gr箱梁承重支架专项施工方案.doc

上传人:sccc 文档编号:4796175 上传时间:2023-05-15 格式:DOC 页数:74 大小:1.08MB
返回 下载 相关 举报
gr箱梁承重支架专项施工方案.doc_第1页
第1页 / 共74页
gr箱梁承重支架专项施工方案.doc_第2页
第2页 / 共74页
gr箱梁承重支架专项施工方案.doc_第3页
第3页 / 共74页
gr箱梁承重支架专项施工方案.doc_第4页
第4页 / 共74页
gr箱梁承重支架专项施工方案.doc_第5页
第5页 / 共74页
点击查看更多>>
资源描述

《gr箱梁承重支架专项施工方案.doc》由会员分享,可在线阅读,更多相关《gr箱梁承重支架专项施工方案.doc(74页珍藏版)》请在三一办公上搜索。

1、laparici de tot tipus de casos, la caiguda daccident de sha produt. (9) on la feina nivells sense operacions de installacions de protecci de seguretat, treballadors de la construcci han de dur un cintur o arnesos de seguretat (dispositius de protecci de seguretat sha comprovat abans del seu s), el c

2、intur de seguretat o cordes de seguretat utilitzats han de complir els principis dalta i baixa. No hi ha deures don ls de productes de protecci, per evitar accidents de caiguda passi. 6, prevenci dintoxicacions, asfxia accident les mesures preventives per evitar lenverinament, millor protecci de la

3、seguretat i la salut dels treballadors, les mesures es formulen. (1) quan la profunditat de la pila s ms de 5 M, el dia abans de linici de ls detector de gas per a la detecci de gasos txics, confirmar que el gas dins del forat correctament, abans dobra menor; ha de tenir 15min noms desprs de la vola

4、dura de fum forat es permeten les operacions. (2) lalberg est estrictament prohibit en lemmagatzematge de substncies txiques i qumics. (3) s interior lestabliment independents Calefacci, no fan de flama oberta denllumenat, Calefacci, per evitar accidents que requereixen denverinament de monxid de ca

5、rboni independents de lhabitatge Cambra climatitzada amb foc de carb, estufes ha de ser situats a lexterior. (4) al menjador de lautoritzaci de sanejament, personal de cuina ha de tenir un certificat de salut i certificat mdic per treballar. Botiga daliments crus i cuinats ha de ser processat per se

6、parat. for safety and security, set up security groups, head of the work group is responsible for the operations of safety and security, each team full-time safety officer is responsible for the daily life and production security. 成 . Good dining, on the implementation of special detection system fo

7、r procurement of food, preventing the purchase of spoilage and poisonous food to prevent food poisoning accident occurred. Pay attention to personal and environmental hygiene, to beautify the environment, clean air, beautiful life, environment, prevent the spread of infectious disease epidemics and

8、ensure attendance to ensure production safety. 8.4.4.4 from management to ensure safety punishment detailed rules for the implementation of a safety. To comply with policies, laws and regulations, observe labour discipline, according to safety regulations and technical specifications for constructio

9、n requirements for the construction, maintenance of production and life order, maintain social order there is significant merit in team and individual Award respectively; otherwise, penalties, to ensure production safety. 8.4.4.5 construction site safety protection 1) temporary facilities security p

10、rotection a. construction of establishing traffic signs and lighting, vehicle and pedestrian traffic safety. B. underground structure within the construction site, the underground pipeline,de la carretera, la construcci de canonada de desgus: a causa del drenatge canonades incrustat en tons, dacord

11、amb les especificacions pertinents i tenint en compte els requeriments raonables de tecnologia de la construcci, ha de fer el tractament subgrade i la zona dexcavaci desprs de lelevaci de lexcavaci a la ubicaci correcta i construcci de clavegueram. Per tant, lexcavaci de terra-Roca i terrapl caixa d

12、e la carretera, un acord raonable dobres de drenatge es va convertir en la clau per a la realitzaci del projecte suau. Pre-construcci, noms accelerar lexcavaci del moviment de terres per a subgrade i terrapl, per les obres de drenatge i posterior construcci crear cares, per tal de garantir la supera

13、ci de la totalitat del projecte. Aiges avall de nou lautor: segons els requeriments de tecnologia de construcci de drenatge, seguint lordre codi dincrustaci desprs de la primera per garantir la construcci de bon drenatge temporal durant lorganitzaci de construcci, perode de construcci en el seu conj

