资源描述

《路基填筑试验段施工方案(片石盲沟).doc》由会员分享,可在线阅读,更多相关《路基填筑试验段施工方案(片石盲沟).doc(17页珍藏版)》请在三一办公上搜索。

1、In order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions,

2、 make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student know

3、ledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, an

4、d so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police stat

5、ion, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always

6、 maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive

7、 measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctiona

8、l Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent acc

9、idents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls,

10、ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are s

11、afe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is

12、 developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire中铁二十二局集团有限公司简蒲高速公路JP

13、TJ-9标段 路基填筑试验段施工方案目 录一、编制依据1二、编制原则1三、工程概况2四、施工准备工作2五、工期安排4六、测量工作、程序5七、路基试验段施工目的5八、地基处理6九、路堤填筑试验施工工艺及控制要点8十、红线施工防护措施12十一、路基工程环境保护14十二、路基试验段资料的整理、分析及结论14Electricity lines, equipment inspections, found hidden in time for rectification, maintenance, and security. 9, do not use an open flame in the class

14、room, prohibit burning stove, lit candles, mosquito repellent, no smoking, and banning messy wiring. Without using any household appliances is not allowed. 10, live on campus faculty members, must lead by example, and educate families and children ready to fire. 11, household use of gas in schools,

15、to master proper usage, pay attention to the leak-proof, explosion-proof, fireproof, closing valve after use to ensure security. 12, dining room must be qualified, and annual testing of pressure vessels, to regularly check, the canteen workers must be certified, strictly by operation operation, gas

16、tank and stove safety distance of 1.5 meters, to prevent accidents. 13, the adverse consequences caused by ignoring fire safety regulations, will be punished, until investigated for legal responsibility. Song Lin Xiang Liu Jia ping elementary school March 2016 Xiang Liu Jia ping elementary school, p

17、ine slopes surrounding safety management system 1 teachers and students, the surrounding area of the school governance covers personal and food hygiene, cultural events and other aspects, integrated governance shall obtain wide support and full cooperation of the community. On the surrounding enviro

18、nment in schools should be closely monitored. 2, school work at the same time, should pay attention to the safety management of school environment, should take the initiative to contact the district police station, the village Committee, Correctional Centre, Township government, business management

19、and other departments to do a good job management. 3, teacher on duty with the exception of inspections in schools, should also pay attention to environmental inspections near the campus, found that the jobless migrants from rural areas, for example, harassment of students and a variety of accidents

20、, according to different situations reported school officials or the police station in a timely manner, to protect the safety of students. 4, every day before school, teachers remind students, pay attention to traffic safety. 5, should educate students to respect social ethics, and various regulatio

21、ns, maintaining public order, and fight the bad guys, and grasp the correct ways and means of maintaining and improving students self-care ability. 6, the establishment of emergency rescue teams of teachers in schools, on high alert and deployed. Song Lin Xiang Liu Jia ping elementary school March 2

22、016 song Lin Xiang Liu Jia ping primary school teachers and students organizations out of safety management system organization activities between teachers and students, to draw up a precise plan and security measures must be signed by the school officials to review the programme of activities agree

23、d upon Correctional Center agreed to implement. Organization to the field relatively far or activities require approval by the Deputy Director of the Education Bureau in charge of security. 2, each activity should have a specific responsibility, pay attention to the persons age, physical match. Rout

24、e 3, activities, location, field surveys should be carried out in advance. 4, activities for the means of transport should explain the situation to the school to comply with vehicle, safety requirements, before the line for repairs. 5, each activity must have security, emergency response plan for ac

25、cidents. 6, picnics, hiking, picnic to pay attention to fire prevention, food poisoning, prevention of fall accidents 7, the activities near the rivers, reservoirs, no measures or do not meet the security requirements of the Organization and not let students into the water15路基填筑试验段施工方案1.编制依据1.1四川省高速

26、公路施工标准化技术指南;1.2公路工程质量检验评定标准JTG F80/01-2004;1.3公路路基施工技术规范JTG F10-2006;1.4公路土工合成材料应用技术规范JTG/T D32-2012;1.5招标文件、设计图纸及资料、招标答疑文件;建设单位、设计单位、监理单位的相关文件要求;1.6我部现场踏勘、调查所获得的有关资料。1.7我单位拥有的科技工法成果和现有的企业管理水平,劳力、设备技术能力以及长期从事公路建设所积累的丰富的施工经验。1.8国家、地方政府有关安全、环境保护、水土保持的法律、规程、规则、条例。2.编制原则2.1严格遵守部颁规范、规程和规则等技术标准并将其贯穿于整个施工过

