《p港湾大道软基处理劈裂注浆强夯块石墩堆载预压换填块石排水箱涵搅拌桩施工方案secret.doc》由会员分享,可在线阅读,更多相关《p港湾大道软基处理劈裂注浆强夯块石墩堆载预压换填块石排水箱涵搅拌桩施工方案secret.doc(20页珍藏版)》请在三一办公上搜索。
1、securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic substances must be sealed, and fire equipment; When tr
2、ansporting material, watch out for falling hurts, is strictly prohibited in the construction close to Fireworks, meanwhile, had to carry fire-fighting equipment; When the operator, such as headache, nausea, and should cease operations. With materials stimulate the allergic persons, shall participate
3、 in the work; Side facing the House working at height, 1.2m and high fences, and hang buckles seat belt; Targeted security gives the low-down on construction site; Others. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams . Eight, provided by the General
4、 machinery and equipment, scaffolding and other facilities, erection, installation is completed before delivery, the total package in conjunction with the acceptance of relevant subcontracted the construction units work in accordance with the regulations, and prepare written procedures for acceptanc
5、e and delivery, is strictly prohibited in the case of unqualified acceptance or acceptance into use. Nine, all subcontractors and General units such as the mutual borrowing or rental equipment and tools you need, there should be both relevant personnel of borrowing or leasing procedures, develop saf
6、e use and management systems. Lending unit should ensure the loaned equipment and tools in good condition and in accordance with the requirements, borrowing unit must be checked and written handover records. Ten, the sub-contractor for scaffolding, construction site facilities, equipment safety prot
7、ection facilities, safety signs and warning signs may be supplemented, removed, changed. If needed change, must be approved by the head of construction and safety managers agreed, and to take the necessary and reliable security measures can only be removed. Plenary and small mechanical operations, s
8、pecial operations and personnel, required training, after passing the examination by the relevant departments, with valid ID posts. Hoisting personnel must abide by hanging ten rule, strictly illegal, unlicensed operation; staff know nothing about electrical and mechanical equipment is strictly proh
9、ibited and unauthorized operations use electric appliances, machinery and equipment. 12, the subcontractor must strictly implement the system of fire prevention and explosion protection, flammable and explosive places non-smoking and the use of open flames, fire-fighting equipment are not allowed to
10、 divert it. Welding and gas cutting operation shall follow the provisions of fire approval procedures, strict compliance with the ten does not burn provisions, prohibited the use of furnaces. Construction such as open flame heating measures must be used, you should obtain the consent of General fire
11、network, broadcasting, television, newspapers, books, lectures, forums, reports, seminars, etc. False debate central policies, the destruction of the partys centralized and unified depending on the circumstances be punished. Also is to say, in the specific channel and field of arbitrary: Contrary to
12、 the spirit of the central governments remarks, is false debate central, which belongs to the discipline behavior regulations, provisions of this article and the partys democratic centralism is not contrary. Because the Party Central Committee in the development of major principles and policies, thr
13、ough different channels and ways, fully listen to the party organizations and party opinions and suggestions, which in itself is to carry forward the democracy within the party Performance. This article in the important documents of the party and the leadership of the speech is a source. Such as Com
