资源描述

《i道路交通管理设施(声屏障)施工组织设计.doc》由会员分享,可在线阅读,更多相关《i道路交通管理设施(声屏障)施工组织设计.doc(51页珍藏版)》请在三一办公上搜索。

1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this

2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th

3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf

4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o

5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr

6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements

7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and

8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and

9、 rain protection measures. 4. each electrical device must have a machine, a gate, a leak and a box System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a

10、 temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or

11、on scaffolding erected temporary power lines. 6. underground lines must be installed to the flag and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places

12、 such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Ministr

13、y archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to furt

14、her strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance wit

15、h law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system applicat

16、ion of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application i

17、nformation system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employ

18、ees life; strengthening health and labour protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity

19、of Humanities environment. To strengthen risk management, ensure that the business of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-s

20、aving scheduling, national policy trends, strengthening track, active should; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedbac

21、k of closed ring management, improve risk prevention capacity. To further standardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhan

22、ce employee evaluation and levels of effective communication to improve performance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model ro

23、le; to continues to strengthening four good leadership construction, full play levels cadres in enterprise development in the施工组织设计 道路交通管理设施(声屏障)施工组织设计目 录第一章、编制说明11.工程概况12.工程管理目标及违约责任13.工程特点24.工程难点35.编制依据3第二章、主要技术方案和施工方法41.技术方案和施工方法总说明42.声屏障施工测量63.城市声屏障砼基础施工74.农村声屏障砼基础施工135.声屏障制作136.声屏障安装17第三章、施工质量及

24、保证措施221.建立工程质量管理网络体系222.声屏障砼基础质量的技术保证措施223.声屏障制作质量的技术保证措施244.声屏障包装、运输、卸货质量的技术保证措施245.声屏障安装质量的技术保证措施25第四章、安全、文明施工及保证措施261.安全、文明施工管理体系262.安全、文明施工目标263.安全生产保证措施274.文明施工保证措施275.周围构筑物和地下管线的保护措施296.渣土“渣土垃圾”整治措施29第五章 工程总进度计划表及保证措施301.施工进度计划及措施302. 施工进度控制方法303.施工进度计划表304.施工进度保证措施30第六章、施工总体布置及主要施工机械、设备和劳动力32

25、1.现场施工总体安排322.劳动力计划表323.主要施工机械表334.施工总平面布置33第七章、声屏障施工交通组织方案351.交通方案组织原则352.施工占道立面示意图373.施工占道平面布置图38第八章、施工组织管理体系及拟派主要管理人员401.本工程项目管理机构管理网络如下402.拟派项目管理人员40第九章、公司近二年完成道路设施工程业绩错误!未定义书签。4. the persons listed in the temporary electrical permit to work should be consistent with field personnel, when person

26、nel changes should go through the signing procedures and related matters of the transition. 5. in the temporary electrical permit to work is not completed within the stipulated time of electricity operations, ground-breaking of the applicant to apply for temporary power operating license. 6. in the

27、event of relevant meetings, breaks, night work and other special reasons, job ticket must be issued after approval, the request corresponds to staff and other officers will be in place. 7. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. High oper

28、ation management system in the course of work, aimed at reducing high falls, objects to combat such incidents occur, ensure employee safety, regulations are formulated. II, scope of application apply to the company activities and project work scope of construction, but also into our external contrac

29、tors and personnel. Three, responsibilities, company management is working at height safety management departments. D, contents, and request 1, referred to in this system fall at height refers to the height of 2 m above the base level (2 m) fall possible jobs. Working at height is divided into four

30、levels: working at height at an altitude of 2-5 meters, called the high level operations; Height working height of more than 5 meters to 15 meters, as second class at height; Height working height of more than 15 metres to 30 metres, known as the three levels of working at height; Working at height

31、safety management regulations height working height is more than 30 meters, called super high job; Due to work reasons, the company only relates to one, working at height, there is no grade, super high assignment. Once the work above there are three levels of the construction project, in accordance

