1、热学知识点补充专题练习题及其答案0nmol,0.1001.一直径2r=100mm的直立的圆筒形容器,内装(即室温)、的TC,20.00气体,筒的上盖是可自由上下移动、质量m=800g的玻璃板,圆筒(包括上盖和筒底),7的热导率和热容量很小,一束功率固定的激光器发射的光无吸收地穿,,5.1410m过空气和玻璃板照入筒内,被筒内气体完全吸收并转化为热运动,照射t=10s后关掉激光器,测得玻璃板位移h,30.0mm。求:(l)辐射后空气的温度和压强;(2)气体吸收的辐射能、气体吸收的辐射功率及单位时间内吸收的光子数;(3)光能转化为机械势0能的效率;(4)让圆筒缓慢地旋转90后成水平方向,气体的温度
2、和压强, 已知大气压强P=101 .3 kPa,气体定容摩尔热容 CJmolK,20.8/0,2. 一质量为m的平薄长方形匀质玻璃板,用两根等长细线悬挂起来,如图3所示,玻璃板每一侧面的半个表面对称地涂了一层化学性质活泼的金属薄膜,其质量可忽略不计,整个装置竖直地悬挂在空的容器中,并向容器通入压强为p的氯气,设某一氯气分子遇金属分子发生化合反应的概率q1,且在讨论的时间范围内q为恒量,生成的氯化物留在玻璃板上,整个装置中的线量均已在涂中标出,平衡时玻璃板将绕它的中央竖直轴转过一个小角度,试求这值. 金属薄膜 2a b a a b c b b 金属薄膜 图3 of door and window
3、 boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor dec
4、oration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical dev
5、iation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning mater
6、ials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with ceme
7、nt mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge of door
8、 and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and
9、outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and v
10、ertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cle
11、aning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, firs
12、t with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to we
13、dge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the
14、indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elev
15、ation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materi
16、als and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than
17、 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole
18、place to wedge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the
19、end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom t
20、o top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sea
21、ling materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is g
22、reater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mou
23、nting hole place to wedge mg51、解:(l)辐射后气体的压强: PPPa,,,,1.02321002,r这是等压过程,开始气体占有容器高度h; 1nRTV01 ,h122,,rrPmg0辐照后 hhh,,,212(),rPmgh,,hhh,,001 TTTTTKC,,,,,3224920000hhnR11(2)气体吸收的辐射能Q: 2, WmghPrhJ,24.1,,,0hh,2 EnCTTnCTCmgPr()(),,,2000hR1C2,QEWmgPrhJ()(1)84,,,,, 0R因为激光器功率恒定,因此吸收光的功率为 QNW,8.4 ,thcN19,,2.2
24、10/s光子能量为,单位时间气体吸收的光子数 hc,(3)光能转化为机械势能的效率: mgh,0.3% ,Q(4)圆筒转向水平方向是绝热过程(压强由P变为P,温度由T变为T,因为 023CRp,,,11.399 aCC,a,1P00a,()32148TTKC 32Pof door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be co
25、nducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control line. Exterior
26、door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum window has no dam
27、age, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the location of th
28、e doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thickness is grea
29、ter than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge 2、 of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would pr
30、eferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window level control l
31、ine. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, aluminum win
32、dow has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation according to the
33、location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough. If the thi
34、ckness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window fram
35、es would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and window leve
36、l control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and planting method, a
37、luminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installation accord
38、ing to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surface is rough.
39、 If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and
40、window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, as door and
41、window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location and plantin
42、g method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window frame installa
43、tion according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and the surfac
44、e is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation o
45、f door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at the end of the indoor and outdoor decoration, so as to avoid civil installation damage to each other. Popup +500mm elevations in advance, a
46、s door and window level control line. Exterior door and window installation will pop up on the walls a uniform elevation control line and vertical line from bottom to top, elevation and vertical deviation is controlled with doors and Windows. Check the embedded specification of the number, location
47、and planting method, aluminum window has no damage, deformation, repair, correction or replacement should be carried out promptly. Check for corrosion materials, sealing materials and cleaning materials with the design requirements and specifications. 2, installation procedure 1) door and window fra
48、me installation according to the location of the doors and Windows installed wire, when doors and Windows opening to the edge of the door and window frames size is greater than 15mm, first with cement mortar plastering the wall size on all sides from the door and window frames edge 15mm position and
49、 the surface is rough. If the thickness is greater than 30mm, should be of fine stone concrete formwork for concrete pouring. After the base strength. Door frame mounting hole place to wedge of door and window boxes, the jambs set aside in advance to check geometry meets the design requirements. Installation of door and window frames would preferably be conducted upon completion of the construction of the main structure, door and window door installation should be at t