mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc

上传人:sccc 文档编号:4869332 上传时间:2023-05-20 格式:DOC 页数:52 大小:139.51KB
返回 下载 相关 举报
mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc_第1页
第1页 / 共52页
mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc_第2页
第2页 / 共52页
mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc_第3页
第3页 / 共52页
mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc_第4页
第4页 / 共52页
mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc_第5页
第5页 / 共52页
点击查看更多>>
资源描述

《mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc》由会员分享,可在线阅读,更多相关《mmBS 487111982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊.doc(52页珍藏版)》请在三一办公上搜索。

1、BS 4871-1-1982 按认可焊接工艺操作的焊工鉴定考试规范.第一部分金属溶接焊BS 4871 : Part 1 : 1982 UDC 621791.0072:331.115.63: 66914:621 .79155) (Reprinted , incorporating Amendments No , 1 and No , 2) British Standard Specification for Approval testing of welders working to approved welding procedures Part 1. Fusion welding of st

2、eel Spcification pour essai d'agrment des soudeurs qualifis pour les procds de soudage agrs Partie 1. Soudage par fusion de I'acier Spezifikation fir Schwei?erprfung mit Verfahrensprfung Teil 1. Schmelzschwei?en von St?hlen 险?如:淤手 NOCOPYING IN ANY F 刷耐烦白tliimil的'&4 ii1r?l剧。N阳则很; 然

3、 I-滋滋吗滚热 d必护察整单援建每嚣阻A笛F 理理坠酷- . 革怒翅可擦边可础理额越密罐罐制脚嘲楠鑫按喇醋睛罐翻111<U!'I町 1:UJ.:飞酣睡疆精攒, c BS 4671 : Part 1 : 1982 Page Appendix A Record of approval te5t of welder Page Inside front cover 8ack cover Contents Foreword Cooperatng organizations 9 句,qr-QUQdTables Weld metal/parent metal combinations Po

4、sitional approval for pipe Acceptance levels Number of te5t specimens required 41呵,4quA咛只UFbp07'Figures 1 , Test piece for butt weld in plate 2 , Test piece for butt weld in pipe 3 Test piece for fillet weld in plate 4. Test piece for branch Gonnection in pipe -atETt111B叫54句JA哼A哼QUQU句ecifi臼tlon

5、1 Scope 2 , Definitions 3 Information to be given to the welder 4 1 tems to be recorded 5 Changes not affecting approval 6 , Extent of approval 7 , T est pieces 8 Submission of te5t weld 9 Examination and testing 10. Statement of results 11 , Reapproval of welder mpliance with a British Standard doe

6、s not 01 itsel1 con1er immunit1rom legal obligations When non-destruct?ve testing is used for the examination of test welds, it should be appreciated that the acceptance levels given in this standard are for the purposes of the approval testing of welders and as such are not necessaril the same as t

7、hose which might be specified for work on which approved welders will be employed Depending upon the emphasis placed on quality control in the production of welded components, the approval of welding procedures covered in this series of standards may be adm?nistered in one of several ways which shou

8、ld be stipulated at the enquiry and/or order stage. The alter-natives currently emploed are the following: (1) each individual contractor (or sub-contractor) may have proved by actual test pieces every weld form he wishes to use, in every thickness and material; or (2) each individual contractor (or

9、 sub-contractor) may have proved by actual test pieces a set of welds representative on a group basis of all the various thicknesses and materials to be used in production; or (3) each individual contractor (or sub-contractor) need not make procedure test pieces provided he can prove by appropriate

10、authentic documentation of an independent nature that he has previouslsatisfactorily welded the type of joint and material in question In respect of (1) and (2) it should be appreciated that once the welding procedure tests have been approved, they need never be repeated unless there is a change in

11、certain variables. As an extension beyond (匀, it may be possible by agreement between the contracting parties for fully documented welding procedures , developed independently of the particular contractor, to be employed without the need for further approval tests It has been assumed in the drafting

12、 of this British Standard that the execution of its provisions is entrusted to appropriately qualified and experienced people , for whose guidance it has been prepared Foreword This revision of this Part of BS 4871 has been prepared under the direction of the Welding Standards Committee It incorpora

13、tes alterations necessary to align the standard with BS 4870 : Part 1 : 1981 and also embodies other technical changes developed from experience gained in the use of the standard since ?t was first published in 1974 This Part of BS 4871 supersedes BS 4871 : Part 1 : 1974 which is withdrawn This revi

14、sion does not invalidate welder approvals previously accepted according to the requirements of the 1974 edition of the standard, provided the details of the procedures are still relevant to the production work on which the welders are to be employed. The extent of approval given by a previous test i

