兴隆湖周边道路路基工程施工方案.doc

上传人:sccc 文档编号:4979625 上传时间:2023-05-27 格式:DOC 页数:58 大小:1.10MB
返回 下载 相关 举报
兴隆湖周边道路路基工程施工方案.doc_第1页
第1页 / 共58页
兴隆湖周边道路路基工程施工方案.doc_第2页
第2页 / 共58页
兴隆湖周边道路路基工程施工方案.doc_第3页
第3页 / 共58页
兴隆湖周边道路路基工程施工方案.doc_第4页
第4页 / 共58页
兴隆湖周边道路路基工程施工方案.doc_第5页
第5页 / 共58页
点击查看更多>>
资源描述

《兴隆湖周边道路路基工程施工方案.doc》由会员分享,可在线阅读,更多相关《兴隆湖周边道路路基工程施工方案.doc(58页珍藏版)》请在三一办公上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .成都天府新区兴隆湖周边道路项目路基工程施工方案 中冶建工批准:审核:编写:中冶建工集团有限公司四川公司成都天府新区项目部一分部2014年8月方

24、案编号:XLHZB-LJZXFA-0014.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy

25、 application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose

26、pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the

27、Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20

28、%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end,

29、 controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures

30、for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tenderin

31、g agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of

32、tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solici

33、tation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of vario

34、us supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need

35、 to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .I目 录1编制依据12工程概况12.1工程简介12.2主要技术标准12.3工程地质及水文气象条件22.4工程特点53施工布置63.1施工生产、生活营地布置63.2施工用电及用水73.3道路保通74施工组织机构及资管配置94.1项目组织机构及现场管理94.2主要职责和工作内容104.3

36、拟投入本工程工作的主要施工机械设备114.4 拟配备本工程主要材料试验、测量、质检仪器及办公设备表124.5人力资源配置135施工程序及进度计划安排145.1施工程序145.2施工进度146路基工程施工方案146.1准备阶段146.2路基土方开挖156.3路基石方开挖176.4一般土石填方路基176.5高填方路基196.6特殊路基处理206.7路基填筑施工226.8路床碾压286.9路基护坡286.10结构物台背回填296.11土石方平衡296.12相关防护措施307施工保证措施307.1确保工程质量的措施307.2确保工程工期的措施318安全文明施工348.1安全生产保证措施348.2文明施

37、工措施348.3施工打围与分流358.4环境保护措施359冬、雨季施工措施389.1冬季施工措施389.2 雨季施工措施4110质量、安全管理措施4310.1质量管理目标4310.2质量管理措施4310.3安全管理措施45成都市天府新区兴隆湖周边道路项目 路基专项施工方案1编制依据 (1)中冶赛迪工程技术股份有限公司提供兴隆湖周边道路项目初步设计图纸海口路、广西路、海南路、兴隆湖十四号路-路基(送审稿)(第一册 道路工程)。 (2)现场考察资料; (3)我公司多年从事类似工程的丰富实践经验、机械设备情况和技术力量。(4)城镇道路工程施工与质量验收规范(CJJ1-2008)(5)无障碍设施施工验

38、收及维护规范(GB50642-2011)(6)公路工程技术标准(JTG B01-2003)(7)公路路基施工技术规范(JTG F10-2006)(8)公路土工试验规程(JTG E40-2007) (9)公路工程质量检验评定标准 第一册 土建工程(JTG F80/1-2004); (10)兴隆湖周边道路项目岩土工程勘察报告四川省蜀通岩土工程公司(2014-7) (11)钢筋焊接及验收规程(JGJ 18-2003); (12)砌体工程施工质量验收规范(GB502032002); (13)公路工程施工技术规范JTGF10-2006; (14)强夯地基处理技术规范CECS279,2010; (15)现

