ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc

上传人:sccc 文档编号:4867950 上传时间:2023-05-20 格式:DOC 页数:99 大小:508.51KB
返回 下载 相关 举报
ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第1页
第1页 / 共99页
ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第2页
第2页 / 共99页
ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第3页
第3页 / 共99页
ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第4页
第4页 / 共99页
ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc_第5页
第5页 / 共99页
点击查看更多>>
资源描述

《ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc》由会员分享,可在线阅读,更多相关《ld包头第二热电厂 4机组烟气脱硫旁路拆除改造项目施工组织设计.doc(99页珍藏版)》请在三一办公上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件北方联合电力有限责任公司包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投 标 文 件

24、 投标单位: 日 期: 年 月 日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy ap

25、plication shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pag

26、es. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nin

27、eth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%,

28、otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, co

29、ntrolled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for

30、 the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering a

31、gents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of ten

32、dering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitat

33、ion documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various

34、supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to

35、 provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent . 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件 04725199097-803 04725199095-805 102 * nmgzyxt 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 投标文件 目 录1、 投标书2、 投标书附录3、 开标一览表4、 法定代表人身份证明书5、

36、法定代表人授权委托书6、 投标保证金7、 预 算8、 设计方案、施工组织设计、系统调试方案9、 需提交的其它资料10、公司企业简介1、投标书投 标 书 北方联合电力有限责任公司包头第二热电厂 (招标人):1. 根据已收到的 包头第二热电厂#4机组烟气脱硫旁路拆除改造项目 (工程名称)招标文件,我单位经考察现场和研究上述工程施工招标文件的投标须知、合同条件、工程规范、技术条件和其他有关文件后,我方愿以 人民币壹佰陆拾柒万捌仟零玖元 (大写) ¥1678009 (小写) 的投标报价并按上述图纸、合同条款、工程建设标准、技术规范的条件要求承包上述工程的施工、竣工,并承担任何质量缺陷保修责任。 2.

37、一旦我方中标,我方保证在 双方合同约定的时间 开工, 双方合同约定的时间 日竣工(总工期为 107 日历天)。3. 一旦我方中标,我方质量承诺为: 符合国家验收标准 4. 一旦我方中标,我方安全承诺为: 零事故、无人身轻伤 5. 我方承认投标函附录是我方投标函的组成部分。6. 我方同意所递交的投标文件在“投标须知”规定的投标有效期内有效,在此期间内我方投标有可能中标,我方将受此约束。7. 除非另外达成协议并生效,你方的中标通知书和本投标文件将构成约束我们双方的合同。8. 我方的投标保证金:已向招标代理机构递交贰万肆仟元整(¥24000)投标人: (盖章) 单位地址:包头市青山区幸福路5#街坊法

38、定代表人或授权委托人: (签字、盖章)邮政编码:014030 电 话:0472-3158936 传 真:0472-3158953 开户银行名称:中国农业银行青山支行开户行地址:包头市青山区科学路银行帐号:608101040016638电 话:3318533 日 期:2014年6月26日2、 投标书附录 投标书附录招标人的名称和地址: 北方联合电力有限责任公司包头第二热电厂 地址内蒙古包头市青山区厂前路 投标人的名称和地址: 内蒙古世龙股份有限公司 地址包头市青山区科学路 发出开工通知的时间: 双方合同约定 竣工的时间为 107 天(日历天数)进入现场的时间:发出开工通知后的 3 天履约保证金的

39、数额:合同价格的 1.5 %提交进度计划的时间:合同生效日期后 5 天工程的误期损害赔偿:合同中约定工程误期损害赔偿费的限额:合同中约定质保金为合同价格的 5 %工程保险金额:合同中约定第三方保险金额:合同中约定投标人:内蒙古世龙股份有限公司 中冶东方工程技术有限公司 北京国电智深控制技术有限公司 (盖章)法定代表人(授权委托人)签字: 2014年6月26日3、开标一览表开标一览表 投标人内蒙古世龙股份有限公司中冶东方工程技术有限公司北京国电智深控制技术有限公司地 址包头市青山区幸福路5#街坊法定代表人胡逢斌企业性质股份有限公司企业等级机电设备安装贰级投标项目包头第二热电厂#4机组烟气脱硫旁路

