1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia
2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements
3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the
4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi
5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli
6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar
7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc
8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated
9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc
10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen
11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a
12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and
13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and
14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5
15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu
16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge
17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester
18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.
19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing
20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high
21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab
22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted
23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease . 南昌红谷滩万达广场A区智能化工程技 术 投 标 文 件投标单位: (盖章)法定代表人或获授权代表: (签字或盖章)日 期:2011年12月2
24、2日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation. 4.3 proxy application shall
25、 affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be no loose pages. 4.5 agent a
26、pplication should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rules of the Nineth, tender age
27、nt service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not exceed 20%, otherwise the a
28、pplication cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after the end, controlled respon
29、se rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim measures for the management
30、 of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service f
31、ees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate computation of tendering agents s
32、ervice fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents and solicitation documents g
33、oing to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application of various supporting docu
34、ments should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged the need to provide, or yo
35、u can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .江苏省紫光智能系统有限公司 技术投标文件目 录一、施工组织设计4第1章总体概述:施工组织总体设想、方案针对性及施工段划分51.1工程概况51.2质量目标51.3工期目标51.4工程范围51.5工程建设标准51.6施工组织总体设想61.7方案针对性71.8项目管理目标及组织机构设置131.9施工部署161.10施工范围及施
36、工界面划分19第2章施工现场平面布置和临时设施、临时道路布置23第3章施工进度计划和各阶段进度的保证措施243.1施工进度计划243.2工期保证措施25第4章各分部分项工程的施工方案及质量保证措施274.1主要分项工程施工、技术方案274.2工程质量管理体系:质量管理网络50第5章安全文明施工及环境保护措施555.1文明施工及成品保护措施555.2环保节能措施585.3安全生产及紧急情况预案61第6章劳动力、机械设备和材料投入计划656.1劳动力安排计划656.2本系统工程所需机械设备表656.3施工机械设备进场计划656.4施工用水用电计划666.5主要材料的选择、检测、采购计划和存储676
37、.6工程材料准备676.7进场计划流程676.8设备的成品保护方案70第7章关键施工技术、工艺及工程项目实施的重点、难点与解决方案717.1施工难点分析717.2系统集成及相关接口问题717.3项目实施的重点、难点和解决方案72第8章与总包及其他专业施工单位的配合808.1配合框图808.2工程协调808.3积极的项目冲突管理818.4与建设单位的配合818.5与监理单位的配合818.6与设计单位的配合828.7与土建总承包单位的配合828.8与各专业承包方的配合与界面848.9与其他智能化厂商间的配合878.10与行业管理部门方面的配合888.11供货商的配合管理888.12工程进度上的配合