39、行市政、公路工程施工材料机具设备等定额和相关规范、规程及标准; (16)施工现场临时用电安全技术规范(JG46-2005); (17)混凝土结构工程施工质量验收规范(GB50204-2002)。2工程概况2.1工程简介本项目位于成都市天府新区的中心位置,是区域的生态核心,而天府新区创新科技城即以兴隆湖为中心布局建设。本次设计为兴隆湖周边的市政道路,设计区东临成自泸高速、梓洲大道、南临蜀新大街、西临天府大道南延线、北临蜀蓉大道,本次初步设计共计5条市政道路(含两处立交)。我一分部是4条道路含一处立交匝道(平面型式见下图)。本次设计为广西路(K0+000K0+769.203)、海南路(K0+000

40、-K0+725.103)、兴隆湖14号路与天府路立交(东西向K0+145.615-K0+751.318,长度约605.703m,南北向K11+311.180-K11+548.180,长度约237m)和海口路(K0+028.171-K0+238.183,长度约208.183m),4条道路全长约2545.192米。其中除兴隆湖14号道路路基宽度为40米,匝道路基宽度为12.25米,其他3条道路路基宽度为28米,挖填控制宽度:最宽约为 米,最窄约为 米 ,全线共13个平面交叉路口,互通立交一座。道路等级为城市次干道和支线。主要建设内容包括红线内道路工程、涵洞和管网工程。红线总宽度 m,两侧人行道宽度

41、各3.5米,车行道宽度为21米;其中除兴隆湖14号道路人行道宽度:主线为6.25米,匝道为2.0米,主车道宽为15.5米。 本方案仅是4条市政次干路/支线路基工程施工方案。2.2主要技术标准(1)道路等级:城市道路次干路(海南路、兴隆湖十四号路、广西路)、城市道路支路(海口路临湖路)(2)计算行车速度:40km/h;30km/h(支路);(3)路面类型:沥青混凝土路面;(4)标准轴载:BZZ-100;(5)道路设计年限:中等交通(海南路、兴隆湖十四号路、广西路)、轻交通(海口路(临湖路)路面结构设计年限:15年(主干路、次干路)、10年(支路)。(6)路面结构设计年限:15年、10年(沥青路面

42、);(7)抗震设防烈度:7度;(8)道路交通等级:中等交通和轻交通。(9)车道数:根据城市道路工程设计规范(CJJ37-2012),经计算,一条机动车道的基本通行能力和设计通行能力如下表:道路名称道路等级车道数单向通行能力(pcu/h)海南路次干路41358广西路次干路41358兴隆湖十四号路次干路61549海口路(临湖路)支路27342.3工程地质及水文气象条件2.3.1工程地质1、根据收集到的区域地质构造资料,拟建场地处于成都坳陷盆地南部,西距南北走向的龙门山褶皱带约70km,东距北东走向的龙泉山褶皱带约18km。成都坳陷盆地呈北东35度方向展布,受喜山运动的地质内力作用,龙门山和龙泉山褶

43、皱带相对上升,成都坳陷盆地内堆积了厚度不等的第四系冲积地层,与下伏白垩系地层呈不整合接触,形成目前的冲积平原地貌。东洪路(现代新居东风渠段)市政道路工程项目位于成都冲积平原的东南部,该区域地质构造稳定,未发现新构造活动形迹,属相对稳定的地块。本次勘察揭露深度范围内,地层主要由第四系全新统人工填土层(Q4ml)、第四系全新统坡洪积层(Q4dl+pl)、第四系中更新统冰水沉积层(Q3fgl)组成,下伏白垩系中统灌口组(K2g)基岩。各层特征由上向下描述如下:(1)第四系全新统人工填土层(Q4ml)-1素填土(Q4ml):褐色、黄色、紫红色,松散,稍湿;主要为粘性土,表层含少量植物根茎,部分地段含少