27、程中。2.2 结合现场调查情况及我单位承诺的工期、质量、安全等各方面要求,制定出完善的保证体系和保证措施,确保该项目标的实现。 2.3充分考虑气候、季节对施工的影响,合理安排各工序顺序,做到全面展开,平行流水作业;正确选用施工方法,科学组织。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序进行。2.4坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,确定经济施工方法,积极采用新技术、新工艺、新机具、新材料、新测试方法。2.5合理安排装载、运输、翻晒、平整、碾压等机械设备配套,确定经济合理的配套方式。2.6建立健全质量管理体系和制度,配备专职

28、质检人员进行全过程控制;工程质量符合国家、四川省现行的质量验收标准和工程建设标准强制性条文。2.7坚持文明施工,注重环境和水土保持,争创“安全生产、文明施工标准化施工工地”。3.工程概况中铁二十二局集团成都经济区环线高速公路简阳至蒲江段JPTJ-9标位于四川省眉山市仁寿县、彭山县及东坡区境内,起讫里程为K261+201K274+100,线路长度为12.899km。主要工程内容有路基挖方142.79万方,填方295.86万方,借方190.03万方,弃方36.96万方,桥梁1147m/9座,分离式立交5座,分离式立交兼渡槽2座,人行天桥兼渡槽1座,钢筋混凝土涵洞及通道36座,互通式立交1座,服务区

29、1处。混凝土总量为191014.59m3 ,钢筋总量为11369.69T。我部试验段选在东坡土地互通DK0+100DK0+280段,长100米,避开了过渡段,属于路基填筑段,路堤最大填高14.45米,坡率分别为1:1.5、1:1.75。该段路基具有基底处理典型代表性,基底处理为片石盲沟+防渗土工布。边坡防护处理采用 菱形网格护坡,有M7.5浆砌片石,M10浆砌C20砼块内植草+栽种灌木防护。 4.施工准备工作4.1填筑路基试验段施工前,由主管工程师兰钊华召集技术人员、施工人员、机械操作人员等进行详细的技术交底,确保路基试验段每个施工人员都知道每道工序的操作。4.2路基试验段人员安排及分工施工现

30、场负责人:王 磊技术质量负责人:兰钊华质量检测工程师:赵鹏飞现场技术员:彭 伟安全负责人:李 阳试验负责人:葛红淼测量负责人:潘阳明4.3报检程序检查项目按JTG F80/01-2004要求执行,现场技术员彭伟向技术质量部报检,质检员李阳自检查合格后报检监理单位,监理工程师抽检一个断面,检查合格后方可进入下道工序。4.4施工机械组合及有关规定4.4.1各类机械不得偏载、超载。4.4.2各类机械停机地面必须整理或铺垫于水平状态。4.4.3用挖掘机或装载机挖、装时,回转半径内不得有人,向车辆装载时,应降低铲斗,严禁从驾驶室顶上越过。受场地限制时,宜用机退车进,车走机进的方式装运。4.4.4司机应常

31、检查机械的制动装置,确保其有效性,发现问题排除后方可使用,严禁机械带病作业。4.4.5经常保养、检查各类路基施工设备,以保持设备有较高的完好率、使用率。4.4.6夜间施工时必须有照明设备和安全防护。序号机械设备名称规格及型号数量技术状况进场日期使用工点备 注1推土机山推SD16T1台良好2014.9.30简蒲高速JPTJ-9标平场2压路机(20t)SR22MP1台良好2014.10.30简蒲高速JPTJ-9标碾压3洒水车EQ1411台良好2014.10.30简蒲高速JPTJ-9标洒水4自卸汽车金王子3006台全新2014.10.30简蒲高速JPTJ-9标运输5装载机50C1台良好2014.10

32、.30简蒲高速JPTJ-9标装料6挖机Cat320D1台良好2014.9.30简蒲高速JPTJ-9标装料4.5试验、测量仪器主要仪器设备表序号名 称规格型号数 量备注一试验仪器1K30承载板30cm1套2轻便动力触探仪N101套3灌砂仪5L1套4环刀200cm310个5烘箱1051101台6天平1/100g1套7天平1/1000g1套8台秤10kg1套9磅秤100kg1套10液塑限联合测定仪光电式1套11重型击实仪4.5kg锤1套12比重瓶100ml10个13乙种比重计2支14土工筛1套15脱模器1套16恒温恒湿箱2011套二测量仪器1全站仪莱卡12011套2水准仪B3201套3钢卷尺30m1

