《唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工组织设计1.doc》由会员分享,可在线阅读,更多相关《唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工组织设计1.doc(102页珍藏版)》请在三一办公上搜索。
1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia
2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements
3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the
4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi
5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli
6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar
7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc
8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated
9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc
10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen
11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a
12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and
13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and
14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5
15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu
16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge
17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester
18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.
19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing
20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high
21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab
22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted
23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程 施 工 组织设计审 批:_审 核:_编 制:_北京易成市政工程有限责任公司
24、二O一三年七月目 录第一章 工程概况 -1一、 工程主要施工内容 -1二、 本工程范围描述 -1三、 编制说明 -1四、 编制依据 -1第二章 施工准备计划-3一、质量目标 -3二、工期目标 -3三、安全目标 -3四、环保目标 -3第三章 工程特点、重点、施工难点及对策-4一、自然条件-4二、工程特点分散、工期紧、施工现场条件复杂-5三、管道施工难点及主要对策-5第四章 施工方案和主要分项工程的施工方法-7一、 防波堤工程施工工艺-7二、 管道施工工艺及工程技术总体要求-三、电力、通信管道施工工艺-17四、电缆沟、排水沟施工工艺-22五、设备基础施工方案 -28六、堆场及道路工程施工技术方案-
25、37第五章 项目管理组织机构-42一、 项目组织机构-42二、 项目机构职责划分-43第六章 工期保障措施及劳动力、材料、机械计划-46一、 工期保证措施-46二、 进度控制办法-46三、 劳动力计划-48四、 材料供应保证措施-49五、 拟投入的主要施工机械设备表-50第七章 安全施工的方案及保证措施-51一、 安全保证体系及措施-51二、 安全目标-53三、 安全生产的管理措施-53四、 机械、电气设备使用-54五、 沟槽土方施工安全保证措施-55六、 桩基施工安全保证措施-56七、 公用管线保护措施-57第八章 文明施工的方案及保证措施-58一、 成立文明施工管理机构-58二、 施工围蔽
26、-58三、 机具、材料管理-58四、 交通组织措施-59第九章 环境保护措施-61一、 学习环保知识、法律法规,开展环保知识宣传,提高全体员工的环保素质-61二、 不使用对环境有害或不符合环保原则的材料。在本工程中不使用红砖,只能使用砂砖或其它替代品-61三、 防止噪音污染和光污染-61四、 防止水质污染-61五、 防止粉尘、废气污染-61第十章 质量目标及保证措施-63一、 质量控制指导思想及原则-63二、 质量保证措施-64第十一章 冬、雨季施工措施-74一、 管道工程雨季施工-74二、 管道工程冬季施工-75三、 道路、设备基础雨季施工措施-76四、 道路、设备基础冬季施工措施-76第十
27、二章 施工措施-79一、 与总包及其他相关单位的协调配合措施-79二、 成品半成品保护措施-824.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropri
28、ate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 applicat
29、ion there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter pr
30、ices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-float
31、ing range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amou
32、nt determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commiss
33、ion of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter
34、prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base fo
35、r a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalif
36、ication documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the
37、format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding
38、agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .3第一章 工程概况唐山港京唐港区36号至40号煤炭泊位工程,位于唐山港京唐港区四港池北侧岸线的西端,自二排干预留的15m岸壁起自西向东连续建设2个15万吨级煤炭卸船泊位(水工结构按靠泊20万吨级散货船建设)和3个10万吨级煤炭装船
39、泊位以及后方配套建设的翻车机房、铁路、堆场及辅建区,新建码头长度共计1712m,设计年通过能力为5600万吨。突堤内侧码头为重力式方块结构,前沿底标高-2.0m,码头顶高程+2.5m,东北端头处设翼墙与斜坡护面衔接。码头基础采用抛石基床,一层砼方块出水,施工水位+1m,上部采用砼胸墙。沿码头方向间距40-50m设置一处阶梯以方便人员上下及渔货装卸,间距15m设5T系船柱一个,并间隔设置系船环。间距5m采用一组废旧轮胎作为简易护舷。外侧为斜坡式防波堤,堤身采用抛石结构,堤顶设置浆砌块石档浪墙,墙顶标高+4.5m,墙外采用2T扭王字块护面,坡底采用60-100kg块石护底。整个防波堤兼码头结构总长
40、度1712m采用混凝土面层。引堤部分采用抛石堤身,堤顶外侧设置浆砌块石档浪墙,墙前采用大块石护面,采用混凝土面层。北侧防波堤顶标高+2.5m,采用抛石堤心,人工块体护面结构。一、工程主要施工内容:唐山港京唐港区36号至40号煤炭泊位堆场、道路、管网及设备基础工程施工。其中泊位堆场引堤工程是本次施工内容中的重点,主要包括以下:1、堤身:堤心石抛理,垫层石抛理。2、护面:100-150kg块石抛理,600-1000kg大块石安放,干砌条石。3、上部结构:浆砌挡浪墙,二片石垫层,砼面层。4、码头兼防波堤工程1)、基础:基槽开挖,基床抛石,基床夯实,基床整平。2)、墙身结构:方块预制,方块安装,伸缩、沉降缝。3)、堤身:堤心石抛理,护坦抛石。4)、护面:2吨扭王字块预制、安装,100150kg块石垫层。5)、上部结构:浆砌挡浪墙,现浇胸墙,沉降缝。6)、面层:垫层与基层,面层。7)、附属设施:踏步,灯柱,系船柱制作与安装,系船环等。5、防波堤工程1)、堤身:堤心石抛理,垫层石抛理,护坦抛石。2)、护面:扭王字块预制,扭王字块安装。二、本工程范围描述:主要包括: 1、所有皮带机系统、转接机房、电缆桥架等支撑结构的基础施工; 2、轨道梁基础及堆场铺面结构的施工。