32、with the provisions of the relevant procedures. 2, where there is one, working at height, of the communication construction safety rules must be strictly adhered to. 3, and all personnel involved in the construction of working at height must be trained and the climbing permits, without training and

33、aerial work permit-free personnel for aerial work is strictly prohibited. 4, and all had high blood pressure, heart disease, anemia, epilepsy is not suitable for working at height and other personnel shall not engage in working at height. 5, high operating personnel must fasten your seat belt, helme

34、t, clothing to flexible, banned the wearing of hard bottom and nails easy slip-on shoes for working at height. 6, seat belts must be hung on the fixed objects, hanging low, must be higher than the waist, prohibited the use of any substitute in place of seat belts. 7, in adjacent areas, with release

35、of toxic, harmful gases and dust outside the allowed concentrations of chimney and equipment is prohibited for working at height. In the allowed range, should also take effective protective measures. In the more than six-level wind and lightning, heavy rain, fog and other adverse weather conditions

36、affect safety during construction,of backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectivenes

37、s monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up

38、the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to fl

39、ourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of ch

40、allenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in the new year, good health, happy, happy别墅设计图纸大全 第一章、编制说明1.工程概

41、况1.1工程名称:外环线噪音治理工程道路交通管理设施(声屏障)1.2工程范围:外环线(某路某路)1.3工程内容:某大道浦发绿地城1段城市大型声屏障加上某和某大道沿线12段农村声屏障,合计13段。城市总长1693米,农村总长3166米。(1)城市段声屏障下部结构形式采用二桩承台(预制钢筋混凝土方桩和承台基础)以及连系梁基础,钢筋混凝土方桩采用250250mm,桩长为8米。承台设置于离公路路沿1.5M处,承台间距2.5M,高出硬路肩2.0M(道路内侧设置CEMCOM吸声板)。连系梁每隔30m1m设置一道缝宽为20mm的伸缩缝,沥青麻丝嵌缝。城市声屏障金属屏体采用泡沫铝板,分设在路侧路基段(间距2.

42、5M)、路中路基段(间距2.5M)和路侧桥基段(间距2.0M)。路侧路基和路侧桥基段声屏障高4.5M,中部有5+0.76+5夹膜玻璃构成的透明隔声屏,作为景观视窗,顶部设置微穿孔吸声半圆柱。路中路基段声屏障高3.5M,间距2.5M,高出硬路肩0.85M(双侧设置CEMCOM吸声板),无景观窗,顶部设置微穿孔吸声圆柱。(2)农村段声屏障下部结构形式连系梁基础,设置于离公路路沿2.0M处,埋件间距2.5M,高出硬路肩0.85M(道路内侧设置“树桩”图案装饰)。连系梁每隔30m1m设置一道缝宽为20mm的伸缩缝,沥青麻丝嵌缝。农村声屏障屏体采用5mmPC耐力板(上部有R1500,30弧度),分设在路

43、侧路基段(间距2.5M)和路侧桥基段(间距2.0M)。2.工程管理目标及违约责任2.1工期目标及违约责任招标文件要求总工期为80日历天,我公司自报总工期为78日历天,计划开工日期 年 9月18日开工,于 年12月4日竣工验收。若由于我方原因造成总工期延误,我方承诺愿以每延误一日历天按合同总造价的20/000执行违约处罚。提交包括竣工结算资料在内的本工程完成的竣工资料,延误违约处罚为每延误一日历天按伍仟圆整(5000元整)执行。2.2工程质量目标及违约责任我公司对本工程的施工质量全面负责,工程质量目标达到“一次验收合格率100%”标准。若达不到“一次验收合格率100%”标准,我方承诺愿按合同总造

44、价的2%向业主支付处罚金。2.3安全生产、文明施工目标及违约责任工程安全、文明施工方面,我公司将按上海市建筑业管理办公室沪建建管(2002)第105号文关于进一步加强文明施工管理的通知及市容监察的要求,加大文明施工,安全达标方面的投入。创建文明工地和安全达标工地,确保施工中无管线事故、无重大伤亡事故,施工现场道路平整无积水。我们在施工组织中要合理做好环境保护的处理措施。对因我公司原因达不到上述要求者,将承担违约责任,并接受按合同总造价的2向业主支付处罚金。2.4施工现场“渣土垃圾”的整治处置及违约责任如我公司有幸中标,我们将积极按上海市政府有关要求,做好对施工过程中渣土和建筑垃圾的规范处置及运