33、把4钢卷尺5m2把5.工期安排路基试验段拟在天气较好的期间进行,初步拟定工期安排计划如下:5.1施工准备阶段:2014年12月10日2014年12月15日;5.2地基处理阶段:2014年12月15日2014年12月20日;5.3施工阶段:2014年12月20日2014年12年30日;5.4成果整理阶段:2014年12月30日2015年1月6日。6.测量工作、程序为了确保路基试验段工作的顺利进行,由路基队技术人员、测量人员负责路基试验段的施工测量、资料收集、整理等工作,以便尽快完成路基试验段工作。测量具体安排如下:6.1测量准备6.1.1人员具体分工如下:观测:张锐计算:潘阳明前后视:魏彬彬6.

34、1.2测量控制依据采用K273+700附近的JM-2点。6.2 测量程序从2014年12月10日开始,2015年1月6日结束,每层测量程序为:测底面高程开挖盲沟测沟底高程片石回填铺设防渗土工布-路堤填筑高程。(碾压到试验检测要求)6.3测量成果6.3.1 测量记录见水准仪测量记录表(见附表样本) 7.路基试验段施工目的7.1 为了模拟本管段路基施工动态,了解施工程序,熟悉施工工艺,掌握施工方法及施工中的重点、难点。7.2 培训和检验挖掘机、推土机、压路机等机具操作人员的施工经验和工作能力。7.3 检验我项目部技术人员、管理人员和机械设备等能否满足施工要求及人员的协调能力。7.4 了解机械的性能

35、,功率及完好情况,检验试验段施工方案的可行性及施工工艺的合理性。7.5通过试验路段取得路基压实机械组合、松铺厚度、松铺系数,片石盲沟的施工工艺等有关控制参数,作为本标段软土路基施工填筑的依据。8.地基处理本实验段地基处理采用基底处理为片石盲沟+防渗土工布。8.1原地面处理施工工艺流程见图。施 工 准 备定出处理范围开 挖 盲 沟防渗土工布-=岩-摊铺第一层并压实 路基填筑 片 石 回 填测 量 高 程复核高程后测量放样 复 核 高 程 原地面处理施工工艺流程图 8.2主要机具及设备编 号机具名称型 号单位数量备 注1挖掘机Cat320D台12自卸车10T台23装载机ZB50台18.3 施工准备

36、8.3.1 盲沟排水是通过采取有效措施,使含水量较高的路基保持在允许含水范围内,保证路基安全和路基处于稳定状态,满足使用要求。施工前应据设计图纸,认真施工,并认真做好路基临时排水。8.3.2 施工放样:必须在路基挖除软土后,换填至盲沟设计标高。8.3.3 开始准确放样,精确测定盲沟起止点,沟底纵坡,两端衔接是否顺直,和其他支盲沟是否能够很好的连接。8.4 材料要求8.4.1 片石:采用爆破法或楔劈法开采的片石,厚度不小于15cm,其宽度与长度不小于厚度的1.5倍,无锋棱凸角,顶面及底面大致平行;尺寸较大,并稍加修整,其强度不小于30Mpa。 8.4.2石料应强韧、密实、坚固耐久,质地适当细致,

37、色泽均匀,无风化剥落和裂纹及结构缺陷。石料的运输、储运和处理,应不使有过量的损坏和废料。8.5 施工方法8.5.1盲沟设计为梯形,在盲沟的底部用片石填筑,粒径150mm-400mm。片石表面应清洁,片石摆放铺设采用人工铺设。片石铺设应整齐规范,孔隙应清晰以便保证流水通畅。8.5.2盲沟的设置深度,应满足渗水材料的顶部不得低于原有地下水位的要求。当排除层间水时,盲沟底部应埋设与最下面的不透水层上。8.5.3当采用土工织物作反滤层时,应先在底部及两侧沟壁铺好就位,并预留顶部覆盖所需的土工织物,拉直平顺紧贴下垫层,所有纵向或横向的搭接缝应交替错开。搭接长度均不得小于300mm。8.5.4盲沟只宜用于

