英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc

上传人:仙人指路1688 文档编号:3882820 上传时间:2023-03-26 格式:DOC 页数:255 大小:5.45MB
返回 下载 相关 举报
英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc_第1页
第1页 / 共255页
英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc_第2页
第2页 / 共255页
英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc_第3页
第3页 / 共255页
英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc_第4页
第4页 / 共255页
英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc_第5页
第5页 / 共255页
点击查看更多>>
资源描述

《英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc》由会员分享,可在线阅读,更多相关《英文版DL T 50541996 火力发电厂汽水管道设计技术规定.doc(255页珍藏版)》请在三一办公上搜索。

1、Professional Standard of the Popeples Republic of ChinaDL/T 5054-1996Technical Specification for the Steam/Water Piping Design of Fossil Fuel Power Plant火力发电厂汽水管道设计技术规定Notice on the issuing of power industry standard Electric Power Industry of People Republic of ChinaDian Ji 1996 No.340After inspect

2、ion and approval, Technical Specification for the Steam/WaterPiping Design of Fossils Fuel Power Plant is approved to be a reference specification and is hereby issued. The standard code is: DL/T 5054-1996This standard shall be implemented from October 1, 1996.Please notify the Ministry of Electric

3、Industry, Electric Power Planning and Design General Institution of the problems and suggestions during the specifications implementation, also a copy of it shall be sent to the office of ministry standardization leading group.This standard is under the charge of China Water Power Press to publish.U

4、nit and meaning of the frequently used symbols:SymbolUnitMeaningPMPadesigned pressurePNMPanominative pressurePTMPatest pressurePdPa, MPadynamical pressure of the media inside the pipePd1Pa, MPadynamical pressure at the initial end of the pipePd2Pa, MPadynamical pressure of the pipe endPOPa, MPastagn

5、ation pressure at the initial end of the pipeP1Pa, MPapressure at the initial end of the pipeP2Pa, MPapressure of the pipe endPCPa, MPacritical pressure of the media inside the pipePdPa, MPacritical dynamical pressure of the media inside the pipe-ratio of the pressure at the initial end of the pipe

6、and the pressure at the end of the spacec-ratio of the pressure at the initial end of the pipe and the critical pressuretdesign temperature or working temperatureterdesign installation temperatureb20MPaminimal tensile strength of the steel products at 20 3MPaminimal yield limit of the steel products

7、 at design temperaturet3 (0.2%)MPaminimal yield limit when the steel products residual deformation is 0.2% at design temperaturetDMPa100, 000 h average endurable strength of the steel materials at design temperatureTMPasafe allowable stress of the steel products at design temperature-safe allowable

8、stress compensation factorDNmminside nominal diameterDOmmpipe external diameterDimminternal pipe sizesmmmminimal straight pipe wall thicknessSCmmcalculated wall thickness of the straight pipeSmmwall thickness of the straight pipeA-negative deviation coefficient of the pipe thicknessGt/hmedia mass fl

9、owGmaxt/hmedia maximal mass flowGmint/hmedia minimal mass flowQm3/hmedia volumetric flowvm3/kgmedia specific volumev0m3/kgpipeline initial end stagnation specific volumev1m3/kgmedia specific volumeat the pipe initialv2m3/kgmedia specific volume at the pipe terminalvm3/kgmedia critical specific volum

10、e-media specific volume ratio at the pipe terminal and initial end0-ratio of media critical specific volume and pipeline initial media specific volumekg/m3media density1kg/m3media density at the pipeline initial2kg/m3media density at the pipe terminalwm/smedia flow velocitymkg/(m2s)media mass veloci

11、tyw0m/smedia critical velocitym0kg/(m2s)media critical mass flow velocityLmoverall pipeline stretched length-pipeline friction coefficientR-Reynolds number-resistance coefficient of pipeline+ 1-pipelines general coefficient of local resistancee-pipe equivalent roughnessgm/s2acceleration of gravityk-

12、steam adiabatic exponenta-media mass flow velocity ratio before and after the local changes of the pipelineH1mheight mark of the pipe initial endH2mheight mark of the pipe terminal endPatPaatmospheric PressurePopNworking load of the springPNinstallation load of the springPmaxNmaximal allowable load

13、of the springmaxmmmaximal allowable distortion of the springHopmmspring working heightHetmmspring fitting heightH0mmspring free heightZtmmthermal walking value of the pipes supports and hangers along the vertical directionKmm/Nspring coefficient-friction coefficientLmaxmmaximal allowable spacing of

