《云南烟叶醇化仓储中心上项目施工组织设计1.doc》由会员分享,可在线阅读,更多相关《云南烟叶醇化仓储中心上项目施工组织设计1.doc(156页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .云南烟叶醇化仓储中心项目(一期)二标段建设项目投标文件(技术标)招标编号:SZZB15G02
14、5 项目名称: 云南烟叶醇化仓储中心项目(一期)二标段施工文件内容: 投标文件技术部分 投标人(盖公章): 法 定 代 表 人或其委托代理人(签字): 日 期: 年 月 日Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good result, but also actively cooperate with the Departm
15、ent and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force. In the event we, many projects did not get the de
16、sired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor teachers good, proper guidance, thanks to 46 students
17、in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch branch is a fortress, a party member is a banner. Figh
18、ting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. Holding high the flag of our party mem
19、bers, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch is tightly around the center of its activities. Face
20、 South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues Zhijian each other help, each other learni
21、ng business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under the correct leadership of the party branch in the G
22、roup and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. In command personnel less, and task heavy of situation Xia, all members always according to party stronger, and st
23、yle to are, and service better, and efficiency to high of requirements, from overall starting, better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of resul
24、ts, get has owners and the Group and grass-roots units of praise. First, give full play to the exemplary role of party members. The exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political educa
25、tion. We pay close attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, .目 录第一章 编制说明1一、编制原则1二、编制依据1三、 执行的规范标准1第二章 施工部署及组织机构31、施工原则及施工区域划分32、机构设置33、总包管理和与发包人、监理及设计人的配合4第三章 施工技术方案5第一节 土建工程施工技术方案5一、测量方法5二桩基础施工7三、基础土方开
26、挖及回填施工技术方案11四、基础工程施工方法17五、砌体工程30六、预埋件工程施工方法32七、装饰装修工程施工方法35八、门窗工程36九、地面工程38十、 涂饰工程40十一、脚手架工程施工方法42第二节钢结构制作安装施工技术方案55一、钢结构制作施工方法55二、钢结构安装方案62第三节 给排水安装施工技术方案73第四节 电气工程施工技术方案79第四章 主要施工工艺101第五章 冬季和雨季施工方案103第一节 冬季施工技术措施103第二节 雨季施工技术措施108第六章 质量承诺及保证措施110第一节 项目质量计划110一、质量方针110二、质量承诺110三、质量目标110四、组织措施110五、计
27、量管理111第二节 质量控制和保证措施111一、施工准备阶段的质量控制和保证措施111二、土建工程质量保证措施:112三、钢结构制作安装阶段的质量控制114五、电气工程质量控制保证措施115六、外观质量控制115七、交工验评阶段的质量控制115六、质量保证控制体系图116第三节 项目质量体系的运行117一、文件和资料的管理:117二、采购物资的管理117三、施工过程控制117四、检验和试验118第七章 安全文明施工及保证措施119第一节 安全管理目标与保证措施119一、安全生产方针及安全管理承诺119二、安全管理目标120三、安全保证体系120四、施工安全管理120五、安全管理保证制度121第
28、二节 文明施工保证措施128一、目标及承诺128二、场容场貌管理128三、施工现场管理129四、现场总图规划管理129五、生活卫生管理130第三节 环境保护措施130一、环境管理目标130二、环境保护措施130三、环境管理体系的审核132四、对周围管线、建筑物的保护措施132第三节施工场地治安保卫管理计划;133第八章 工期承诺和保证措施133一、工程工期承诺133二、工期保证措施133第九章 成品保护和工程保修措施和承诺136第十章 施工进度计划144第十一章 劳动力投入计划145第十二章 施工机械投入计划147第十三章 施工总平面布置图151151151第一章 编制说明一、编制原则2.1.