15、n accordance with the 1974 edition may now be related to those ranges indicated lis revised edition AII new approval testing of welders .,jould be made in accordance with the requirements of this revised edition This British Standard is one of a series of standards on the approval testing of welders

16、 and welding procedures, the latter having a bearing on the former for certain applications. This link has been used as a means of arranging the series of standards ?nto: (a) approval testing of welding procedures (see BS 4870: Part 11; (b) welder approval when approval of the welding procedure is r

17、equired; (c) wlder approval when approval of the welding procedure is not required (for either technical or contract reasons) (see BS 4872 : Part 1) For the purposes of this Part of this standard, a welder working to an approved procedure or a procedure being approved is considered to be sufficientl

18、y experienced in the approp巾te welding process and hence alreadcapable 。f passing training tests such as those given in BS 1295 , BS 4871 : Part 1 : 1982 British Standard Specification for Approval testing of welders working to approved welding procedures 1., Scope This Part of this British Standard

19、 specifies requ?rements for the approval testing of welders to be engaged on the manual , semi'.automatic or mechanized fusion welding of those ferritic steel ar austen?tic stainless steel fabrications for which an approved welding procedure has to be employed This standard is not intended to a

20、ppy t。operators of automatic welding equipmen t. Cast.to-cast fabricat?ons are not included特The welder who successfu lJ y completes a welding procedure te5t in accordance with BS 4870 : Part 1 is approved to the extent given in clauses 5 and 6 of this standard without further testing NOTE; The title

21、s f the publications referred to ;In this standard are listed on the inside back cover 2; Definitions For the purposes 01 this Part 01 BS 4871 , the lollowing definitions apply 2 , 1 welding procedure. A specified course of action followed in welding including a list of materials and , where necessa

22、ry, tool5 to be usedt 2 ,2 welding procedure 担目. The making and testing of a welded joint representative of that to be used in production in order to prove the feasibility of a welding procedure NOTE This term is not usually applied to antests that may have been made during the development of a weld

23、ing procedure 2.3 approved welding procedure; A documented welding procedure that has been approved by an inspecting authority either by means of a welding procedure test or as a resut of authentic documented experience gained with the welding of joints similar to that to which the welding procedure

24、 applies 2.4 welder approval te5t. A documented test, which has been approved by an inspectng authority , carried out by a welder working to an approved welding procedure; 2 ,5 te5t piece; Components welded together in accordance with a specified welding procedure, or a portion of a welded joint det

25、ached from a structure, for testt 2 , 6 te5t 5pecimen; A portion detached from a test piece and prepared a5 required for testingt 2.7 inspecting authority. That competent independent bodor association which verifies compl?ance with this standard ;See BS 4570 for requirements for welder approval for

26、steel castings tThis definition 1s taken from BS 499 : Part 1 3; Information to be given to the welder The welder shall be provided with lull written details according to clause 4 01 BS 4870 : Part 1 : 1981 01 the approved welding procedure (which may be modified as permitted by clause 5) which he s

27、hall lollow in making his test weld (see aJso clause 8 of this standard) 4; Items to be recorded The items given in appendix A shall be recorded for each welder approval test NOTE Details of the welding procedure used should have been recorded prev10usly bapproval testing in accordance with BS 4870

28、: Part 1 5; Changes not affecting approval The following changes between the approved welding procedure and the procedure used for the welder approval test shall not entail reapproval of the welder NOTE Clause 5 of BS 4870: Part 1 ; 1981 states the changes affecting an approved welding procedure, bu

29、t for welder approval purposes more latitude is permitted as only the welder's ability 1s being tested (a) A change in parent metal (but see item (d) within one of the following ranges of steels丰 (see also table 1) (1) Carbon steels and low alloy steels with less than 6 % total alloy NOE. '

30、;This range corresponds to groups Al , A2, 8, C, D, E1 , E2, F, G and K of table 1 of BS 4870 : Part 1 : 1981 (2) When high alloy lerritic weld metal is specilied, a change in parent metal within the range 11 % t。20 % chromium NOTE. This range corresponds to groups M and N of table 1 of BS 4870: Par

31、t 1 : 1981 (3) When austenitic or high nickel alloy weld metal is specified, a change in parent metal or combinations of parent metal within the ranges of carbon, low alloy , high alloy ferritic and austenitic steels NOTE; This range corresponds to groups A 1, A2, B, C,口,E1 , E2, F, G, H, J. K, L. M

32、, N, R, S, T and U of table 1 of BS 4870 : Part 1 : 1981 (b) A change in weld metal composition (but see item (d) within one 01 the groups given in table 1 S 。r a change within the extent of approval given in table 1 a 丰c;臼n combinations of parent metal and weld metal will not allow destruct?ve test

