1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the施工组织设计 道路交通管理设施(声屏障)施工组织设计目 录第一章、编制说明11.工程概况12.工程管理目标及违约责任13.工程特点24.工程难点35.编制依据3第二章、主要技术方案和施工方法41.技术方案和施工方法总说明42.声屏障施工测量63.城市声屏障砼基础施工74.农村声屏障砼基础施工135.声屏障制作136.声屏障安装17第三章、施工质量及保证措施221.建立工程质量管理网络体系222.声屏障砼基础质量的技术保证措施223.声屏障制作质量的技术保证措施244.声屏障包装、运输、卸货质量的技术保证措施245.声
22、屏障安装质量的技术保证措施25第四章、安全、文明施工及保证措施261.安全、文明施工管理体系262.安全、文明施工目标263.安全生产保证措施274.文明施工保证措施275.周围构筑物和地下管线的保护措施296.渣土“渣土垃圾”整治措施29第五章 工程总进度计划表及保证措施301.施工进度计划及措施302. 施工进度控制方法303.施工进度计划表304.施工进度保证措施30第六章、施工总体布置及主要施工机械、设备和劳动力321.现场施工总体安排322.劳动力计划表323.主要施工机械表334.施工总平面布置33第七章、声屏障施工交通组织方案351.交通方案组织原则352.施工占道立面示意图37
23、3.施工占道平面布置图38第八章、施工组织管理体系及拟派主要管理人员401.本工程项目管理机构管理网络如下402.拟派项目管理人员40第九章、公司近二年完成道路设施工程业绩错误!未定义书签。recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction was
24、te someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and constru
25、ction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis.
26、4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the developm
27、ent of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site mu
28、st be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspect
29、ion score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution p
30、revention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction
31、site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction roa
32、d, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal
33、 life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialof backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force role; to improve independent Commission against corruption work level,
34、strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish and improve the education, supervision, and evaluation as one of the tr
35、affic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on December 24, the ox Bell is about to ring, at this time of year, we cl