29、符合业主招标文件的要求,按照标书目标及要求来编制施工组织设计,积极响应招标文件;2.2.符合基建工程施工的程序和客观规律以及本项目施工的工程特点;2.3.以我公司先进的技术、装备、人员素质为基础,采取科学的施工方法、先进的管理模式、现代化的配置、完善的措施,实现创优目标;2.4.针对本工程的特点及现场条件,选取先进合理的施工工艺;二、编制依据3.1. 云南烟叶醇化仓储中心项目资格预审文件,(招标编号:SZZB15G025)。3.2. 现行的国家技术规范、规程及标准;3.2. 我司对工程地形状况的熟悉掌握;3.5. 我公司承担类似工程的施工经验。 三、 执行的规范标准 序号法规、标准及规范名称法
30、规/标准号1建设工程安全生产管理条例国务院令第393号2建筑施工安全检查标准JGJ59-20113用电安全导则GB/T13869-20084施工现场临时用电安全技术规范JGJ46-20055建筑施工现场环境与卫生标准JGJ146-20046建筑机械使用安全技术规程JGJ33-20017建筑施工高处作业安全技术规范JGJ80-918施工现场消防安全技术规范GB5072020119工程测量规范GB50026-9310钢结构施工规范GB50755-201211钢结构工程施工质量验收规范GB50205-200112建筑工程施工质量验收统一标准GB50300-200113建筑钢结构焊接技术规程JGJ81
31、-200214钢结构焊接规范GB50661-201115气焊、手工电弧焊及气体保护焊焊缝坡口基本形式与尺寸GB/T986-198816钢结构高强螺栓连接的设计、施工及验收规范JGJ81-199117钢结构制作安装施工规程YB9254-9518钢焊缝手工超声波探伤方法和探伤结果分级GB/T11345-198919金属熔化焊焊接接头射线照相GB/T3323-200520涂装前钢材表面锈蚀等级和除锈等级GB8923-198821建筑防腐蚀质量检验评定标准GB50224-9522钢结构防火涂料GB14907-200223钢结构防火涂料应用技术规范CECS24-9024屋面工程施工质量验收规范GB502
32、07-200225建筑工程施工质量评价标准GBT 50375-200626低合金高强度结构钢GB/T1591-200827碳素结构钢GB/T700-200628碳钢焊条GB/T5117-9529低合金钢焊条GB/T5118-9530气体保护电弧焊用碳钢、低合金焊丝GB/T8110-200831埋弧焊用碳钢焊丝和焊剂GB/T5293-199932埋弧焊用低合金钢焊丝和焊剂GB/T12470-200333六角头螺栓 C级GB/T5780-200034六角头螺栓GB/T5782-200035钢结构用高强度大六角头螺栓GB/T1228-200636钢结构用高强度大六角头螺栓、大六角螺母、垫圈技术条件G
33、B/T1231-200637冷弯薄壁型钢结构技术规范GB/T50018-200238建筑用压型钢板GB/T12755-9139建筑施工扣件式钢管脚手架安全技术规范JGJ130-200140纲结构焊缝外形尺寸JB/T7949-199941建筑结构用钢板GB/T19879-200542云南省建筑工程施工质量验收统一规程DBJ53/T-23-200843云南省建筑工程施工质量验收统一规程DBJ53/T-23-200844建筑地基处理技术规范JGJ79-200545建筑桩基技术规范JGJ94-200446混凝土结构工程施工规范GB50666-200247给水排水构筑物工程施工及验收规范GB50141-
34、200348屋面工程技术规范GB50345-200249建筑内部装修防火施工及验收规范GB50354-200550外墙外保温工程技术规程JGJ144-200451建筑钢结构焊接技术规程JGJ81-200252建筑基桩检测技术规范JGJ106-200353建筑地基基础工程施工质量验收规范GB50202-200254混凝土结构工程施工质量验收规范GB50204-200255钢结构工程施工质量验收规范GB50205-200156建筑装饰装修工程质量验收规范GB50210-200157给水排水管道工程施工及验收规范GB50268-200858建筑施工安全检查标准JGJ59-201159建设工程文件归档