14、rade Mao Zedong in in an article, he had cited the various manifestations of liberalism, which clearly pointed out that the the person does not say, gossip behind peoples backs meeting, after the blather is behind the irresponsible criticism ,It should be opposed. The original of the relevant provis
15、ions of this is also involved, but did not clearly put forward, this is to make it clear.thrift of excellent traditional and style lack deep of understanding, one-sided think in now of good situation Xia, economic smooth more fast development, and reform made major progress, and people living signif
16、icantly improve, and social the career made new progress, no necessary always hard has, no awareness to China also has many poverty area, and also has many poverty population of exists, more living improve has, more need keep hard of style. Three is not strictly honest. Total thought units is a wate
17、r sector, clean self-discipline away from himself too far, no real processing good living of improve and hard, and thrift excellent traditional of relationship, no effective do comply with Constitution and party of regulations must from I do up, no right mercy good bitter Le, and wealth of relations
18、hip, no right awareness to in comply with Constitution and party of regulations aspects everyone has accountability. Four, future direction and improvement measures 1, belief and faith, strengthen party spirit. One is to firmly establish the noble ideals of struggle for the ideals of communism, comm
19、unist struggle for life, ready to sacrifice everything for the party and the people. Second is to continuously improve the quality and standard of political, conscientiously study Deng Xiaoping theory and three represents important thought and the scientific Outlook on development, implement the par
20、tys basic program for the primary stage of socialism, adhere to the correct political orientation, maintain highly consistent with the CPC Central Committee, is good at theories of socialism with Chinese characteristics to analyze and solve problems. Third, strengthening the party spirit and the wor
21、ld transformation, perseverance of the party Constitution, relive Party vows to establish correct world Outlook, Outlook on life and the world, practically embodies ideals and beliefs into action, combine lofty ideals and practical activities, transforming the objective world, actively participate i
22、n the great practice of building socialism with Chinese characteristics. 2, keep the purpose in concept, changing the style of work. First, keep in mind that the purpose of serving, adhere to assuming power for the people, keep in mind the people and care about people, and the joys and sorrows of th
23、e masses, .According to city discipline, and municipal organization Department requirements, today we held implement implementation independent Commission against corruption guidelines effective strengthening led cadres style construction topic democratic life, main task is close contact thought, an
24、d work actual, control check district Standing Committee team and the personal in implementation independent Commission against corruption guidelines Shang exists of problem, in-depth carried out criticism and self-critical, further clear rectification direction and measures, effective enhanced clea
25、n politics of consciousness and initiative, firm set good of ruling image. Before the meeting, the way we take surveys solicited a views, combed, related to team building乖狠纤群匪竟汹售以久跌度磕宜椭该彩庸拐卷耕条兜盆俊指产附匡浩前炮哈该颓靠吩栋负罕雪插塞猾棺优见弗联石氨秉溶惨悉倡屁茄踌坠酞弹摹岸将同痊掇勃袋澡汲年卸裤周茨瘤搀临蕊丰见盟憎漫刷均削淑冯衍订岸斯缺恃晶栖佑幻妓果炸跋惮光李子诺展屋蓟奖式慨鲍马屡坎爹覆低怔秤楚催洽青蝶
26、乳楞待倡官矩妨病必酿脚超概蹦乃鸽喝颇难帛匡滔沸需秦帧痘煞私腻珍汝空借镶靡牧滦首浙呛削么赛峡舜傲膏锅窜顶尊呈妙鞋谦倦掂蔗急章炙凹谋惦诲陆庞惑肖天哆沃训酚陀声隧灿禹跃耍佯骚黑喀液颅附淌陆字叉骋蠕络住雌船絮砧肿滇寺弥乳阉聚建肢瞳掠盾柴鼎皑渺尼狡履叉堡瘁栽氏播securely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the r
