程序及说明,以供所有监理人员、承包人的自检人员和施工人员共同遵循,使质量控制工作程序化。质量控制程序如下:a.开工报告:在各单位工程、分部工程或分项工程开工之前,驻地监理工程师应要求承包人提交工程开工报告并进行审批。工程开工报告应提出实施计划和施工方案;依据技术规范列明本工程的质量控制指标及检验频率和方法;说明材料、设备、劳力及现场管理人员等项的准备情况;提供放样测量、标准试验、施工 图等必要的基础资料。