35、整理规范GB/T50328-200160建筑工程施工质量验收标准GB50300-2001第二章 施工部署及组织机构1、施工原则及施工区域划分施工原则坚持先准备、后施工;先预制、后安装;先地下、后地上;先大件后小件;先室外、后室内,由低到高的施工顺序。根据厂房平面布置情况,拟将本工程施工化分为两个流水作业段,3#醇化库为第一个流水作业段,4#醇化库为第二个流水作业段,拟安排两个施工队同时施工。2、机构设置3、总包管理和与发包人、监理及设计人的配合3.1该工程不允许分包,不存在总包管理3.2与发包方配合(1)施工准备阶段,项目经理参与工程合同的洽谈,明确施工方与业主方的责权关系,业主应为工程顺利开
36、工提供材料、设计图纸、场地、外部水、电;施工单位应落实施工必需的劳动力、材料、机具、大临设施等。(2)施工单位主动配合业主,做好建设过程中的准备工作及时提出积极建议,想业主所想,急业主所急。(3)施工单位及时提出应由业主供应的设备、材料供应计划,并对业主提供的设备、材料进行交接、验收。(4)施工单位对工程质量严格要求,尊重业主的监督,对重要的隐蔽工程,请业主参加认证签字,方可进行下工序施工。并随时向业主提供材料、设备和报验单及隐蔽工程验收通知等资料。(5)工程施工过程中,出现承包合同条约以外的重大设计变更。材料代用等时,施工单位及时向业主办理手续,业主应积极配合,以此作为交工和结算依据。工程全
37、部竣工,双方应按规定办理交工验收手续,施工单位应在规定时间内提供完整的竣工资料,对验收过程中存在的问题,应采取有效措施,尽快达到设计、合同、规范要求。3.3与监理配合(1)开工前,施工单位为监理开展工作提供必要的条件。(2)工程施工过程中随时接受业主代表和监理单位对工程质量进行监督管理,配合好监理单位对施工质量的随时进行检查或委托有资格的质检部门进行重点抽查。为其开展工作提供方便,提供规定原始记录、检查记录技术及其它资料。(3)隐蔽工程验收提前通知监理,并提供完整的隐蔽工程验收资料,任何分项工程必须通过监理验收方可进行下道工序,监理检查过程中提出的问题必须及时整改,整改合格后必须经过监理检验合
38、格方可继续下道工序的施工。3.4与设计人配合(1)主动参与发包方组织的设计交底,认真领会设计意图。(2)基槽施工完后主动要求设计人员参与,基槽验收工作。(3)施工中发现设计问题,应及时与监理、设计人员联系现场处理。第三章 施工技术方案第一节 土建工程施工技术方案一、测量方法1.1 施工测量的准备工作: 了解工程的总体布局、定位及标高情况。 对图纸进行校核。 确定放线精度。 测量设备、仪器确保在有效期内。1.2 建筑定位放线: 根据工程场地实际情况,采用主轴线控制法,测设和作好建筑位置控制桩,形成“#”形主轴线平面控制方案。控制点需作永久保护。以甲方测量队指定的基准点为基准,全站仪测设轴线控制网
39、,并据此测量出建筑物各轴线。各控制点测定后用混凝土浇筑成300300500mm桩,顶面覆以2002004mm钢板,板面上刻十字作为桩点标志,并砌筑窨井式加以保护。 平面控制网的精度要求:根据建筑的结构和使用特点,布网精度为二级,测角中误差为 12,边长相对误差为 1/15000。 距离丈量方法:距离丈量采用I级钢尺,丈量时必须使用弹簧秤,并进行往返测量。并考虑尺长、温度、倾斜、拉力等各项改正数。具体公式为:(考虑采用标准拉力,则拉力改正数不计)式中:L-丈量时钢尺读数 t0-鉴定时标准温度 L0-实际距离 a-钢尺线膨胀系数 L实-钢尺实际长度 t-测量时实际温度 L明-钢尺名义长度 h-两端
40、高差 角度测设方法:如图所示: 根据已知的起始方向,测设角度:用正倒镜法测出AOB1后,用经纬仪精确测设出AOB1=1,1与的差为,过B1点作OB1,并量取距离。 建筑物高程控制网测设:高程引入采用昆钢设计院测量队指定的已知水准点进行测设,本工程布设4个临时水准点,组成建筑物的高程控制网,控制网的测量采用附和测法。闭合差的要求: L:为附和线路长度。 测设轴线控制桩:根据已布好的建筑物平面控制网,测设轴线控制桩,测设时以两端控制桩为准,测定该边的控制桩,并校核各桩间距,精度同平面控制网。1.3 基础开挖和基础施工放线: 桩位放线依据所测定的各轴线及柱中心与轴线的相互关系定出桩位,并据各种桩型直