38、渗流不长的地段,且纵坡不小于1%。8.5.5 土工布铺设:本工程土工布铺设要求在片石填筑完毕,土方填筑之前铺设,铺设宽度符合要求、搭接正确。土工布在铺设之前要求先检查片石表面平整度、高度、有无带尖棱硬物,表面要求人工整平、把不平处凹凸处用小碎石填平。铺设时要求施工技术人员所放边桩进行控制铺设位置。技术人员所放边桩距土工布边30cm,每20米个边桩,铺设时先把土工布打开,土工布拉开后用4人拉直,按边桩用钢尺把两边尺寸先放对,然后按控制桩把中间土工布调直,调直完毕后用土把土工布四周盖一下,以免被风吹起。铺设完毕后应经监理工程师合格后方可进行路基填筑施工。8.6质量保证措施8.6.1 基础开挖后,工

39、程施工人员应时刻把好质量关,每道工序经质检、试验、测量等检测人员到场,检查他们责任范围内的工序质量合格,并经监理工程师签证认可后,方可进行下一道工序。8.6.2 该工程所用的碎石材料等都应取得检验合格证方准运进场。否则,拒绝签收签证、验收,更不能使用。8.6.3 若遇雨季施工时,应加强排水措施的处理,以防雨水冲刷基础,影响工程质量。9.路堤填筑试验施工工艺及控制要点 9.1第一层填筑地基承载力达到要求后,开始进行路基本体第一层填筑。所用的填料为B组填料,来自K273+780-K273+953挖方段。9.1.1 由路基队测量人员负责测量工作,采用在两端立杆引桩保护的措施,随时控制并恢复试验段中线

40、,确保中线准确。由技术员按5m的间距在已整平压实的基底上用石灰撒线布置方格网。同时测量各网格交叉点的高程,记录为第一层的底面高程。9.1.2第一层摊铺整平:预计松铺厚度40cm,自卸车装运料10.0m3, 为便于控制松铺厚度,经过计算每格方格网面积为25 m2,设置每方5m5m,每个方格填料1车(由卸时装载机控制)。车运料,现场设一名专人负责指挥依次倒料,上料结束后,用推土机摊铺,人工配合找平。填料时用竹签做标记,用插入法和边桩控制松铺厚度并做成2的横坡。摊铺时随机取样,用炒干法现场进行含水量检测,现场检测的含水量与最佳含水量比较偏差,规定允许偏差在-3+2%之内。如大于最佳含水量,则采取摊铺

41、晾干等方法,如低于最佳含水量,则进行洒水湿润。9.1.3测量放线布网格:在松铺整平的填料上放线撒石灰布网格。网格布完后,测每个网格交叉点的高程,记为第一层的松铺高程。网格形式和高程测量顺序上述执行测量程序。9.1.4碾压填料在整平后,进行碾压前对填筑层的厚度和平整程度进行检查,确认层厚和平整程度符合要求方可进行碾压。先用推土机对表面进行预压,然后再用振动压路机压实,压路机吨位采用20t。碾压遍数:根据土质情况,碾压遍数由压实度确定,初步确定为5遍:第一遍静压,第二遍弱振,第三遍、四遍强振,第五遍静压,按试验检测标准选择四个断面(12个点)检测孔隙率n,孔隙率如果满足基床以下路基填筑设计要求,测

42、量其压实高程,并记录测量数据。检测完成后,再进行碾压,初步确定2遍,第一遍强振,第二遍静压,按试验检测标准选择四个断面(12个点)检测孔隙率n,孔隙率如果满足基床底层填筑设计要求,测量其压实高程,并记录测量数据。压路机行走速度:不大于2km/h。碾压方式:由两边向中间纵向进退式进行,沿线路纵向行与行之间横向重叠压实0.4-0.5m,前后相邻两区段纵向重叠碾压长度不小于2m,并对路肩部分450碾压法碾压,确保边坡碾压密实,做到不漏压,不留死角,确保碾压均匀。 9.1.5检测项目及压实标准基床以下路堤检测项目及压实标准项 目压实标准检测数量碎石类及粗砾土地基系数K30(Mpa /m)110每填高0

43、.9m, 100m每层沿纵向范围内检测4点,距离路基基边2m处各2点,中间2点。孔隙率n(%)32100m每层沿纵向范围内检测6点,距离路基基边1m处各2点,中间2点。基床底层检测项目及压实标准项 目压实标准检测数量碎石类及粗砾土地基系数K30(Mpa /m)120每填高0.9m, 100m每层沿纵向范围内检测4点,距离路基基边2m处各2点,中间2点。孔隙率n(%)31100m每层沿纵向范围内检测6点,距离路基基边1m处各1点。9.2第一层试验完毕,进行第二层试验。在第二层填料前,根据第一层填筑高度、路基宽度、边坡等进行施工放线,恢复边线。同第一层方法布网格、上料、摊铺整平、测高程、碾压、测孔隙率等。所有试验