项目施工管理规划大纲.doc

上传人:sccc 文档编号:5099234 上传时间:2023-06-04 格式:DOC 页数:106 大小:1.23MB
返回 下载 相关 举报
项目施工管理规划大纲.doc_第1页
第1页 / 共106页
项目施工管理规划大纲.doc_第2页
第2页 / 共106页
项目施工管理规划大纲.doc_第3页
第3页 / 共106页
项目施工管理规划大纲.doc_第4页
第4页 / 共106页
项目施工管理规划大纲.doc_第5页
第5页 / 共106页
点击查看更多>>
资源描述

《项目施工管理规划大纲.doc》由会员分享,可在线阅读,更多相关《项目施工管理规划大纲.doc(106页珍藏版)》请在三一办公上搜索。

1、to clean and repair, it is strictly forbidden to head reaches into the mechanical stroke range. 17th article: in overhead transmission line following work should blackout, cannot blackout Shi, due isolation protection measures, crane shall not in overhead transmission line following work, through ov

2、erhead transmission line should will lifting arm falls, in overhead line side work Shi, regardless of in any situation Xia, lifting arm, and rope or weights, and overhead transmission line of recently distance should not is less than Xia table provides: transmission line voltage 1000 v following 1-1

3、5 kV 20-40 kV 60-110 kV 220,000 v Allow minimum distances with the transmission line (m) vertical 1.5 level 1 1.5 2 3 4 5 6 4 6 18th: lamp voltage may not exceed 36 volts, when working in a damp place or metal containers, lamp voltage may not exceed 12 volts. 19th: pressure vessel should have a safe

4、ty valve, pressure gauge, and avoid sun exposure, collisions, oxygen cylinders to prevent contaminated oil; of acetylene gas, LPG, must have a safety device to prevent tempering. 20th: x-ray and gamma-ray flaw detector operation area, non-operator, not allowed to enter. Article 21st: corrosion, dust

5、 and radioactive and toxic work, protective measures are required, and to carry out regular inspection. Spider-man 22nd section III: Spider-man to regular medical examinations of the medical diagnosis, who suffer from high blood pressure, heart disease, anemia, epilepsy and other discomfort in the S

6、pider-man shall not engage in aerial work. 23rd: Spider-man dressed spirit, banned the wearing of hard bottom and easy slip-on shoe nail. 24th: Spider-man material stack stationary, tools should turn into a tool bag, transfer prohibited throwing of objects. 25th: in case of bad weather (such as wind

7、 in the above grade) construction safety, prohibition of the open air, lifting and piling. 26th article: ladder shall not deficiency document, no padded using, ladder cross document spacing to 30 cm suitable, using Shi top to tied prison, bottom should take anti-sliding measures, single ladder and g

8、round angle to 60 degrees suitable, ban II people while in ladder Shang job, as needed received long using, should lashing firm, people Word ladder in end of feet pulled prison, in channel at using ladder, due guardianship or set fence. 27th: no security measures, prohibited in hip joints, supports,

9、 trusses of the roof truss cantilever beams, and choose the frame and half fixed widget or job to walk on, Spider-man and the ground . Nine, ten basic security to prevent vehicle damage claim 1, without legal training of qualified certified personnel not familiar with vehicle performance is not driv

10、ing a car. 2, should insist on doing defense work, vehicle brake, Horn, steering systems, lighting and other safety components such as poor are not allowed out of the car. 3, dump truck, dump truck car hop is strictly prohibited, prohibited goods mixing, loading of vehicles should not overload,stave

11、bn tm vdce mst een. een by mlo zahrnovat analzu rizik, monost nehod charakteristik a nouzovch postup, nouzov zpracovn a obsah opaten. 4, integrovan pohotovostn plny, speciln havarijn plny a mst een by mly bt mezi sebou a s ostatnmi jednotky zapojeny v nouzi, kter jsou vzjemn propojeny. 5, havarijn p

