资源描述

《br波形梁钢护栏的施工方案.doc》由会员分享,可在线阅读,更多相关《br波形梁钢护栏的施工方案.doc(10页珍藏版)》请在三一办公上搜索。

1、Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M t

2、otal area: 13979 square time: 251 days. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in L

3、ianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration,

4、 quality, security and contract requirements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully m

5、eet the expectations of safety and durability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on t

6、he above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous const

7、ruction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safe

8、ty monitoring. Horizontal and vertical transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Pane

9、l agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible fo

10、r on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of exp

11、eriments, materials equipment positioning settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings

12、with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical Univ

13、ersity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days

14、. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong buildi

15、ng construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requir

16、ements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and dur

17、ability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaff

18、olding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt t

19、he following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical

20、 transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division

21、 of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Gua

22、ngrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment position

23、ing settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and ou

24、ter pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .波形梁钢护栏的施工方案一、施工方法、方案为保证工程质量达到优良标准,根据高速公路交通安全设施设计与施工技术规范,结合设计文件及检验标准,我们将派专业技术

25、人员到专业构件厂家对全过程进行质量把关。同时,施工现场技术人员对现场进行仔细勘察,对施工现场进行必要的平整,然后完成测量放样,一切准备就绪后开始波形梁设施的安装,具体方案如下:(一)、施工准备施工开始前,施工技术人员熟悉、理解设计图纸以及相关的施工规范,并与施工人员一起到施工现场与设计图纸一一核对,找出所施工路段桩号、各类构造物及各结构护栏设置地点,同时做好施工设备及材料的进场工作。1、钢护栏立柱放样立柱应根据设计图纸进行放样,并以桥梁、通道、涵洞、立交、平交等为控制点,进行测距定位,可利用调整段调节间距,并利用分配方法处理间距零头数。为准确放样和保证护栏的线形,隔段进行桩号复核和闭合。立柱放

26、样后,应调查每根立柱位置的地表状态,如遇地下通讯管线、泄水等,或涵洞顶部埋置深度不足时,应调整某些立柱的位置,改变立柱固定方式。2、钢护栏立柱安装根据设计图纸进行立柱钻孔,并检查使之与道路线形相协调。如路肩基本情况允许,采用打入法设置立桩,施工时应精确定位,立柱打入土中应至设计深度,当打入过深时,不得只将立柱部拔出加以矫正,而须将其全部拔出,待基础压实后重新打入。立柱打入困难时,可采用钻孔法或开挖法安装立柱。采用钻孔法安装,立柱定位后应与路基相同的材料回填,并分层夯填密实;采用开挖法埋设立柱,回填土应采用良好的材料并分层夯实(每层厚不超过15cm),回填土的压实度不应小于相邻原状土。设置于构造

27、物中的护栏立柱,施工一般在结构物施工时已做好砼基础。采用预留孔基础时,应先清除孔内杂物,吸干孔内积水,将化好的沥青在孔底涂一遍,然后放入立柱,控制好标高。即可在立柱周围注砂。在灌砂时一定要保持立柱的正确位置和垂直度。把砂振实后,即可用沥青封口,防止雨水漏入孔内。沥青路面段的立柱施工时,柱坑从路基到面层下5cm采用与路基相同的材料回填并分层夯实,余下部分采用与路面相同材料回填并夯实。立柱安装就位后,其水平方向和竖直方向形成平顺的线形。渐变段的端部护栏施工时,应按设计规定的坐标严格控制其立柱位置,注意抛物线形。3、波形梁安装波形梁安装时,通过拼接螺栓相互拼接,并由连接螺栓固定于立柱或横梁上。波形梁

