《上海电影院修缮安装工程监理细则.doc》由会员分享,可在线阅读,更多相关《上海电影院修缮安装工程监理细则.doc(27页珍藏版)》请在三一办公上搜索。
1、Manipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator applic
2、ation began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this
3、 robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set
4、 for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standa
5、rds. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of ind
6、ustrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of autom
7、ation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opp
8、ortunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm r
9、esearch began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic ar
10、m spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like wel
11、ding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand上海电影院
12、修缮工程 安装工程监理细则 上海电影院修缮工程项目安装工程监理细则 一、专业工程概况和特点1、工程概况1、项目名称:上海电影院修缮工程2、工程地址:徐汇区复兴中路1186号3、建设单位:上海市徐汇区人民政府湖南路街道办事处4、监理单位:上海海龙良策工程顾问有限公司5、施工单位:上海徐房建筑实业公司6、设计单位:上海核工程研究设计院7、工程投资额:项目总投资约4483.35万元.8、计划施工工期:计划开工日期为2014年6月30日,竣工日期为2015年6月30日,计划施工工期360日历天,监理周期360日历天。2、专业工程施工的特点2.1本工程主要是修缮和二次精装修。本工程为丙级剧场。2.2、强
13、电:消防用电、备用照明、安保用电、通信用电为二级负荷配电,一般用电设备为三级,采用二级防雷措施。2.3、弱电:包括火灾自动报警系统、通信系统。2.4、通风与空调:通风、空调冷媒管采用铜管,凝结水采用UPVC管,空调送、回风管、通风排气管采用镀锌钢板制作。2.5、给排水:给水由市政直接供给,排水采用污废分流。3、监理依据3.1 本工程的设计施工图及设计文件和有关技术资料,标准图集等。3.2 施工合同、监理委托合同等。3.3 经批准的本工程监理规划、施工组织设计等。3.4 现行国家有关法律、施工检验规范、标准、强制性要求。3.5上海市建委相关的规定和文件。4、监理工作流程附:1.审查施工单位的资质
14、证书、营业执照、安全许可、项目经理、安全员证书,审批施工组织设计(方案)施工计划2.审查工程技术人员资质、数量和特殊工种证件3.检查机械设备和劳动力计划已进场情况是否满足开工要求单位工程开工申请报告承 包 人 监理工程师审 核 不全要求退回 监理工程师巡检,对存在问题,口头、备忘录、发监理通知单整改。、分部、分项工程施工承 包 人 提供材料、成品、半成品、构配件等样品及技术资料承 包 人 . 发监理通知单整改 分部、分项、隐蔽自查承 包 人试验时旁站监理工程师 监理工程师审查/留样不符要求 附:1. 试验报告2. .合格证3. 质量自查记录4. 分部、分项工程验收评定报告5. 监理工程师检验回
15、复自检合格填报验申请表承 包 人 采 购承 包 人 附:合格证(质报书)、认证书、进场抽样检查、测试。填写工程材料/构配件/设备报审表承 包 人监理工程师质量抽查签署审查意见、 不合格检查、取样测试(旁站)监理工程师 进行下一道工序 承 包 人、 监理工程师核验、签署审查意见 否5、监理要点及目标5.1电气工程监理要点5.1.1施工前期监理工作的控制要点1)审核本工程设计图及有关设计文件,并就上述所发现的设计错漏及有违现行国家标准之处、设计不确定及其设计深度、系统设计与建筑功能的不一致性、系统优化等问题,通过图纸会审、设计交底或其它形式向设计、业主等有关建设方提出。通过共同努力,以求得一个符合