14、unt. Desplegament raonable de moviment de terres: aquesta Enginyeria per la construcci de processament i subgrade moviment de terres excavaci Enginyeria volum gran, base suau en la plena segons situaci especfica lloc, pargraf de cincia dividit construcci, arranjaments raonables distribuci de movimen

15、t de terres i nombre de moviment de terres abandonades exterior, festa pot camp redut dins el moviment de terres de repetici cavat omple de treball, per accelerar el moviment de terres subgrade i processament de subgrade de progrs de construcci, des del principi a les condicions de construcci creada

16、 de canonada drenatge, garantiran Enginyeria tot ordenat per. Canonades, paisatgisme, illuminaci denginyeria, construcci, Enginyeria de transport: a causa del disseny de drenatge del sistema utilitzant combinat, fora de la reserva a drenatges vial la canonada transversal ms significatiu impacte cons

17、trucci i Enginyeria de drenatge de la canonada creuant, i collectors enterrats profund,. 7.4.1 fase de preparaci construcci (1) construcci de lestaci de lloc: Oficina de lsing, va crear camps i altres installacions temporals, posant en el poder de lloc de construcci, corredor daigua. (2) lestablimen

18、t de la construcci de xarxa de control de topografia, organitzacions mesurar golfes i mesurar els resultats reportats pel Comissionat, els propietaris. (3) gran quantitat dexcavaci de subgrade, la identificaci de lrea de descrrega, per a la paret de Roca es prepara b. (4) mbit construir 2.4m blaus m

19、etllics de paret, noms reservat per a la construcci de treballs amb interseccions trnsit transversal, estrictament segons lorganitzaci de trnsit dels unitats organitzatives i residents al llarg del trnsit original. 7.4.2 etapes de construcci de moviment de terres de aquesta enorme quantitat de movim

20、ent de terres de lenginyeria, construcci sDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my com

21、pany 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementatio

22、n, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the batte

23、ry indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security me

24、asures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 mil

25、lion Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.

26、12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equiva

27、lent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -Th

28、e two management system for improvement. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines

29、, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspect

30、ion, safety production month, day supervision of production safety and the Olympic Games and other宁波市北外环、环城南路快速路工程II-I标段现浇箱梁承重模板及支架专项施工方案编制:审核:批准:宁波建设集团股份有限公司宁波市北外环、环城南路快速路工程II-I标段经理部2011年5月目 录一、编制说明41.1、编制依据41.2、编制目的41.3、适用范围51.4、编制原则5二、工程概况52.1、工程简介52.2、水文地质条件62.3、现浇箱梁施工内容72.4、桥梁标准断面图12三、支架体系地基处理及

31、加固措施13四、现浇箱梁模板及支架设计144.1、门式支架施工方案144.2、跨路门洞施工29五、支架体系预压及验收355.1、支架预压355.2、支架验收37六、箱梁砼浇筑施工及养护376.1、砼浇筑施工376.2、砼养护40七、施工质量保证体系及措施407.1、施工质量保证体系417.2、质量保证措施42八、安全组织机构及职能分工448.1、安全组织机构448.2、职能分工458.3、安全保证措施47九、危险调查及应对措施489.1、施工临时用电安全措施489.2、高空作业安全措施509.3、钢筋骨架制作安装安全措施529.4、模板制作、拼装安全措施539.5、支架拆除安全措施539.6、

32、预应力张拉作业安全措施559.7、氧气瓶、乙炔瓶使用存放安全措施56十、文明、环保施工措施5710.1文明施工措施5710.2环境保护措施58十一、安全检查58十二、安全应急预案5912.1、应急组织机构5912.2、职责分工6012.3、常见事故应急预案6212.4、应急联系方式6812.5、其他有关事项68现浇箱梁承重模板及支架施工专项方案一、编制说明1.1、编制依据1.1.1、宁波市北环路、环城南路快速路II-1标施工招标文件及施工合同。1.1.2、宁波市北环路、环城南路快速路II-1标施工图设计文件及工程地质勘探报告。1.1.3、宁波市北环路、环城南路快速路II-1标项目经理部安全管理

33、的相关条款。1.1.4、国家及地方关于安全生产等方面的法律法规条例。1.1.5、宁波市北环路、环城南路快速路II-1标施工组织设计文件。1.1.6、其他相关文件及有关技术规范:(1)、公路桥涵设计通用规范(JTG D60-2004)(2)、城市桥梁设计准则(CJJ 11-93)(3)、混凝土结构工程施工质量验收规范(GB50204-2002)(4)、建筑结构荷载规范(GB 50009-2001)(5)、城市桥梁工程施工与质量验收规范(CJJ 2-2008)(6)、公路桥梁施工技术规范(JTJ 041-2000)(7)、施工现场临时用电安全技术规范(JGJ46-2005) (8)、建筑施工模板安