44、量卵石,层厚0.502.70m。-2素填土(Q4ml):褐色、黄色,松散,稍湿;主要为粘性土及附近工地开挖出的砂岩、泥岩,属新近回填,层厚0.609.20m。(2)第四系全新统坡洪积层(Q4dl+pl)-1粉质粘土(Q4 dl+pl):褐黄褐红色,可塑硬塑,呈土柱状,切面比较光滑,可手搓成0.52mm的土条,易折断,无摇振反应,有光泽,干强度高,韧性高,网状裂隙较发育,层厚0.607.50m。 (3)第四系上更新统冰水沉积层(Q3fgl)-1含卵石粉质粘土(Q3fgl):紫红色,密实,硬塑,卵石含量10%,卵石成份以岩浆岩为主,少量为变质岩和沉积岩。卵石呈圆形亚圆形,磨圆度较好,粒径25cm,

45、层厚0.907.30m。-2含卵石粉质粘土(Q3fgl):黄色,密实,卵石含量45%,卵石成份以岩浆岩为主,少量为变质岩和沉积岩。卵石呈圆形亚圆形,磨圆度较好,粒径28cm,个别可达1015cm,层厚1.607.20m。(4)白垩系中统灌口组(K2g): 泥岩:棕红紫红色,主要由粘土矿物组成,遇水易软化,薄层巨厚层构造,分布连续,本次勘察揭露情况可知,随着埋藏深度的增加,泥岩由全风化至中风化过渡。场地内基岩顶板埋深起伏大,整个场地内均有分布。在钻探深度范围内,根据其风化程度,将其划分为全风化、强风化、中等风化3个亚层:全风化泥岩-1:紫红色,其矿物成分为粘土质矿物,岩石组织结构基本破坏,岩芯呈

46、土状,冲击可钻进,层厚0.602.60m。强风化泥岩-2:紫红色暗红色,主要矿物成分为粘土矿物,散体碎裂结构,结构面不清晰,风化裂隙发育,岩体破碎,钻孔岩芯呈碎块状,用手易捏碎,干钻可进,层厚0.903.50m。中等风化泥岩-3:紫红色,主要矿物成分为粘土矿物,泥质胶结,巨厚层构造,节理裂隙不发育,结构面较清晰,岩芯多呈长柱状或短柱状,少量碎块状。岩石为极软岩,岩体完整程度为较完整,岩体基本质量等级为V级,本次勘察未揭穿该层。-2强风化砂岩(K2g):黄色灰色,其矿物成分为砂质矿物,风化裂隙发育,块状构造,整体结构,钙质胶结,胶结程度较差。锤击易碎,干钻可钻进,岩芯风化呈短柱状,较破碎。揭露于

47、广州路个别钻孔,层厚1.20-7.50m。-3中等风化砂岩(K2g):黄色灰色,其矿物成分为砂质矿物,风化裂隙较发育,块状构造,整体结构,钙质胶结,胶结程度中等。锤击不易击碎,岩芯钻可钻进。岩芯采取率平均约90%。岩石坚硬程度为软岩,岩体较完整,岩石基本质量等级为级。2、 地勘点布设情况:本次勘察根据市政工程勘察规范(CJJ 56-2012)的规定及中冶赛迪设计院提出的勘察技术要求布设。(1)海口路共布设钻孔12点,勘探点编号HK1HK12。该路段均为填方路基,勘探点沿道路走向间距50m,按中线和边线交错布置。(2)海南路共布设钻孔21点,勘探点编号HN1HN21。勘探点沿道路走向间距50m,按中线和边线交错布置。(3)兴隆湖14号路共布设钻孔20点,勘探点编号14ZK114ZK20。勘探点沿道路走向间距50m,按中线和边线交错布置。(4)广西路共布设钻孔26点,勘探点编号GX11GX26。勘探点沿道路走向间距50m,按中线和边线交错布置。2.3.2水文本项目围绕兴隆湖而建,规划要求,兴隆湖常水位标高为464m。经勘察本路段地表水主要为老旧鱼塘积水及农田排水灌溉渠水。路段地下水主要为赋存于低洼地段白垩系上统夹关组砂质泥岩中的风化裂隙水,其主要补给来源为大气降水。风化裂隙为主要含水层,其水

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号