14、the supporter and hangerIcm4pipe section moment of inertiaqkN/mself weight of the pipeline per unit lengthE20kN/mm2elastic modulus of the steel products at 20EtkN/mm2elastic modulus of the steel products under design temperaturet10-6/linear expansibility of steel products at working temperatureMPash

15、ear StressHfmmweld heighthummeffective throat thicknessXmmaxial displacement absorbed by the expansion jointYmmtransversal displacement absorbed by the expansion jointX0mmmaximal compensation quantity of the hose balance by the expansion jointY0mmmaximal compensation quantity of the transverse balan

16、ce by the expansion joint1. General Provisions1.0.1 The purpose of this specification is to direct the design of the water/steam pipeline of fossil fuel power plant to ensure a secure, full-load, and economical operation.1.0.2 This specification is suitable for the steam/water piping design in the f

17、ossil fuel power plant with the unit main steam parameter as 27MPa, 550 (high temperature and reheated steam can be as high as 565) or below.The steam/water piping design within the generating units and the furnace shall not only comply with this specification, but also needs to be determined after

18、being negotiated with the manufacturer.The heating network pipe and the pipe for transferring oil and air inside the power plant can refer to this specification.This specification is not suitable for the designs of fuel pipeline, fuel gas pipeline, hydrogen gas pipeline and underground straight buri

19、ed pipe.1.0.3 Related standards quoted by this specification:Nominal diameter of the pipeline parts (3131047)Nominal pressure of the pipeline parts (3131048)Seamless steel pipe shall be used for high-pressure boiler (385310)For low- and media-pressure boiler, seamless steel pipe is used (GB3087)Carb

20、on construction steel (313700)Spiral welded steel pipe (SY50365039)Low-pressure stream conveyance with welding steel pipe (3133092)Steel pressure vessel (GB150)Carbon steel covered electrode (GB5117)Low alloy structural steel (GB5118)Technical specifications on pipeline stress calculation of fossil

21、fuel power plant (SDGJ6)Electric power construction and technical specification for the acceptance (pipeline section) (DJ56)Electric power construction and technical specification for the acceptance(Welding in fossil fuel power plant) (DL5007)Electric power construction and technical specification f

22、or the acceptance(Radio examination of the steel load-bearing pipeline butt-jointed seams) (SD143)Metallic technical supervision specification of the fossil fuel power plant (DLA38)Supervision code for boiler of power industry (SDl67)2 General policy conditions2.0.1 Design specificationsPiping desig

23、n shall be carried out according to the thermodynamic system and setup. It requires good material sources, proper setup, good indemnification, smooth drainage, smaller flow resistance, low construction cost, appropriate hanger and support, convenient installation as well as maintenance, flexible ext

24、ension, and shall be tidy and nice in appearance. Hydraulic impact and resonance shall be avoided, and noise shall be reduced.Piping design shall comply with related standards and specifications of the state and the ministry.2.0.2 Design parameter2.0.2.1 Design pressurePiping design pressure (gauge

25、pressure) refers to the maximal working pressure of the interior media in service. For the utility of water pipe and design pressure, the influence of water columns static pressure shall be considered; when the pressure is lower than 3% of the nominal pressure, it will not be considered.The design p

26、ressure of the main pipe is applicable in the following specifications:(1) Main steam lineNominal working pressure at the boiler super-heater exit or working pressure at the maximum-continuous evaporative capacity of boiler shall be taken.When the boiler and steam turbine permits the pressure to be

27、5% greater (5% OP for short), 5% overpressure value shall be added.(2) Reheat steam pipelineThe pressure shall be 1.15 times of the pressure cylinder exhaust pressure under steam turbines maximal design capacity operating condition (see note). Pressure of the high temperature reheat pipe can be redu

28、ced to the undermost set-pressure of the safety valve at the re-heater outlet. Note: maximal design capacity operating condition of the steam turbine refers to the valve widely open condition (VWO for short) or valve widely open condition + 5% overpressure (VWO+5%OP for short) condition. (3) Steam t

29、urbines extraction lineNon-regulated extraction lines pressure shall be 1.1 times of the extraction pressure of the steam turbine at maximal design capacity condition, which shall be no lower than 0.1MPa:Regulated extraction line will use its maximum operating pressure.(4) Blow-down line of the back

30、pressure steam turbineIts maximum operating pressure shall be adopted.(5) Steam pipe behind the relieverThe maximum operating pressure shall be adopted.(6) Steam water pipeline connected to the monopipe boiler starting vesselThe maximum possible operating pressure in all kinds of segregator operatin