28、拼接方向是安装的关键,施工时保证搭接方向应与行车方向一致。拼接如下图:行车方向波形梁拼接方向示意图波形梁在安装过程中应不断进行调整,因此连接螺栓及拼接螺栓不宜过早拧紧,以便在安装过程中利用波形梁的长圆孔及时进行调整,使其形成平顺的线形,避免局部凹凸。安装时波形梁顶面应与道路竖曲线相协调。并检查护栏的线形,当确定线形比较直顺和流畅时,方可最后拧紧螺栓。4、防阻快安装防阻块能防止立柱阻拌车轮,避免护栏局部受力和碰撞时车辆减速,因此,应保证使其准确就位,在安装调整之前,即可安装防阻块,防阻块通过连接螺栓固定于立柱之间,最后把波形梁装上并进行统一调整。5、波形梁钢护栏起、终端头安装路侧护栏开口处应安装

29、端头梁并进行锚固。端头锚固主要包括钢丝绳锚固件及混凝土基础。在端部基础混凝土设计强度达到50%以后,方可拧紧螺栓或固定缆索。(二)、活动式钢护栏安装该标段活动式钢护栏设在中央分隔带开口处,其安装在波形梁钢护栏安装完成后进行。在施工安装前根据设计文件要求,应对活动式钢护栏的安装位置、数量进行核对;按照确定的位置进行安装,安装时应使其垂直于地面,纵向线形适顺,不得有凹凸和扭曲。基座套管是提前预埋的,安装后应测试是否易于拔出及重新插入。三、注意事项施工准备应充分,施工路段桩号位置找准确。放样应精确,误差在规定范围内。立柱施工应严格认真,其垂直度、间距、螺栓孔位置及其它尺寸均应符合要求,不符合要求需立

30、即返工,同时,应严格按规范JTJ074-94规定进行返工。波形梁板、立柱等构件的包装和标志应符合GB6725的规定。购货时护栏不得散装,且应保证在吊装、运输、堆放过程中不致使产品变形、损坏(伤)。运输过程中应固定可靠,防止因颠簸碰撞损坏涂层或使构件变形。购货时注意波形梁高强拼接螺栓连接处的包装和标志应符合GB/T1231的有关规定。护栏施工时操作应谨慎,不得破坏路面下埋设的电缆、管道等设施。第二节 确保工程质量与安全的措施一、质量保证措施为了确保本次工程质量,项目部专门成立了质检部门,下设两个质检小组,建立质量责任制,把握原材料、加工与施工安装每一个环节的质量,保证措施如下:(一)、严格控制原

31、材料的质量1、波形钢护栏波形梁钢护栏采用140钢管立柱,F-1防阻块,4320310854型波形板(标准板)及2320310854型波形板。普通路段路侧护栏立柱打入深度为140;中央分隔带为60;特殊路段护栏立柱与混凝土基础连接。波形梁钢板、立柱、托架及连接螺栓JI、JII所用钢材为普通碳素结构钢(Q235),其技术指标应符合钢结构用扭剪高强螺栓连接件的规定。安装时损伤部分应用高浓度锌作防锈处理。波形梁、立柱等材料,按每批重量不得超过50t进行抽样检验。 (二)、成立质量保证体系,建立质量责任制。质量总负责人施工质量负责材料质量负责实验、检测室运输质量安装质量(三)、严格按技术规范进行操作(1

32、)工程开工前,必须按分部、分项编写完善的施工组织设计和施工要求。施工工艺设计的主要内容包括:工程概况、主要工序、施工方法和操作规程,施工大样图,质量要求及标准,人员、材料和设备使用计划等。(2)加强施工技术管理,以施工组织设计为纲领,以施工工艺设计和施工要点为指导,操作规程和工序交接检查为保证,严格各施工工序的控制与管理。对易产生问题或出现质量通病的部位要加大技术投入和管理力度,严格遵守操作规程及施工工艺流程。(四)、对施工人员进行全面技术交底,吃透设计文件中规定的各项要求。(五)、严把施工质量关,设专门人员检查控制基础放样、施工、安装等全过程的质量。按设计文件及施工规范要求,严格检查,如果不