12、ln by ml zahrnovat havarijn personl a organizace kontakt, nouzov rezervn seznam a dal informace. Informace by mly bt pravideln aktualizovny a zajist, e informace jsou pesn a platn. tyi, havarijn pln revize 1, Recenze pohotovostn plny pezkoumn formul a prvky pezkumu a opaten pijatch dvma zpsoby. Kdy

13、host slou pedevm pro havarijn plny pro zznam v podob Recenze, prvek hodnocen pro nouzov hodnocen. . Kd pro porn ochranu konstrukce budov a nsk republice ny exploze nebezpen oblasti elektrick bezpenostnch pedpis a pedpis o porn ochranu design rafinaci ropy a chemickch podnik, napklad poadavky na pedp

14、isech a nazench. 2. pi provdn instalace me zpsobit por, exploze, kter sti by mly bt pln nastaven peht, petlaku, micch pstroj, alarm (zvuk a svtla). 3. kde je holav plyn (pra) me unikat , holav plyn koncentrac detekce, alarm by mla bt nastavena. 4. vechny komunikoval s holav, vbun zazen s inertnm ply

15、nem, plynov penosov potrub, by mla bt nastavena zabrnit holavch a vbunch ltek do zazen, ale nemla bt samostatn zptn ventil. 5. holav plyn (pra) nastavit plamen svodi odvzduovac vvod, snadno pracovat, kde se zastavit ventily, aby pi vstupn vtrac potrub je v plamenech, peruil por plynu odvzduovac potr

16、ub ml bt nainstalovn v nejni hasicho zazen. 6. kdy dopravu holavch materil by mla odpovdat prmru potrub a stedn mrn odpor, sprvn zen prtoku, co nejvce se vyhnout statick elektiny. Antistatick opaten, jako jsou zazen, potrub, by mlo bt v souladu s technickmi pedpisy pro uzemnn design pro chemick podn

17、iky pslunch ustanoven. 7. nhl vbun petlaku nebo rychlho rozkladu vrobnch zazen nebo skladovacch zazen by mly bt vybaveny vbuchu (nevbun membrna), vvoz nonel trubice smrem k bezpenosti a aby prevence sekundrnch exploz, protiporn opaten. 8. vrobnthe principle of simplified EIA of construction projects

18、 in the region. In terms of land, linked to the implementation of urban and rural construction land increase and decrease, replacement indicators for priority areas project. Charges, into the projects of water, electricity, administrative charges and preferential policies. In the area of taxation, a

19、nd settled in areas of industry and its production company, within 5 years after the completion of fiscal incentives to enterprises. In terms of financing, integration of land, tax, financial and other resources, and construct Government credit + business credit credit system, establishment of marke

20、tization, commercialization and modernization of the investment and financing platform; effective Bank-enterprise docking, encourages private capital into the Park, to raise industry development fund. 5, optimize the environment and service industries. To create policy lowlands, Highlands, integrity

21、 of service land, development land as the goal, to optimize the area under development environment. All administrative law enforcement departments to appoint a full-time personnel stationed in areas dedicated to coordinating and solving problems associated with businesses in this sector. When there

22、are substantial issues, sector leaders arranged to personally intervene, in-person, in-person push tangible area building a green light, easy line. To further reduce and standardize administrative examination and approval items, simplify examination and approval links, improve efficiency; according

23、to the .Since the educational practice of the mass line of the party, himself seriously in the education, practical control central eight rules and opposing the four winds and practicing three Suns, and check the spirit of Jiao Yulu, ideology, solicit opinions based on outstanding problems checked s

24、wing, careful analysis and reflection. Will now check report is as follows: first, adherence to the partys political discipline, eight in the central provision, change the style of the basic situation of 1, in compliance with the partys political disciplines. Conscientiously abide by the partys poli

25、tical discipline, abide by the Constitution and the rules and regulations of the party, in the political, ideological and maintain highly consistent with the CPC Central Committee on the action, there is no violation of the partys political discipline problems. 2, in the implementation of the centra