31、g conditions shall be adopted.(7) High pressure feed water pipelineFor non-variable speed feed water pump outlet pipe, from fore pump to main feed pump or from the main feed pump to boiler economizer entrance, pressures for each shall take the sum of the summit value of the performance curve with fo

32、re pump or main feed pump and the pumps water inlet side pressure respectively;As for variable speed feed water pump outlet pipe, from the feed pump outlet to the stop valve, the design pressure shall take the sum of the rated speed performance curve summit value and the water inlet side pressure; F

33、rom stop valve at the pump outlet to entrance of the boiler economizer, the pressure shall take the sum of the pump water inlet side pressure and 1.1 times of pump popping pressure at the pumps rated speed and design flow. (8)Above high pressure feed water pipeline pressure shall consider the amendm

34、ent on pressure made by water pump inlet temperature.For the constant-voltage deoxidizing system, the sum of the desecrator rated pressure and the water column static pressure at the maximum water level shall be adopted.For sliding pressure operation of deaerator, the sum of 1.1 times of the heated

35、deaerator extraction pressure at steam turbines maximal design capacity condition and the water column static pressure at the deaerators maximal water level shall be taken. (9) Condensate pipeFor pipeline at the inlet side of the condensate pump, the water column static pressure (by this time, the p

36、ressure inside the condenser shall be taken as the air pressure) from the pump inlet center line to the turbine exhaust casings interface section and it shall be no lower than 0.35mpa;For the bypath at the outlet of the single stage pump and system pump, the pressure shall take the sum of the pump l

37、ift when the outlet valve is closed and the water inlet side pressure (the aforesaid water column static pressure); The pipeline at the condensate pumps outlet side of the two-stage pump system shall adopt the same pressure as that of the corresponding single stage pump system.The pipeline at the co

38、ndensate booster pump outlet side of the two-stage pump system shall adopt the sum of the pump lifts of two pumps (condensate pump and condensate booster pump) when the outlet is shut down.(10) Heaters drainage pipeIt shall be 1.1 times of the extraction pressure under the steam turbines maximal des

39、ign capacity operating condition and shall be no lower than 0.1MPa. When the drainage static pressure inside the pipeline triggers the pressure lifting and makes it larger than 3% of the extraction pressure, the influence of the static pressure shall be taken into account. (11) Boiler water blow-dow

40、n pipelineBefore the boiler blow-down valve or when the pipeline after the blow-down valve is equipped with valve or closure plate that can elevate the pipe internal pressure, the design pressure for the periodic blow-down pipeline shall be no smaller than the sum of the undermost set-pressure of al

41、l the safety valves on the steam drum and the water column static pressure from the steam drums maximum water level to the pipe coupling points; as for the continuous blow-down pipeline, the design pressure shall be no lower than the undermost set-pressure of all the safety valves on the steam drum.

42、 If the pipe internal pressure will not go up after the boiler blow down valve, the design pressure of the blow-down line (periodic blow-down or continuous blow-down) shall be selected from Table 2.0.2-1.Table 2.0.2-1: The piping design pressure after the boiler blow-down valve MPa (g)Boiler pressur

43、e1.7504.150 4.1516.2006.20110.30010.301Piping design pressure1.7502.7504.1506.200(12) Feedwater recirculation lineWhen the unit system is taken, the last stop valve entering the deaerator and the previous pipeline shall take the design pressure of corresponding high pressure feed water pipe; for pip

44、eline after the stop valve, the constant voltage deoxidizing system shall take the rated pressure of the deaerator; for the sliding pressure operation of deaerator, the design pressure shall be 1.1 times of the deaerators heat-up extraction pressure at the maximal design capacity operating condition

45、 of the steam turbine.When the piping-main scheme system is adopted, the restriction orifice and its previous pipeline shall adopt the design pressure of corresponding high pressure feed water pipe; for pipeline after the restriction orifice, when no valve is installed or valve on the media double o

46、utlets cannot be closed at the same time, the deaerators rated pressure shall be adopted.(13)Exhaust pipe after the safety valveIt shall be determined according to the hydraulic calculation result of the blow-down pipe.2.0.2.2 Design temperatureIt refers to the maximal working temperature of the med

47、ia inside the pipe.The design temperature for the main pipe shall be selected according to the following specifications:(1) Main steam lineIt shall take the steams rated working temperature at the outlet of the boiler superheater plus the allowable temperature deviation during the boilers normal operation. Suggested temperature deviation is 5.(2) Reheat steam pipelineHigh temperature reheat pipe shall take the steam rated working te

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 办公文档 > 其他范文


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号