45、输管理工作。加强对施工现场的管理,确保现场“场地清、无渣土垃圾”。如有违反施工现场“渣土垃圾”的有关规定,我公司愿从应得工程款中扣除不少于合同总价的1%作为违约金。3.工程特点3.1本吸声屏工程中吸声材料均选用环保型,并可二次利用的泡沫铝,在雨水及潮湿环境中,不会降低吸声效果(系数)。3.2本吸声屏标段,有布置在路侧的,有布置在路中的,也有布置在桥梁一侧的;路侧、路中的声屏障,要做砼基础,而且还要先打桩,再做承台和连系梁。3.3为保证道路的正常通常,夜间半成品运输及安装施工作业量大。3.4施工的局部区域内,地下有给水,路灯、电力等各种(管径)管线穿越,施工前一定要开挖样洞,一定要保护好各种管线

46、。3.5本声屏障工程,半成品的加工白天在工厂进行,运输在夜间进行,施工作业中,桥梁上安排在夜间进行,路侧及路中在不影响交通的前提下,可以安排在白天(或夜间)进行,一天24小时都得到了充分的利用,能不说是本工程的特点吗。4.工程难点4.1工程总量大、布置点分散、施工作业面广,施工难度大。4.2施工期间要保持道路正常通行,要求当天(白天、夜间)计划工作,一定要当天完成运输、安装施工,协调、管理要求水平高。4.3除了桥梁段外,路侧、路中的声屏障要先打桩、后做承台连系梁,再安各类屏(体),工序多,施工总日历天数只有78天,时间紧。4.4声屏障的安装,均为露天作业,受气候变化影响大。4.5夜间施工作业量

47、大,又不能影响居民的正常生活,又要控制噪声和光污染,环境保护要求高。4.6施工局部区域内,地下有给水、路灯、电力等各种管线,施工前要挖样洞,一定不能损坏各种管线,保护好各种管线应列为难点、重点。4.7当天计划工作量,当天完成,并做到工完料尽、场地清(地面及周围无垃圾),困难度不小。4.8总包负责解决施工用水、用电。对于众多的作业面而言。如何保证用水用电、安全用水用电,这对于我们的(施工)水平是一个严峻的考验。4.9作业面广,施工(管理)人员流动性大,如何解决食、宿、用厕、洗澡等民生必须,不能看成是小问题。4.10桥梁上施工时,如何做好安全保护和防护,做到安全生产、万无一失,也是本工程难点之一。

48、5.编制依据5.1外环线噪音治理工程一标工程施工招标文件及设计施工图纸;5.2外环线噪音治理工程一标工程施工答疑及补充招标文件;5.3本工程现场踏勘相关资料;5.4国家、上海市和行业的施工技术规范和标准;5.5本公司的企业标准和施工实践经验。第二章、主要技术方案和施工方法1.技术方案和施工方法总说明1.1主要技术方案(1)分段编制详细的(土建)施工技术方案(如有打桩的承台连系梁、无打桩的承台连系梁、为避让管线的打桩承台连系梁;路基路侧、路基路中、路基路侧与路基桥梁延伸处、直线交角处等,都要有针对性的方案说清楚、图示表达清楚、作业段标注清楚、施工工艺编制清楚)。(2)按声屏障各种半成品组件,分别编制(加工、包装、运输)技术方案(如H钢立柱加工、泡沫铝板吸声屏加工、夹膜玻璃隔声屏加工、半圆柱(圆柱)吸声体加工、PC板隔声屏加工、CEMCOM吸声板加工等,都要有诸如原材料的采购把关,加工工艺的制定、加工进度的安排,半成品的质量检验、运输前的安全包装及运输中的防挤压及碰撞等)。(3)编制“加工样板”制技术方案(按照路侧路基、路侧桥基段4.5M