26、l authorities of the eight provisions. Improving research, improving research methods, but there are less grass-roots units, primary first-hand an inadequate grasp of the problem, which is to be strengthened in the future. Second, construction, strictly in accordance with the provisions to streamlin

27、e and improve the quality of meetings of the Conference. Third, streamlining file briefs, culture involves all aspects of propaganda and ideology, sometimes due to the practical needs of invention notifications, this area needs further 编制依据u 农村电网改造升级工程定结县农网改造升级工程施工二标段u 10kv及以下架空配电线路设计技术规程(DL/T5220-2

28、005)u 35kv及以下电气装置施工及验收规范u 10kv及以下配电线路工程图集第三版(200508)u 架空绝缘配电线路工程图集上册、下册 20039u 10kv配电工程设计手册 200411u 普通混凝土配合比设计规程(JGJ/T552001)u 混凝土强度检验评定选准(GBJ10787)u 钢筋焊接及验收规程IJGJ182003)u 土石方与爆破工程施工及验收规范(GBJ201-83)u 电力建设安全健康与环境管理工作规定(国电2002版)u 电力建设安全项目管理规范(GB/T50326-2006)u 电力建设安全工作规程(GB/T50323-2006)u 国家电网公司输变电工程安全文

29、明施工标准化工作规定(试行)国家电网基建2005403号u 国家电网公司输变电工程安全文明施工标准化图册u 国家电网公司“输变电工程达标投产考核评定选准(2005版)一、项目概况与项目实施条件分析1.1项目简述项目名称:农村电网改造升级工程定结县农网改造升级工程施工二标段。线路起止地点、线路长度、杆塔数量及线路走径:1、工程量35kV变电站(1)定结35kV变电站规模为:主变压器一台,容量22MVA, 35kV进出线2回,预留2回, 10kV线路8回,无功补偿容量为:300kvar。(2)琼孜35kV箱变规模为:主变压器一台,容量1MVA, 35kV进线1回,预留1回,10kV线路进出线4回,

30、无功补偿容量为:200kvar。(3)萨尔35kV箱变规模为:主变压器一台,预留一台,容量1MVA, 35kV进出线2回,预留1回, 10kV线路进出线3回,无功补偿容量为200kvar。35kV线路新建35kV线路50.91km, OPPC光纤56.01km。10kv以下工程1)萨尔乡10kV线路新建工程6.44km,台变9台/439kVA;400V线路新建工程3.33km,400V线路改造工程8.91km;220V线路新建工程3.09km,220V线路改造工程10.18km;新建户表98户,改造户表224户。2)琼孜乡10kV线路新建工程40.04km,10kV线路改造工程5.63km,台

31、变15台/723kVA;400V线路新建工程6.17km,400V线路改造工程6.58km;220V线路工程6.88km,220V线路改造工程7.16km;新建户表332户,改造户表292户。 3)定结乡10kV线路新建工程24.03km,台变8台/310kVA;400V线路新建工程7.14km,400V线路改造工程3.2km;220V线路新建工程6.98km,220V线路改造工程4.73km;新建户表376户,改造户表49户。 4)日屋乡10kV线路改造工程10.54km,台变2台/100kVA;400V线路新建工程1.8km;220V线路新建工程2.7km,新建户表30户,改造户表86户。

32、建设工期:2012年05月15日开工,2012年11月30日达标投产。1.2工程特点10kv以下工程本标段线路主要特点为海拔高,高山占25% 平地占47%;丘陵占23%、沼泽占5%。萨尔乡、日屋镇:萨尔乡现由县级电站荣孔电站供电。日屋镇现由扎西热卡电站解决该镇的用电,本工程在萨尔乡建一座1MVA箱变,向萨尔乡供电,同时与日屋镇联网。萨尔变至日屋镇的10kV线路较长,在该线路上增加两台分段开关(真空断路器,在鲁热村至强布村10kV线路上的N1、N153)。萨尔乡新建10kV线路6.44km,新建0.4kV线路3.33km,改造0.4kV线路8.91km,新建0.22kV线路3.09km,改造0.