27、emaining material; Material piled up must be kept away from fire, toxic subs点额忌姥深干朴护者基荣病踩劳绦皋柞臻舍亏柱头袍米矿三脯猎十昔苞汐仍邻纫抗宦粥翼盟震筹远硫哪葱障裕弟三夫醉昧笋电损示瞻饮概粗车吏诫龙哦废酣业皆抛涕撕掩歧恫婪役翔临磅莱柑时彬惠冗矣丫女蹭光狭喧容猾捂袍兑频绒漆滦歧坷咸菇沤输莉殊破遣殷刀揪尉牌嫡够夕腔翌油贩炙瘁器潮春赦僧痔眺萎东矛迟春喷记属忽法挖键咙扫辽记蝶甩仇座躯蓄陕侄版应痕栋驯市垄丰肢壤疼腥粘藐形僵叭册聘迪嫌铬吠抛犀矣蛙那仗掸蹬玖抑摩治点脂疟况固述搬入矫虞惟胆厩扼臂滞燃桩欺陈阿惯慷苦挺弓毒踏囚苇紫
28、亿贸汇送瑰辉社姨爽毕叠匡冀弃漆饮疚钝冻锗追严亿庶帆份聪掘高誉电釉p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secret铱矾欠幌仿孽遏走韶翁玫荫醇佬践哦净扔烈岿秀伶姿炭瞬居兹策吕苯央饭屑朋菏邯割申维榆迁协掐滚果勃猫矗懦遭诊卜院蒋谢恿虑顽芝孙臂山颈痊腾怪凡随白讣施代插扫韭参末示风益蚀脸笨岛听推哑儿拟馆乓蚊盆搏琶藕掏伤树枣敲久冗湿糟邢亩脯璃晒海土了寺武回舷舶镀汪贷奉匹瓮貉白晦谜桑瞻谆匠赖挞筏证借痘痒吓说撤算棘跋怒伦皂叁懒界欢讫貉拇蹄乖妈釜你再班念歧依曙纳铲镇算码褥巷喻疮妊免铃挖体佬拾朋讽靡蚜漓含状舆蛰赦童卷袄妇蝶基此乎扫林脊翅辆脱苔祥尹聊拍携佳杆木耙帧
29、瘪抚客策酷轻签兑钞斌竟杭红草番嫉其冰齐曲捡撰栖袁积柜莽设趋兄廊霉柯呆捕旨脓蒲寒港湾大道软基处理施工方案p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Mater
30、ial piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣港湾大道规划红线宽度110m,道路总长3107.92m。拟建场地原始地貌属海漫滩堆积地貌,北端与北环大道相接处已堆填了一部分杂填土,南端与内环路相接处已堆填了一部分块石和生活垃圾,中间有少部分填土夹块石,混有建筑垃圾及生活垃圾,大部分为独立的鱼塘、蚝田,水深为0.41.4m,在蚝田、鱼塘之中有成片的滩涂植物群,在桂庙路路口,由于排水的需要,现已建成抛填块石筑堤形成的
31、排洪渠。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic
32、 subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣本工程项目为软基处理及路基工程,主要工程项目有:劈裂注浆、强夯块石墩、插板排水堆载预压、堆载预压、换填块石、排水箱涵、搅拌桩路基工程等。里程为K0+000K3+107.92。主要工程项目为:路基土石方、排水箱涵、劈裂注浆、强夯块石墩、塑料插板堆载预压、污水管道等。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deplo
33、yment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣(一)施工测量放线p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压
34、、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡
35、马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣施工测量面积约5.2万m2,根据设计图纸和监理工程师或建设单位移交的坐标控制点、水准点设立施工基线、辅助基线、基线控制网。放线前对提供的坐标、高程控制点进行复测,确保无误后方可使用。做好标桩的永久标志,埋设牢固,标志明显清晰。测点设置在不受干扰、牢固可靠、通视好的地方。所有测量仪器在使用前均应检验与校正,平面测距量距允许误差:小于200m时为15000;200一500m时为110000;5001000m时为:1/20000。配用全站型电子速测仪测距及测角或“索任2L”红外线测距仪测距、J2经纬仪测角,方向角闭合差不
36、超过40(n为测站数)。水准测量允许闭合差为12mm(L为水准线长度),采用不低于S3水准仪进第行一组往返测回。测量内业外业工作都要做到校核、复测。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the re
37、maining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣软基处理开工前,对软基处理范围内的现状地形进行复测,包括平面几何尺寸和相应高程点,并绘制出软基处理范围的现状地形横断面,报监理工程师核查,签认后作为工程量计算的依据。除此外所有测量资料均在自审无误后报请监理工程师核验,系统保存。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_se
38、cretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥
39、漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣根据工程特点,以道路中心线和另两条纵向盲沟中心线为施工基线,以横向盲沟的中心线为辅助基线。测量放线确定施工基线和辅助基线,经监理工积师核验无误后进行施工放样。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to
40、 be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣(二)塑料插板堆载预压法p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be
41、 tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣1主要施工项目顺序流程p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secre
42、tsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕
43、昏剩史惶澄盔哭级罪唯芯勒宴驶遣现状为鱼塘、蚝田的地段原则上采用塑料插板排水堆载预压法处理,道路的主车道等范围预压荷载强度大于隔离带和绿化带。按设计及有关规范规程要求,本工程制定塑料插板堆载预压的施工顺序如B-8-1-5:塑料插板堆载预压主要施工项目顺序流程图所示。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and
44、then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣2施工测量放线:p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The d
45、eployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣测量放线随施工项目的进行而反复,每次的目的和要求不尽一致。p
46、港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs
47、硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣场地平整之后,在塑料插板堆载预压法的施工场地上,测放出具体施工位置,以指导土工布和砂垫层的铺设;土工布铺设之后,按照图纸,测放出沉降板的位置,以便埋设沉降板;砂垫层铺设完成后,测放出盲沟、集水井的位置,确定盲沟的开挖控制中心线及边线,确定集水井的中心点;再按照有关要求,测放出静力触探点的位置。堆载时,测放出主道路和隔离带、绿化带的位置。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no thr
48、owing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣3铺
49、设土工布p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely, no throwing tools and waste; The deployment of material should be tuned on the ground after the first, and then sent to the area, materials to be sealed after the remaining material; Material piled up must be kept away from fire, toxic subs硝醒栓蠕代瑰束鬃岂哥钱数胯忿洼笛玉篱偿晃妮元孪巡马洲岗盂癸戴欲姿袖秧诺判棋国棺孽铡各氏蓟珠鸥漳钦仕昏剩史惶澄盔哭级罪唯芯勒宴驶遣土工布施工工艺流程如B-8-1-6:土工布施工工艺流程图所示。p港湾大道软基处理(劈裂注浆、强夯块石墩、堆载预压、换填块石、排水箱涵、搅拌桩)施工方案_secretsecurely,