40、拆除改造项目 承包范围吸收塔入口烟道增设两级事故喷淋系统,一级为通过事故喷淋水泵进行喷淋降温,二级为消防水直接进行事故喷淋降低烟温;塔运行液位设置溢油口2个及相应管道。进入吸收塔的油污溢流排放至事故浆液箱,在将来的运行过程中,逐渐消解污染浆液;范围内相关设备、管道、阀门、测点、仪表等的供货、安装和配电,相关电缆的供货、敷设、接线、仪表管路安装、桥架安装等;本改造工作范围内的设备拆除、安装、调试、试运技术服务等工作; #4机组烟气脱硫旁路拆除改造工程后主机DCS到脱硫DCS的所有逻辑组态调整、系统调试及电缆供货、电缆敷设、接线;以上所述项目脱硫及主机DCS控制系统逻辑设计与操作画面的修改。报 价

41、(元)(大写): (小写): 工 期107天(#1机组20天、#2机组48天、#3机组3天、#4机组36天)质量承诺符合国家验收标准安全承诺零事故、无人身轻伤质保期一年注:1本表要在表头加盖投标人公章及法定代表人印章 2 如本表内容与投标书内容不符,以投标书内容为准。4、法定代表人身份证明书法 定 代 表 人 身 份 证 明 书投标人名称: 内蒙古世龙股份有限公司 地 址: 包头市青山区幸福路5#街坊 姓名: 性别: 男 年龄: 64 职务: 董事长 系 内蒙古世龙股份有限公司 的法定代表人。为施工、竣工和保修的工程,签署上述工程的投标文件、进行合同谈判、签署合同和处理与之有关的一切事务。特此

42、证明。投标人:内蒙古世龙股份有限公司 (盖章)日 期: 2014 年 6 月 26 日附:法定代表人身份证复印件 5、法定代表人授权委托书法 定 代 表 人 授 权 委 托 书本授权委托书声明:我 (姓名)系 内蒙古世龙股份有限公司 (投标人名称)的法定代表人,现授权委托 内蒙古世龙股份有限公司 (单位名称) 的 (姓名)为我公司签署本工程已递交的投标文件的法定代表人授权委托代理人,代理人全权代表我所签署的本工程已递交的投标文件内容及在开标、评标合同谈判过程中所签署的一切文件和处理与之有关的事务,我均予以承认。代理人无转委托权,特此委托。代理人: 王轩 性别: 男 年龄: 28 身份证号码:

43、职务: 项目经理 投 标 人:内蒙古世龙股份有限公司 (盖章)法定代表人: (签字或盖章)授权委托日期: 2014 年 6 月 26 日6、投标保证金投标保证金附件: 附表附表一:总报价表(表格附后)附表二:工程主要管理人员表(表格附后)附表三:近三年完成与本合同相似的业绩情况(表格附后)附表一:总报价表序号项 目 名 称报价(万元)备 注1包头第二热电厂#4机组烟气脱硫旁路拆除拆除改造项目167800923456总 计1678009分项报价表序号名 称报价(元)备注1设计费2施工费3材料价费4事故喷淋系统费5DCS接入费6环保设施费7运输费8技术培训费9其他合计:投标人:内蒙古世龙股份有限公

44、司 中冶东方工程技术有限公司 北京国电智深控制技术有限公司 (盖章)法定代表人或授权代理人:(签字或盖章) 日 期: 2014年6月26日C注:此表请务必装订在投标文件的正、副本中。同时单独密封递交小信封一式三份附表二:工程主要技术人员简历拟投入本工程主要技术人员情况表岗位名称姓名年龄专业职务职称职业资格总工程师工民建工程师高级工程师项目经理市政公用工程项目经理助理工程师二级建造师施工工程师建筑总经理中级工程师一级建造师设计工程师机电工程师工程师二建建造师调试工程师主任工程师工程师计划负责人工程师工程师施工负责人中级施工员安全负责人中级安全员资料负责人资料员材料负责人材料员合同预算员中级土建预算员

展开阅读全文
相关资源
猜你喜欢
相关搜索
资源标签

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号