34、全技术规范(JGJ162-2008) (9)、建筑施工门式钢管支架安全规范(JGJ128-2010) 1.1.7、其他编制参考文件(1)、桥梁预应力混凝土施工技术及标准规范实施手册(2)、简明施工计算手册(3)、路桥施工计算手册1.2、编制目的 1.2.1、有效指导宁波市北环路、环城南路快速路II-1标段现浇箱梁施工,确保施工质量、安全受控;1.2.2、更好的组织安排现浇箱梁施工计划;1.2.3、人员因施工负伤率小于2,重伤率和死亡率为零;1.2.4、不得因施工对周边环境、建筑、设施等造成破坏;1.2.5、无伤亡事故发生,无重大安全隐患,无刑事案件发生.1.3、适用范围 本方案仅适用于宁波市北

35、环路、环城南路快速路II-1标现浇箱梁施工。1.4、编制原则1.4.1、遵循招标文件各项条款的原则。执行业主对本工程建设的各项要求,采取现代化管理手段和施工项目管理模式,优化资源配置,实现动态管理,以适应施工组织安排的要求;坚持专业化作业与综合管理相结合的原则,在施工组织方面,发挥专业施工队伍的优势,同时采用综合管理手段,合理调配,以求达到整体优化的目的。1.4.2、贯彻执行各项技术标准、安全技术规程。对现场安全管理实施全员、全方位、全过程严密监控。1.4.3、坚持实事求是,本着“科学管理、精心组织、精心施工”的原则,确保施工组织的可行性、先进性和合理性。1.4.4、坚持 “改造自然、美化自然

36、、工程建设、环保同行”的原则,施工、环保同考虑、同安排、同落实,两者并举,同期进行,按永久工程标准建造、维护环保设施,达到施工、环保双成功、双满意。二、工程概况2.1、工程简介 宁波市北环路、环城南路快速路II-1标段,工程修筑起点桩号为K0+430.498,工程修筑终点桩号为K2+593.498,长度为2163.0m,其中,包含机场快速互通式立交1 座,上下匝道2 对。根据路线走向,本标段范围内环城南路快速路自西向东需分别与机场快速干道地面辅道、通达路、丽园路、宇达路、环城西路和粮丰街相交,高架主线跨相交路,地面辅道与相交路平交,此外还与两条现状河道相交,分别为后家河和南塘河。本合同段施工范

37、围为:道路及附属工程、保通工程、原桥梁拆除、互通式立交、上下匝道、高架桥、地面桥梁、雨水排水管、给水管、顶管、路灯、电缆沟、公交站台及交通环卫配套设施等施工总承包。2.2、水文地质条件2.2.1、水文气象条件本工程施工区域属北亚热带季风气候区,受沿海季风环流的影响,呈现出东冷夏暖、四季分明的特点。春季北方冷高压逐渐北退,太平洋副热带高压逐渐南下,气温转暖,锋面活动增多,降水增多,风向变化以西南风为主。春末夏初,锋面气旋活动频率,降水连绵,且历时长,习称“梅雨”季节;夏季受副热带高压控制,天气晴热,盛行东南风;秋季天气晴好凉爽;冬季受北方大陆冷高压气团控制,盛行西北风,天气以晴冷为主,降水量少。

38、场地所在的地区,每年7-9月为台风侵袭期,台风会带来大量降水,其特点为水量集中、历时短、强度大,易造成洪涝灾害。由于受太平洋副热带高压控制,常伴有热带风暴的侵入,是沿海地区主要的灾害性天气。因此本工程应特别重视台风和风暴潮等气象灾害,采取有效防治措施。本地区年平均气温17.3。历年极端最高气温40.6,极端最低气温-5.9。7月份天气最热,月平均气温28.9;1月份天气最冷,月平均气温5.1。年平均降水量为1350.7mm,年最大降水量为1666.0mm,年最小降水量为944.3mm,日最大降水量为102.0mm。本地区历史上曾出现的最大瞬时风速大于31.9m/s,多年平均风速为2.9m/s,