36、early feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of confidence. Future development opportunities, we more exciting fight mor
37、e spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Spring Festival, my sincere wish that you and the families of the staff in
38、the new year, good health, happy, happy别墅设计图纸大全 第一章、编制说明1.工程概况1.1工程名称:外环线噪音治理工程道路交通管理设施(声屏障)1.2工程范围:外环线(某路某路)1.3工程内容:某大道浦发绿地城1段城市大型声屏障加上某和某大道沿线12段农村声屏障,合计13段。城市总长1693米,农村总长3166米。(1)城市段声屏障下部结构形式采用二桩承台(预制钢筋混凝土方桩和承台基础)以及连系梁基础,钢筋混凝土方桩采用250250mm,桩长为8米。承台设置于离公路路沿1.5M处,承台间距2.5M,高出硬路肩2.0M(道路内侧设置CEMCOM吸声板)。连
39、系梁每隔30m1m设置一道缝宽为20mm的伸缩缝,沥青麻丝嵌缝。城市声屏障金属屏体采用泡沫铝板,分设在路侧路基段(间距2.5M)、路中路基段(间距2.5M)和路侧桥基段(间距2.0M)。路侧路基和路侧桥基段声屏障高4.5M,中部有5+0.76+5夹膜玻璃构成的透明隔声屏,作为景观视窗,顶部设置微穿孔吸声半圆柱。路中路基段声屏障高3.5M,间距2.5M,高出硬路肩0.85M(双侧设置CEMCOM吸声板),无景观窗,顶部设置微穿孔吸声圆柱。(2)农村段声屏障下部结构形式连系梁基础,设置于离公路路沿2.0M处,埋件间距2.5M,高出硬路肩0.85M(道路内侧设置“树桩”图案装饰)。连系梁每隔30m1
40、m设置一道缝宽为20mm的伸缩缝,沥青麻丝嵌缝。农村声屏障屏体采用5mmPC耐力板(上部有R1500,30弧度),分设在路侧路基段(间距2.5M)和路侧桥基段(间距2.0M)。2.工程管理目标及违约责任2.1工期目标及违约责任招标文件要求总工期为80日历天,我公司自报总工期为78日历天,计划开工日期 年 9月18日开工,于 年12月4日竣工验收。若由于我方原因造成总工期延误,我方承诺愿以每延误一日历天按合同总造价的20/000执行违约处罚。提交包括竣工结算资料在内的本工程完成的竣工资料,延误违约处罚为每延误一日历天按伍仟圆整(5000元整)执行。2.2工程质量目标及违约责任我公司对本工程的施工
41、质量全面负责,工程质量目标达到“一次验收合格率100%”标准。若达不到“一次验收合格率100%”标准,我方承诺愿按合同总造价的2%向业主支付处罚金。2.3安全生产、文明施工目标及违约责任工程安全、文明施工方面,我公司将按上海市建筑业管理办公室沪建建管(2002)第105号文关于进一步加强文明施工管理的通知及市容监察的要求,加大文明施工,安全达标方面的投入。创建文明工地和安全达标工地,确保施工中无管线事故、无重大伤亡事故,施工现场道路平整无积水。我们在施工组织中要合理做好环境保护的处理措施。对因我公司原因达不到上述要求者,将承担违约责任,并接受按合同总造价的2向业主支付处罚金。2.4施工现场“渣
42、土垃圾”的整治处置及违约责任如我公司有幸中标,我们将积极按上海市政府有关要求,做好对施工过程中渣土和建筑垃圾的规范处置及运输管理工作。加强对施工现场的管理,确保现场“场地清、无渣土垃圾”。如有违反施工现场“渣土垃圾”的有关规定,我公司愿从应得工程款中扣除不少于合同总价的1%作为违约金。3.工程特点3.1本吸声屏工程中吸声材料均选用环保型,并可二次利用的泡沫铝,在雨水及潮湿环境中,不会降低吸声效果(系数)。3.2本吸声屏标段,有布置在路侧的,有布置在路中的,也有布置在桥梁一侧的;路侧、路中的声屏障,要做砼基础,而且还要先打桩,再做承台和连系梁。3.3为保证道路的正常通常,夜间半成品运输及安装施工