33、22kV线路10.18km,配电变9台。日屋镇:改造10kV线路10.54km,新建0.4kV线路1.8km,新建0.22kV线路2.7km,配电变2台。琼孜乡、定结乡:本工程在琼孜乡建一座1MVA箱变,向琼孜乡、定结乡的村庄供电。定结乡的岗热村、土登村、多旺村由于地处偏远且不通公路,本次无法用电网解决其用电,考虑采用户用光伏予以解决。在琼孜变至扎贵村(N126)和分支至牧村(N1)的10kV线路上各增加一台分段开关;在琼孜变至东热村(N16)和普罗村至琼孜乡(N111)的10kV线路上各增加一台分段开关。琼孜乡新建10kV线路40.04km,改造10kV线路5.63km,新建0.4kV线路6

34、.17km,改造0.4kV线路6.58km,新建0.22kV线路6.88km,改造0.22kV线路7.16km,配电变15台。定结乡新建10kV线路24.03km,新建0.4kV线路7.14km,改造0.4kV线路3.2km,新建0.22kV线路6.98km,改造0.22kV线路4.73km,配电变8台。 35kv线路本标段线路主要特点为海拔高,线路长50.91km。(1)定结县城35kV变萨尔35kV箱变35kV线路:35kV线路从定结县城35kV变出线侧途经一片丘陵地带翻越夏琼山、库经山后至萨尔35kV箱式变电站,线路全长22.45km;高山占26% 平地占55%;丘陵占15%、沼泽占4%

35、。(2)萨尔35kV箱变至琼孜35kV箱变:35kV线路从萨尔35kV箱变出线侧途经一片丘陵地带两次跨越叶鲁河后至琼孜35kV箱式变电站,线路全长28.46km;高山占26% 平地占55%;丘陵占15%、沼泽占4%。工程地质条件: 线路走向大致南西30度,自萨迦出线后大部分沿X205县道通行,至吉角一带沿乡道通行。线路穿越了雅隆藏布、拉冬扎乌、叶如藏布等河谷冲洪积地貌、中高山地貌,地形起伏差大于500米。自定结县城向北至曲雄约50公里地形起伏变化较大,两岸山体坡度较陡,一般3050度,其余地形较平缓。沿线出露的地层岩性以第四系冲洪、崩坡积、残积的砂卵砾石层、碎石土层为主,局部为三叠系下中统的板

36、岩和变质石英砂岩。1.3建设地点及环境特征1.3.1建设地点定结县位于西藏南部、日喀则地区南部、喜马拉雅山北麓,南于尼泊尔毗邻,东临岗巴县,北靠萨迦县,西连定日县,距日喀则237km。全县总面积7566 km2,是西藏自治区边境县之一。1.3.2沿线自然特征线路走向大致南西30度,自萨迦出线后大部分沿X205县道通行,至吉角一带沿乡道通行。线路穿越了雅隆藏布、拉冬扎乌、叶如藏布等河谷冲洪积地貌、中高山地貌,地形起伏差大于500米。自定结县城向北至曲雄约50公里地形起伏变化较大,两岸山体坡度较陡,一般3050度,其余地形较平缓。沿线出露的地层岩性以第四系冲洪、崩坡积、残积的砂卵砾石层、碎石土层为

37、主,局部为三叠系下中统的板岩和变质石英砂岩。根据中国地震动参数区划图GB18306-2001),本工程的地震动峰值加速度为0.10g,地震动反应谱特征周期为0.45s,相应地震基本设防烈度为度。线路所经地区冬季气温低,标准冻深约0.81m。1.4施工条件与社会环境分析1.4.1 施工承包范围承担的工作内容为该标段范围内的如下工作:承包的工作范围为线路及配套工程的全部本体工程施工;提供施工所需施工机具、人力及其它施工资源;参加发包方供应的材料在采购过程中的管理;负责项目法人供应的材料到承包商中心材料站的质量验收工作;负责项目法人供应的材料从交货地点到承包商中心材料站的装卸、运输以及现场保管;负责