39、夏季主导风向为偏东,冬季主导风向为西北。2.2.2、地质条件本工程沿线地面高程在2.5-4.5m不等,并分布有电信、主干供水、国防光缆、燃气、雨水、污水、电力等管线。地基土在50m深度范围内,按成因类型,土层结构及其性状特征划分为七层。依次为1-1层杂填土、2层粘土、1层淤泥质粘土、2层粉质粘土、3层粉质粘土、1层粉质粘土夹粘土、2粉质粘土混砂、粉细砂、3粉质粘土、1粉质粘土夹粘土、2粉细砂、中砂、3粉质粘土。基础影响深度内分布有表层人工杂填土,其余均为粘土、粉质粘土层,总体上工程地质较好,物理力学性质较高。实际施工时对表层杂填土进行整治后,浇筑表层砼进行硬化作为承重体系基础。2.3、现浇箱梁

40、施工内容(1)、立交匝道桥现浇箱梁(35联):包括A匝道桥(5联)、B匝道桥(4联)、C匝道桥(4联)、D匝道桥(8联)、E匝道桥(5联)、F匝道桥(9联)。其中A11-A15联、B0-B3联、D3-D7联、F19-F23联、B9-B13联、C11-C16联、D15-D18联、D18-D20联、D20-D23联、E0-E2联、E2-E5联、F0-F4联、F4-F7联等与机场路相接或相交的现浇箱梁率先施工。(2)、主线高架现浇箱梁(25联):其中36#联现浇箱梁横跨机场路率先施工。(3)、主线上下匝道桥现浇箱梁(8联):包括HXS匝道桥(2联)、HXX匝道桥(2联)、HDS匝道桥(2联)、HDX

41、匝道桥(2联)。现浇箱梁主要形式如下:主线高架联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-33*307.8-7.93524.95/2.8C501.5+1+1.523-640+47+407.9-8.525.52/3(支点)4.95C502.5+3+2.536-104*308.5-9.125.524.95C501.5+1+1.5410-1430+33+35+279.1-9.625.524.95C501.5+1+1+1.5514-1734+55+439.6-10.222-202/3(支点)2.4/0.75C601+2+1.5617-225*3010.2-

42、10.72022.4/0.75C501.5+1+1+1+1.5722-2543+55+4310.7-10.9202/3(支点)2.4/0.75C602.5+3+2.5825-294*3010.9-10.42022.4/0.75C501.5+1+1+1.5929-334*3010.4-9.62022.4/0.75C501.5+1+1+1.51033-363*309.6-9.620-2422.5/0.75C501.5+1+1.51136-3934+42+419.6-9.825.52/3(支点)4.95C501.5+1.5+21239-423*309.8-9.825.524.95C501.5+1+1

43、.51342-4525.5+30+309.8-10.725.524.95C501.5+1+1.51445-483*3010.7-11.325.524.95C501.5+1+1.51548-5143.5+51.5+4011.3-11.825.52/3(支点)4.95C602.5+3+2.51651-5427.5+30+3011.8-11.325.524.95C501.5+1+1.51754-5730+35+3011.3-11.525.524.95C501.5+1+1.51857-6030+38+3311.5-9.825.524.95C501.5+1+1.51960-6346+55+469.8-9

44、.625.52/3(支点)4.95C602.5+3+2.5HXS匝道联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-33*30.51-58.51.82.3-2.4C501.5+1+1.523-641.7+42.7+34.55-8.18.522.3-2.4C502+1.5+1.5HXX匝道联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-333.5+41.3+40.30.8-6.68.522.3-2.4C502+1.5+1.523-63*29.56.6-8.78.51.82.3-2.4C501.5+1+1.5HDS

45、匝道联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-425+30+38+331.2-6.68.51.82.3-2.4C501+1+1.5+1.524-746+55+466.6-9.88.52.2/3(支点)2.3-2.4C603+2+3HDX匝道联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-346+55+460.9-6.88.52.2/3(支点)2.3-2.4C603+2+323-733+38+30+256.8-9.68.51.82.3-2.4C501.5+1.5+1+1A匝道联号墩号跨度/m设计梁底净高/m单幅横向跨度/m梁高/m翼缘板长/m标号预拱度/cm10-528+28+42+28+2814.5-18.7922.6-2.7C501.5+1+1+1+1.525-833.9+42+32.118.7-14.6922.6-2.7C501+0+138-1128+28+2614.6-11.7922.6C501.5+1+1.5411-1535+45+45+3511.7-7.192.22.7C504*1515-1829.5+30+307.1-7.791.8

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号