43、作业量大。3.4施工的局部区域内,地下有给水,路灯、电力等各种(管径)管线穿越,施工前一定要开挖样洞,一定要保护好各种管线。3.5本声屏障工程,半成品的加工白天在工厂进行,运输在夜间进行,施工作业中,桥梁上安排在夜间进行,路侧及路中在不影响交通的前提下,可以安排在白天(或夜间)进行,一天24小时都得到了充分的利用,能不说是本工程的特点吗。4.工程难点4.1工程总量大、布置点分散、施工作业面广,施工难度大。4.2施工期间要保持道路正常通行,要求当天(白天、夜间)计划工作,一定要当天完成运输、安装施工,协调、管理要求水平高。4.3除了桥梁段外,路侧、路中的声屏障要先打桩、后做承台连系梁,再安各类屏
44、(体),工序多,施工总日历天数只有78天,时间紧。4.4声屏障的安装,均为露天作业,受气候变化影响大。4.5夜间施工作业量大,又不能影响居民的正常生活,又要控制噪声和光污染,环境保护要求高。4.6施工局部区域内,地下有给水、路灯、电力等各种管线,施工前要挖样洞,一定不能损坏各种管线,保护好各种管线应列为难点、重点。4.7当天计划工作量,当天完成,并做到工完料尽、场地清(地面及周围无垃圾),困难度不小。4.8总包负责解决施工用水、用电。对于众多的作业面而言。如何保证用水用电、安全用水用电,这对于我们的(施工)水平是一个严峻的考验。4.9作业面广,施工(管理)人员流动性大,如何解决食、宿、用厕、洗
45、澡等民生必须,不能看成是小问题。4.10桥梁上施工时,如何做好安全保护和防护,做到安全生产、万无一失,也是本工程难点之一。5.编制依据5.1外环线噪音治理工程一标工程施工招标文件及设计施工图纸;5.2外环线噪音治理工程一标工程施工答疑及补充招标文件;5.3本工程现场踏勘相关资料;5.4国家、上海市和行业的施工技术规范和标准;5.5本公司的企业标准和施工实践经验。第二章、主要技术方案和施工方法1.技术方案和施工方法总说明1.1主要技术方案(1)分段编制详细的(土建)施工技术方案(如有打桩的承台连系梁、无打桩的承台连系梁、为避让管线的打桩承台连系梁;路基路侧、路基路中、路基路侧与路基桥梁延伸处、直
46、线交角处等,都要有针对性的方案说清楚、图示表达清楚、作业段标注清楚、施工工艺编制清楚)。(2)按声屏障各种半成品组件,分别编制(加工、包装、运输)技术方案(如H钢立柱加工、泡沫铝板吸声屏加工、夹膜玻璃隔声屏加工、半圆柱(圆柱)吸声体加工、PC板隔声屏加工、CEMCOM吸声板加工等,都要有诸如原材料的采购把关,加工工艺的制定、加工进度的安排,半成品的质量检验、运输前的安全包装及运输中的防挤压及碰撞等)。(3)编制“加工样板”制技术方案(按照路侧路基、路侧桥基段4.5M高泡沫铝声屏障、路中路基段3.5M高泡沫铝声屏障、路侧路基、桥基段3.6M高PC板吸声屏障等不同组合,批量生产前,先加工好样板,在
47、加工厂组装成型,待业主、监理、设计共同评头论足后,再进行批量生产)。(4)针对桥梁防撞墩上骑马凳的加工,专门编制(加工)技术方案(因不清楚防撞墩上纵向主钢筋的绑扎位置,所以不能简单的按施工图的图示加工骑马凳,而是先要在防撞墩上试钻孔,探明了纵向主钢筋位置后,按现场的实际情况,画制骑马凳的加工图;主要是孔的间距,当然也会涉及前后夹板的尺寸的修正;在得到现场监理和设计人员的认可和确认后,方可批量加工)。(5)分段编制流水作业(施工)技术方案(如某安装段,何时将半成品运到现场,可以在白天运输到位吗一般是安排在夜间;原则上桥梁段夜间运输、夜间安装作业时间段应征得交警部门的事先批准同意;路基路侧安排夜间
48、运输,白天安装;路基路中安装视现场情况,在事先征得交警部门批准同意后,可在白天安装,但原则上应安排在夜间施工)。1.2声屏障砼基础施工方法某大道浦发绿地城1段城市大型声屏障,下部结构形式采用预制钢筋方桩和承台基础以及连系梁基础,路基段路侧处和路基段中处桩承台,钢筋混凝土方桩采用250250mm,长度为8米,某和某大道沿线12段农村段声屏障下部结构形式为连系梁基础。(1)混凝土全部采用商品混凝土,泵车泵送。(2)基础柱头采用定制拼装式钢模板,按清水混凝土的工艺标准验收模板的垂直度和拼接缝。考虑到本工程的承台高度较低,混凝土施工时一次浇筑到顶,承台的混凝土采用商品砼,配备混凝土汽车泵进行浇筑。(3)连系梁底模采用黄砂垫层,C10素砼垫层,侧模采用定制的九夹板模板;如地面未达到设计标高时,应采用耕植土回填,并且夯实,连系梁地基应夯实,然后再进行连系梁底模和侧模的安装。(4)钢筋混凝土预制方桩采用厂家生产,现场履带吊吊装,打入桩采用柴油打桩机的施工方法(为避免噪声也可以改为静力压桩的施工方法)。