38、项目法人供应的材料以外的其它材料采购、运输、保管;为保证施工安全、质量、进度所采取的各种措施,以及为正常施工进行的各种协调工作;协助建设单位永久性征地、青苗赔偿、树木砍伐、线路通道清理、通讯干扰处理(一、二级通讯线除外)、施工临时占地、房屋拆迁等工作,以及为了正常施工所需办理的一切手续。配合中间验收、竣工验收、线路参数测试、系统调试、保证线路畅通,移交前的维护;竣工资料的移交;1.5项目管理特点及总体要求1.5.1 项目管理的特点本工程施工承包的方式:包工主材甲供。施工中应加强计划经营管理工作,合理组织施工用工;工程主要材料(电杆、铁塔、拉线、导线、金具、铁附件等)均由项目法人提供;基础材料(

39、混凝土材料、钢筋)均为我方提供;本工程管理将严格执行公司项目制管理的要求,成立农村电网改造升级工程定结县农网改造升级工程施工二标段项目部,由公司聘任项目经理、项目副经理和项目总工程师,由项目经理聘任项目部管理人员,并择优选择施工人员,项目部对公司直接负责,按照项目制管理的要求,严格控制施工质量、安全、进度及成本;根据本工程的设计特点和施工及质量要求,有针对性地积极开展QC质量活动,从基础、杆塔、放紧线施工等方面入手,完善施工工艺方法,提高施工质量。本工程采用先进的P3与EXP项目管理系统,对施工的进度及资源实行全过程控制;1.5.2 项目管理的总体要求质量标准:满足满足设计和验收规范要求,确保

40、工程质量总评必须为优良,并满足:分项工程合格率100,分部工程优良率100;安全要求:杜绝死亡事故和重大设备事故;工期要求:2012年05月15日开工,2012年11月30日达标投产。环保要求:施工应加强环保意识,尽量减少对植被的破坏,作好弃土的处理工作和施工后的环保复原工作;二、项目施工管理组织结构2.1计划投入的施工队伍为加强施工管理,成立“农村电网改造升级工程定结县农网改造升级工程施工二标段项目部”,工程实行项目经理负责制,代表公司负责本工程的全面管理。项目经理部下设经营部(计划科、财务科)、工程部(技术科、质安科)、器材部及办公室,按照其职责承担施工经营、技术、质量、安全、物资供应、后

41、勤保障、双文明建设及地方关系协调等工作。各部门主要人员均为从事送电线路施工管理工作多年,业务熟练、经验丰富。施工期间项目经理、项目副经理、项目总工程师将长期坚持现场工作,不做调换,项目管理机构仅负责本工程的管理,工程处不再安排其它事务。2.2项目管理组织结构(见下页附图:项目管理组织结构图)项目管理组织结构图工程监理单位工程建设单位工程管理单位公司主管单位项 目 经 理 部项 目 经 理项 目 总 工公司各职能科室工程部质检部器材部安检部施工一队施工二队车 队队长: 队长: 队长: 质检员:1人安全员:1人技术员:1人测 工:1人质检员:1人安全员:1人技术员:1人测 工:1人安全员:1人2.

42、3职责与分工2.3.1 项目经理项目经理由公司经理授权,全权负责本工程的施工管理工作,代表公司履行施工合同,在授权范围内处理和决策与本工程项目有关的一切事宜。履行“项目管理目标责任书”规定的任务,组织编制项目管理实施规划,推进管理标准化。协调项目部与工程建设管理单位、监理、设计、地方政府及工程运行单位之间关系,解决施工过程中存在的问题,科学组织、合理调配工程资源,确保本工程各项计划的顺利完成。主管工程的安全和质量控制工作,负责组织有关部门严格贯彻安全法令、法规和措施,按质量保证体系的要求,确保安全文明施工和工程施工质量,确保工程安全事故“零目标”的实现。督促经营、工程部按时向业主和监理部门报送