33、合格,立即返工。(六)、积极接受监理工程师和业主的监督和意见。三、安全保证措施1、项目部成立安全管理领导机构,并建立、健全各级部门的安全生产责任制,责任落实到人。2、施工驻地和施工现场实行全封闭式安全管理,杜绝闲杂人员进入干扰。对材料、设备储存的库房或堆放点、施工人员生活区,专人值班防火防盗。3、施工用电配电箱的电缆应有套管,电线进出不混乱,室外支线应架空,不得随地拖拉或绑在脚手架上。室外照明灯具距地面不得低于6m,室内距地面不应低于24m。施工现场及其周围的高压电线,变压器等应有醒目的安全警示标志,尤其是夜间施工时,更应采取具体措施防止出现电击事故。4、建立定期安全检查制度。有时间、有要求,

34、明确重点部位、危险岗位。安全检查有记录,对查出的隐患及时整改,做到定人、定时间、定措施。5、由项目经理主抓安全生产和安全制度的落实,为把安全工作落到实处,使全体人员有章可循。把安全管理工作由人管变为法治,必须建立健全安全施工责任制、安全教育制、安全检查制、安全例会制、安全奖罚制度。明确规定各项安全工作的内容和标准及各级人员的职责、权力和义务,使安全管理工作具体化、系统化和标准化。具体的安全措施如下: (1)按照施工图设计要求,树立质量第一,安全第一,用户至上的思想。 (2)作好施工现场安全管理: 施工现场保持整洁有序,便于施工操作; 进入施工现场必须戴安全帽,穿反光制服; 严禁无证人员操作工程

35、机械; 严格按施工规范或操作规程,避免发生事故; 施工现场配放可移动的安全标志。 (3)加强安全教育,安全宣传。 (4)建立完善的安全奖惩制度,并严格执行。 (5)施工过程中,接受业主和监理工程师的安全监督。 (6)与其他施工单位搞好团结、协作,避免发生纠纷。第三节 确保工期的方案与措施工期控制是施工企业管理的内容之一,也是反映综合管理能力的一项重要指标,我们在交通设施建设中,要为自己树立一个很好的企业形象,在创造优良工程的同时,要保证按期完成施工任务。一、保证工期的主要措施1、为加快本合同的建设,我们将采取对内指挥施工生产,对外负责合同履行及协调联络的措施,以便能保证工期。2、实施本合同的施

36、工队伍已选定,目前已熟悉施工图纸,开工后即可进行施工。机械设备已随同施工队伍抵达施工工地,确保主体工程按时或提前完成。3、我们已做好了施工准备,认真进行了复核图纸,落实重大施工方案,施工中遇到问题影响进度时,我们将统筹安排和及时调整,确保总体工期。4、以投标的施工组织进度和工期要求为依据,完善施工组织设计,落实施工方案,报监理工程师批准。根据施工情况变化,不断地优化,使工序衔接,劳动力组织,机具设备,工期安排等有利于施工生产。5、建立从经理部到各施工队的调度指挥系统,全面、及时掌握并迅速、准确地处理影响施工进度的各种问题。对工程交叉和施工干扰应加强指挥和协调,对重大关键问题提前研究,制定措施,

37、及时调整工序和调动人、财、机,保证工程的连续性和平衡性。6、强化施工管理,严明劳动纪律,对劳动力实行动态管理,优化组合,使作业专业化、正规化。7、安排好雨季的施工,根据当地气象、水文资料,有预见地调整好各项工作的施工顺序,并做好预防工作,使工程能有序和不间断地运行。8、加强机械设备管理。切实做到加强机械设备的检修和维修工作,配足维修人员,配足常备构件,确保机械正常运转,对主要工序将储备一定的备用机械,确保机械化施工的顺利进行。9、根据工程需要,配备充足的技术人员和技术工人,并采用各项措施,提高劳动者技术素质和工作效率。二、工期保证体系图工期保证体系组织保证建立、健全调度指挥系统各级领导层层负责