38、88第9章系统竣工验收899.1隐蔽工程验收899.2项目工程验收899.3竣工验收899.4验收及其验收依据909.5系统验收的步骤和方法909.6系统验收流程图91第10章培训、技术支持和售后服务9210.1概述9210.2工程售后服务9210.3系统维护方案9410.4工程培训方案96二、附表资料1001. 拟投入的主要施工机械设备表1012. 劳动力计划表1023. 施工进度计划图1034. 施工总平面图1075. 临时用地表108三、资格证明资料1091. 营业执照1102. 组织机构代码证1113. 税务登记证1124. 法定代表人身份证1135. 资质等级证书1145.1建筑智能
39、化工程专业承包一级1145.2建筑智能化系统设计专项甲级1186. ISO9000质量保证体系1197. 拟派项目管理班子主要成员履历表1207.1项目管理班子组成表1207.2主要成员履历表1218. 拟派项目管理班子主要成员资质等级证书1289. 项目班子主要成员个人获奖(荣誉)证书13710. 企业近五年同类工程13810.1上海宝山万达广场弱电智能化工程13810.2无锡市市民中心智能化系统工程5标段14310.3新建卷烟物流配送中心联合工房及配套辅助用房建筑智能化工14710.4中国人民银行清算总中心建筑智能化系统改造工程15110.5常州海事处暨常州市水上搜救中心综合业务用房建筑智
40、能化系统工程15711. 投标人的人力资源状况、自有机械设备资源状况和相关配套设施状况16311.1人力资源状况16311.2自有机械设备资源状况和相关配套设施状况16412. 投标人拟用劳务的来源、资质、业绩、与投标人合作的历史状况16513. 企业资信证明16614.企业近三年财务报表16714.12008年度财务报表16714.22009年度财务报表17214.32010年度财务报表17715. 厂家授权书182 一、施工组织设计第1章 总体概述:施工组织总体设想、方案针对性及施工段划分1.1 工程概况工程名称:南昌红谷滩万达广场A区智能化工程。建设地点:红谷滩新区凤凰中大道。建设规模:
41、总建筑面积约55万平方米,万达第三代城市综合体。1.2 质量目标质量等级要求合格标准。工程质量标准必须符合中华人民共和国国家标准(以下简称“国家标准”)以及地方(不包含港、澳、台地区)标准,如果相关文件中规定的标准低于国家标准的,则按国家标准执行。1.3 工期目标计划开工日期为2012年1月6日(具体开工日期以招标人或总监理工程师签发的工程开工令为准。)计划竣工日期为2012年7月3日,总工期为180日历天。1.4 工程范围工程范围:本标段施工图范围内的建筑智能化系统工程1.5 工程建设标准1、依据设计文件的要求,本招标工程项目的材料、设备、施工须达到下列现行中华人民共和国以及省、自治区、直辖
42、市或行业的工程建设标准、规范的要求。全国住宅小区智能化系统示范工程建设要点与技术导则民用建筑电气设计规范 JGJ/T16-92智能建筑设计标准 (GB/T503D14-2000)入侵探测器通用技术条件 (GB1048。1-89)主动红外入侵探测器 (GB1048。4-89)被动红外入侵探测器 (GB1048。5-89)防盗报警控制器通用技术条件 (GB12663。90)微波和被动红外复合入侵探测器 (GB1048。6-9)电缆线路施工及验收规范 (GB50168-9)电子计算机机房设计规范 (GB50174-93)民用闭路监控电视系统工程技术规范 (GB50198-94)入侵报警系统技术要求
43、(GA/T368)视频安防监控系统技术要求 (GA/T367)黑白可视对讲系统 (GA/T269)安全防范工程程序与要求 (GA/T75)安全防范系统验收规则 (GA308)施工安全管理规范、规程及规定(1)建筑施工高处作业安全技术规范(2)建筑机械使用安全技术规程(3)施工现场临时用电安全技术规范其它规定以上第一条第二条两项规范涉及到的其它现行国家规范、规程和规定和江西省南昌市地方管理规定。设计施工图中涉及到的规范、规程和标准及相关技术要求。当上述标准与国家最新标准冲突时以当前国家颁布的最新标准为准执行。1.6 施工组织总体设想为了实现本工程的各项目标,我公司将积极、主动的配合工程总包方,做
44、到确保施工安全,严把质量关,保证系统验收一次通过,加强管理,保证工程按工期要求完成,各种文档完整齐全;做好质保工作。为此,我公司制定了具体落实措施。选派具有丰富工程经验的项目组织机构:项目人员选择时,选择具有丰富工程经验,技术过硬,作风过硬的现场管理和技术人员。现场管理班子中项目经理、技术负责人,主要技术和管理人员均参与过重大工程项目,均具有较高的施工技术水平和管理经验。施工人员选择:我方将选派曾在重大工程中参与施工的队伍,以保证基层施工力量能最大程度地满足施工高质量要求。建立高效科学的质量管理体系:我方将根据工程实际情况,按照过程精品的要求,实行动态管理。将按照ISO9001标准的要求,编制
45、过程质量执行程序,确保每一道工序受控。同时编制与质量有关的管理程序,主要包括:材料采购、施工劳务分包、合同签定等,一切均以保证质量目标实现为前提。加强责任目标管理:工程开工前,根据从前期准备到竣工验收,直至工程保修的工作内容,进行合理分工,划清责任。把总体目标按阶段、按内容细化分解,实行动态管理,确定各阶段各项工作的短期目标,以实现总体目标。加大工程投入:我们将在工程开工之前,制定项目质量管理手册,对重要分部分项、重要部位制定高于规范标准的内部实施标准,严格管理,按照“三不放过”原则,对于不符合标准要求的建筑材料、成品、半成品以及施工中各道工序坚决拒绝,确保过程精品。加强资料整理:我们将根据项
46、目对资料的要求,先制定总的资料目录,并对于声像资料等特殊项目,由专人跟踪,力求对于工程全过程及重点部位进行及时、准确地录制,并及时邀请专家指导,发现问题及时改正。充分利用新材料、新工艺、新技术:我们将密切注视智能化技术的发展动向,主动采用新技术、新材料,加大科技投入。并在施工中将成立若干技术创新小组及质量检查QC小组,对于技术、质量上的难点进行攻关。加强工程保修:工程交工后,我方将编制详尽的使用手册,力求辐射至每个部位,每个建筑内容,以保证建设单位在使用过程中,能清楚了解本工程的构造、功能、注意事项。质保期内,我方将派责任心强的专业管理人员带领熟练的技术人员,对工程进行全方位保修,并协助运营。
47、 1.7 方案针对性1.7.1 施工难点分析本项目须与不同专业或标段协调确定各自所需负责的安装工作,并就双方的交接接口商定准确的位置及双方的工作界面,工程范围较大、周期较长,系统较多,相对其它工程有一定难度,经过我们认真分析及以往的工程经验,我们认为本项目智能化系统工程施工中以下问题必须引起重视。系统集成及相关接口问题:在建筑物智能化系统工程建设中,普遍存在着诸如楼宇机电设备自控系统的控制器与受控设备之间、消防系统与安保系统的信息共享、消防系统的火警预报与灭火设备的联动控制、安保系统的各子系统间的控制信息互联及各种控制技术自动报警的联动、以及各种管理信息集成的通信资源共享网络的互联、系统与系统之间的结合,这种相互的关系可归纳为二类,即设备硬件间的连接和系统与设备、系统与系统之间的信息通信软件方式的相联,它们都