33、ing to be carried out as indicated in 9.1 (b) , In such cases non-destructive testing is to be used A welder may need some period of training when changing from one electrode type to another; BS 4871 : Part 1 : 1982 Table 1; Weld metal/parent metal combinations Weld metal Exarnples of British Standa

34、rd Parent metal options for designations for welding consumables t.目 join1Group Nominal composition W1 < 6 % total alloy BS 639 : all types骨 Carbon or low alloy steel with less BS 2493: all tpes赞 than 6 % total alloy except 7CrMo B and 9CrMo B BS 2901 : Part 1 : all types BS 4165 : all types W2 ;

35、: 6 % Cr 20 % Cr BS 2493 : 7CrMo B, 9CrM。日 FerriticJmartensitic steel within the ferritic/martensitic steels BS 2926: 13 and 17 range 11 % to 20 % chromium W3 Austenitic/ferritic or BS 2926 : all types except 13 and 17 Carbon , low alloy , high alloy ferritic austenitic stainless steels BS 2901 : Pa

36、rt 2 : all types 。r austenitic steel in the following ranges BS 5465 : all types 6 to 29 % C, 5 to 22 % Ni 口 to 4 % Mo Oto 1 ,5%Nb o to 1.5 % Ti W4 High nickel allo BS 2901 : Part 5 : NA 35, NA 39 . A change from a rutile electrode to a basic electrode requires reapproval (see item (C) of clause 5)

37、, Table 1a刷 Extent of approval fo t' weld metal gr oups (b) a test in the horizontal-vertical position includes approval for the horizontal-vertical and flat positions; Test joint weld Ex1en1 口f approval metal group (see table 1) W1 W2 W3 W4 W1 X W2 X X W3 W4 X X X ) A chanQe from either (1) a

38、basic to a rutile covered electrode for group W1 weld metal , or (2) from one electrode type to another for other than group W1 weld metal (d) A change in filler material composition or parent metal for mechanized welding (e) A change in position, thickness , pipe outside diameter or dimension , tpe

39、 of joint and shielding gas within the extent of approval given in clause 6 (f) A change from an unbacked single sided weld to a I:jacked single sided weld or to a double sided weld (g) A change in pre-heating temperature (h) A change in post-weld heat treatment 6; Extent of approval 6.1 Position; T

40、he approval of a welder on a test joint in plate welded in one of the fundamental welding positions shall give approval for welding in the following positions: (a) a test in the flat position gives approval only for that position; 7 (c) a test in the overhead position includes approval for the overh

41、ead, horizontal.vertical and flat positions; (d) a test in the vertical-up direction includes approval for the vertical-up direction and the flat position; (e) a test in the vertical-down direction gives approval only for that direction; (f) a test joint inclined at 45 0 to the horizontal involving

42、the overead p。创tion welded in the vertical-up direction , includes approval for all welding positions but excludes the vertical-down direction Approval for all four fundamental positions includes approval for all intermediate positions In the case of pipe welds , the extent of approval shall be as g

43、iven in table 2 Table 2 Positional approval for pipe Pipe position Pipe movement Welding positions for during test during test whict币 approval is given Horizontal Rotated Flat Vertical Rotated or fixed H ori zontal-verti ca 1, flat Horizontal I Fixed I Flat, vertical , overhead 45 。 I Fixed 6 , 2 Th

44、ickness; For the purposes of this clause , thickness t shall have the following meanings (a) for a butt joint, the parent metal thickness; (b) for a fillet weld , the leg length; (c) for a set-on branch connection , te thickness of the branch; (d) for a set-in or set-through branch connection, the t

45、hickness of the maln pipe The approval of a welder on thickness t sha! include approval for thicknesses in the fo!owing ranges 丁 hickness, t Range approved less than 1. 6 mm t to 2t 1.6 mm up to but 1.6 mm to 2t not including 10 mm 10 mm and over 4 ,8 mm to 2t except that a test made on a thickness

46、t of 20 mm or over shall give approval for welding a l! such thicknesses of 4 , 8 mm and above 6.3 Pipe警 outside diameter or dimension; The approval of a welder on pipe of outside diameter or dimension 0 。f 25 mm or above sha! include approval for diameters or dimensions in the range 0 ,50 to 20 with a minimum diameter or dimension of 25 mm , except that a test made on pipe of outside diameter or dimension 168 ,3 mm or larger shall give approval for welding outside diameters or dimensions 88 , 9 mm and above; For approval to weld diameters or dimen