38、、分片包干加强思想教育,提高合同工期意识协调好各方关系创造良好施工工作保证编制科学合理的施工组织计划做好物资供应和后勤保证突出重点,日清月结杜绝返工和安全事故制度保证工程例会制度工期责任制度实行内部承包制,加大产值所占比第四节 质量、安全保证体系一、质量保证体系1、质量目标确保优良工程,争创优质工程。2、遵循标准认真落实公路工程施工企业质量自检体系管理暂行规定,整个工程及分项、分部工程按规定施工,按施工监理程序和实施细则进行检查,按公路工程质量检查评定标准评审验收。3、质量控制机构项目部成立质量管理领导小组,由项目经理、副经理、质量安全部长、工程技术部长、实验室主任、测量组长组成,是整个工程质

39、量管理和最高领导机构,负责制定整个合同段工程质量创优规划、方针、措施。各施工处分别成立现场质量管理小组,由本队长、质量安检组长、主任工程师组成,在项目部质量管理小组领导下,制定本队施工区段的创优措施,质量实施计划,并在现场落实。施工队成立工序检查小组,所属各专业班组根据自己的创优任务,拟定具体的分项实施计划,由工序检查小组实施到人,严格要求,全员全过程质量控制,结各施工段的关键工序进行重点攻关。4、完善自检体系各施工处建立并完善质量自检组织机构,主要采取措施防止各种质量缺陷事故发生。并积极配合监理工程师的工作,接受他们的监督和帮助。二、安全保证体系1、项目部成立安全管理领导机构,并建立、健全各

40、级部门的安全生产责任制,责任落实到人。2、施工驻地和施工现场实行全封闭式安全管理,杜绝闲杂人员进入干扰。对材料、设备储存的库房或堆放点、施工人员生活区,专人值班防火防盗。3、施工用电配电箱的电缆应有套管,电线进出不混乱,室外支线应架空,不得随地拖拉或绑在脚手架上。室外照明灯具距地面不得低于6m,室内距地面不应低于24m。施工现场及其周围的高压电线,变压器等应有醒目的安全警示标志,尤其是夜间施工时,更应采取具体措施防止出现电击事故。4、建立定期安全检查制度。有时间、有要求,明确重点部位、危险岗位。安全检查有记录,对查出的隐患及时整改,做到定人、定时间、定措施。5、由项目经理主抓安全生产和安全教育

41、。定期召开安全生产会议,检查安全生产规章执行落实情况,建立安全生产奖罚制度,使人人都重视安全。质 量 保 证 体 系 框 图质量保证体系思想保证经济保证质量保证技术保证施工保证提高质量意识项目经理部TQC领导小组加强技术培训,实行计算机网络计划技术,推行全面质量管理创优质工程经济法规经济责任制TQC教育队TQC小组质量第一为用户服务下道工序是用户制定教育计划成果发表工班QC小组掌握规范标准技术交底图纸交底测量复核推广新技术工艺检查创优效果制定创优措施明确创优工程优质优价完善计量支付手续制定奖罚措施百含包干签定包保责任状检查落实改进工程质量总结表彰先进提高施工技能技术岗位责任制质量责任制接受工程师监察定期不定期质量检查进行自检互检交接检加强现场试验控制充分利用现代化检测手段经济兑现奖优罚劣提高经济效益质量评定安 全 保 证 体 系 框 图经济保证包保责任制度监督检查奖罚分明经济兑现安全保证体系思想保证组织保证制度保证提高全员意识项目部安全领导小组各项安全生产制度施工技术安全规则教育安质部各工种安全生产制度安全第一安全为了生产生产必须安全队安质室工班、工种安全检查员月季度安全检查制度安全总结评比制度总目标:无因工死亡和重大伤亡事故,无机械设备大事故,无火灾事故,无重要器材设备被盗和爆炸事故。

展开阅读全文