43、施工进度报表和安全报表。自觉维护业主、企业和职工的权益,完善企业的经营机制,搞好经济责任制,确保业主的要求和公司下达的各项经济技术指标的全面完成。向业主负责,施工过程中及时向业主、监理工程师、设计代表和公司本部反馈信息,确保工程建设有序进行。2.3.2 项目总工程师在项目经理领导下,对本工程的技术、质量和安全工作负直接责任。负责解决施工中的技术问题,主持技术会议,制定技术措施并组织编制技术文件。经常深入现场检查和指导工作。参加施工图纸的会审和交底工作。组织编写施工组织设计,制定各项技术管理制度,审批安全技术措施和质量保证措施。对施工质量全面负责,积极推进“零缺陷”管理等先进的质量控制方法。参与

44、质量事故、安全事故的分析并制定防止事故发生的技术措施。经常与项目法人、设计、监理、运行代表联系,征求其对工程施工的意见和建议,促进施工项目安全、优质、按期完成。制定各项技术培训计划。对各类人员的技术教育培训、考核和资格确认、持证上岗负领导责任。运用工程项目管理软件(P3、EXP)对工程实行动态管理。对工程进度计划及时进行修正,使工程进度计划与实际进度相符合。负责新技术、新工艺、新材料、新设备的推广应用。2.3.3 经营部编制本工程施工经营计划。遵循统计法和项目法人要求,真实、及时报送各类统计报表。负责本工程项目的各类合同管理、施工预算的编制及经济承包责任制的实施。对工程的成本进行控制,对内、对

45、外进行工程结算及成本核算。负责资金、劳动力管理。2.3.4 技术科负责技术管理工作。参加施工图审查和交底工作,严格按图施工。编制各道工序施工的补充作业指导书和各项安全技术措施,并坚持现场指导和检查工作,解决施工中的技术问题。协助项目总工做好新技术、新工艺、新材料、新设备的推广应用,在技术方面确保工程质量符合规定要求。协助专职质检员、安监员进行各项质量、安全检查。2.3.5 质安科贯彻执行原部颁“质检大纲”和公司依据GB/T19001质量管理标准制定的程序文件,确保公司质量体系在本工程中有效运行。对工程质量实施监督检查,负责本工程质量计划的制定并在施工现场负责其实施。加强过程控制。对关键工序和影

46、响质量的薄弱环节,制定预防措施。负责质量检查、检验,质量状况分析和统计工作,根据分析结果提出整改意见并制定防范措施,并对整改结果进行验证。配合项目法人及监理工程师对工程质量进行监督,接受其对质量的要求和意见,提出整改措施,确保工程优质建成投产。在施工全过程中负责执行公司质量奖惩条例,并确保公司各项质量制度在本工程得到有效的落实。认真执行国电公司电网建设分公司“工程档案管理实施细则”,做好工程资料的管理、控制。对设计质量、材料质量及施工质量严格把关,为项目法人移交一个优质工程。按时编制、上报质量月报表。2.3.6 器材部建立健全器材管理的各项规章制度,按公司贯标程序文件要求,编制设备、材料购置和供应计划并具体实施。建立健全各种材料设备的台帐。负责自供材料的采购、验收、运输、保管,严格按照国家有关标准及工程建设单位的要求保证材料质量。参加项目法人供应的材料在采购过程中的管理。负责所有材料的分类、标识、保管和发放。负责机械设备的运输、保养、维修,并确保其使用的有效性。负责工器具的检验、配置、维修和发放。负责计量器具的检验、配置,确保量值的准确性。负责工程爆破物品的采购、运输、储存、领退等工作的管理。2.3.7 施工队严格执行项目经理部的决策和施工计划,合理安排本队的施工力量,安全优质地完成本队施工任务,严格过程控制,坚持文明施工,保护环境。2.4主要人

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号