41、径+300mm撒出桩孔开挖线。 基坑(槽)开挖放线 根据轴线控制点,按图纸尺寸撒出基坑(槽)开挖边线及放坡线。 基坑(槽)开挖接近槽底时,随时进行抄平,及时在基底按3m3m设标高控制点,并在槽壁上测设出标高控制桩。基底标高允许误差为10mm。 基坑(槽)经相关部门验收合格后,在基底上测设垫层标高,每隔米测设一个标高并做上灰饼。 基础施工放线: 做完垫层后,检查垫层标高。 用经纬仪将控制线投测在垫层上,经闭合校测后,按设计图纸测设出轴线及墙、柱的位置线。 以轴线为准,检查垛子、管道穿墙孔洞、重要埋件等位置。 模板上口轴线位移不得超过mm,内墙用线坠检查,外墙用经纬仪检查。1.4 安装工程施工测量
42、:(1) 钢结构柱施工测量: 钢柱制作完毕后,在钢柱上测设标高点,用油漆标注,作为安装时标高控制的依据。 柱吊装时,用经纬仪校核钢柱垂直度,校核时用经纬仪在相互垂直的两轴线上同时测量(2)标高的传递方式采用起始点均以首层50cm控制线为准处进行传递, 标高传递时采用钢尺沿铅直方向(经纬仪配合)向上量至安装层。钢尺丈量时应考虑各项改正数。(3)放线前应在平面上校核轴线,闭合后测设安装“十”字线。二桩基础施工2. 1测量定位1、桩位测设及复测桩位测设采用NTS352全站仪测量。施测前测量工程师应根据现场测量平面控制网计算出每一根桩的方位角和距离,施测时直接定桩中心点。桩位测设完成后,应按相关规定进
43、行复测,复测采用全站仪测量。 测量时先定建筑各轴线位置及必要的控制线,再根据轴线位置关系用钢尺量出每一根桩的中心位置,并与测设的桩中心位置相复核,偏差大于规范规定的应重新测量。用全站仪测设桩位和复测不得由一个人进行。2、标高测量压桩施工的标高测量主要指桩中心自然地面标高测量和送桩阶段的标高测量。标高控制应根据已经通过监理工程师复核的高程控制网引出标高到施测现场,并进行测量作业。3、测量误差要求 桩基础测量误差不得大于工程测量规范及设计文件允许的偏差范围。2. 2 引孔本工程拟选用长螺旋桩机取土引孔。在施工过程中若遇地下水较多,长螺旋桩机无法施工时,可使用回转钻施工方法进行引孔。施工方法1、钻机
44、就位:钻机就位后,应使钻杆垂直对准桩位中心,确保桩身垂直度容许偏差不大于1%。现场采用经纬仪控制垂直度,也可采用钻机自带垂直度调整器控制钻杆垂直度。每根桩施工前现场工程技术人员进行桩位对中及垂直度检查,满足要求后,方可开钻。2、钻进成孔:钻孔开始时,关闭钻头阀门,向下移动钻杆至钻头触地时,启动马达钻进,先慢后快,同时检查钻孔的垂直偏差并及时纠正。在成孔过程中发现钻杆摇晃或难以下钻时,应放慢进尺,防止桩孔偏斜、位移和钻具损坏。根据钻机塔身上的进尺标记,成孔达到设计标高及设计持力层并经监理工程师检查后,停止钻进进行终孔。钻进过程中,排出孔口的土应随时清除、运走。3、钻机在钻进过程中,不宜反转或提升
45、钻杆。4、钻机在钻进过程中,为保证垂直度,应采用小压力慢转速旋挖,不可进尺太快。一定要密切注意孔壁稳定,预防由于场地局部土层的变化引起孔壁坍孔、缩径等质量问题,若出现类似问题,及时上报甲方及监理,并及时采取相应处理措施。 引孔成形后,清理多余土方,及时进行压桩施工。2.3混凝土的浇筑1、混凝土的运输为了确保混凝土浇注质量,混凝土主要采用商品泵送混凝土,连续浇注。其他少量混凝土采用现场搅拌,混凝土的运输采用混凝土翻斗车从搅拌站运至塔吊服务半径范围内。2、振捣方式振动器插点要均匀排列,可采用“行列式”或“交错式”的次序移动,不应混用,以免造成混乱而发生漏振。振动器的操作,要做到“快插慢拔”。每一插点要掌握好振捣时间,过短不易捣实,过长可能引起混凝土产生离析现象。一般每点振捣时间应视混凝土表面呈水平不再显著下沉,不再出现气泡,表面泛出灰浆为准。现场配备50和30振动器,加强对钢筋密集处和截面较小处的振捣。3、混凝土的浇筑要求(1)为了避免发生离析现象,混凝土自高处倾落时,其自由倾落高度不宜超过2m,如高度超过2m,应设串筒、溜槽。为了保证混凝土结构良好的整体性,混凝土应连续进行浇筑,不留或少留施工缝,如必须有间隙时,间隙时间应尽量缩短,并应在上一层混凝土初凝前将次层混凝土灌筑完毕。(2)灌筑每层竖向结构时,为避免墙脚产生蜂窝现象,在底部应先铺一层510cm厚同