16、现行国家标准、符合建筑功能要求、现场施工基本可行、设计意图表达清晰、布局及系统基本合理的电气安装工程建设平台,为今后的电气工程安装施工过程质量、投资、工期等三控制打好基础。2)审核电气安装工程分包单位资质,其中包括:施工单位的企业资质、工商执照、企业业绩;所承包的工程内容及范围;特殊行业的施工许可证及外企在国内承包工程许可证;本工程项目经理资质及等级证书;特种专业施工人员上岗证书等。要求如下:企业资质、工商执照、项目经理证书、专职管理人员及特种专业上岗证,特殊行业的施工许可证及外企在国内承包工程许可证符合要求并在法定有效期内;企业资质等级与本工程内容、范围及等级相符,企业业绩中包含与本工程相似
17、项目。3)审核施工组织设计或施工方案,要求如下:适时性(分包单位应在施工前提出);技术保证(方案中提出的施工工艺技术符合本工程设计及工程技术难点的施工要求,施工技术管理措施有效);人力资源保证(施工企业的人力资源配置满足合同规定的质量、工期目标要求);施工机械保证(企业提供的施工机械设备配置符合合同规定的质量、工期要求);安全保证(企业提供的安全及消防管理体系完整、组织网络完善、措施落实、手段合理满足不同气候、不同场所、夜间及多工种联合施工的安全要求)。质量保证(方案中提出的安装质量目标明确,管理措施到位)计划进度保证(施工进度计划符合合同总工期要求,并且与土建及其他专业施工周期适配)物流控制
18、及成品保护(电气安装材料设备等储运应适时合理,成品保护措施落实)4)审核承包单位现场项目部的质量、技术管理体系和质量保证体系审核要求:工程质量目标明确;技术及质量管理组织机构健全;质量保证体系三级(企业、项目部、施工班组)管理网络完整;专职管理人员及特种作业人员资质及数量符合要求;技术管理制度健全,人员岗位职责明确;原始记录表格齐全,所用仪器仪表合格有效;过程质量控制计划合理;质量反馈及时到位,实施良性循环。5)审核及认定进场材料、设备审核要求:进场的电气工程安装材料、设备应符合现行国家标准、符合本工程设计要求,合格证、质保书等质保资料齐全有效;主要材料、设备进场检验应有施工、监理共同进行,施
19、工单位为主,监理单位确认,检验结论应有记录;有异议送有资质(即依照法律、法规规定、经相应政府行政主管部门或其授权机构认可)的试验室抽样检测,试验室出具的检测报告,确认符合现行国家标准及相关技术标准规定,才能在施工中应用;进口材料、设备除上述要求外,还需提供商检证明及中文的规格、型号、性能检测报告、安装使用说明书等技术文件。审核进场材料、设备的物流及储运计划,其运输和储存应符合材料、设备要求,符合施工进度计划。电气工程新材料、新设备的进场,应经过法定程序批准,并附有合格的新试报告,除需符合上述规定外,还需提供安装、使用、维护保养和试验要求等有关技术文件。6)监理工作的技术准备熟悉设计图纸、深化现
20、行国家标准学习,通过图纸会审、设计交底、专家咨询、专题技术讨论、现场勘察等途径熟悉掌握本工程建筑电气系统的特点及关键的施工工序,为旁站监理的定点选择创造条件。依据建筑电气安装工程的特点及本工程的实际情况,通过协调、落实电气工程总体(大配套)和室内(小配套)供配电工程各专业工序及施工界面的衔接、交叉、预留、预埋等施工作业的工艺、质量措施及其成品保护手段;进一步落实电气安装工程与智能化、通风与空调、给排水及土建相关专业工序的衔接、交叉等施工作业的工艺、质量措施及其成品的保护问题。依据施工临时供配电及工地的实际情况,审核并合理调整土建及各安装专业的用电负荷及配额,检查进场施工的供配电设备(配电箱、开
21、关箱等)的熔丝、导线截面,开关整定值及其接地保护系统。审查地下室板墙、人防工程等混凝土内预埋电气套管防水、防渗漏措施,应符合有关人防工程施工等现行国家标准。依据不同建筑及其电气安装工程的要求,审核电气系统设备安装施工条件(对土建及其它配套工程要求),其中包括:设备房主体结构施工完毕;室内预留、预埋工作符合设计要求;设备基础轴线标高、强度符合设计及设备安装要求;吊具等安装设备到位,施工通道畅通;配套动力(水、压缩空气、电等)及安全防护设施到位。5.1.2、施工过程监理工作的控制点1)电气线路安装工程1在混凝土现浇的楼板、墙体内暗配电管,应沿最短距离敷设,暗配管离构筑物表面距离不应小于15mm,当
22、绝缘导管在砌体上剔槽敷设时,应采用强度等级不小于M10的水泥砂浆抹面保护,保护层厚度大于15mm。2进入落地式柜、台、箱、盘内的电管应排列整齐、管口应高出柜、台、箱、盘的基础面5080mm。室外所有管口在穿入线缆后应做密封处理。由箱式变电所或落地式配电箱引向建筑物的导管,建筑物一侧的导管管口应设在建筑物内部。3金属导管严禁对口熔焊连接,镀锌及壁厚小于(等于)2mm的钢导管不得采用套管熔焊连接。4防爆导管不应采用倒扣连接;可采用防爆活接头连接,其接合面应严密;防爆导管安装牢固顺直,镀锌层锈蚀或剥落处做防腐处理;除设计要求外,导管与灯具、开关线盒等连接处不跨接接地线,连接应牢固紧密,在螺纹上涂以导
23、电性防锈脂。5壁厚小于(等于)2mm的钢管不能作为电线导管埋设于室外土壤中,室外埋地敷设的电缆导管,其埋深应大于(等于)0.7m。6电缆导管的弯曲半径应大于(等于)电缆最小允许弯曲半径(参见表1)。表1 电缆允许最小弯曲半径序号电缆种类最小允许弯曲半径1无铅包钢铠护套橡皮绝缘电力电缆10D2有钢铠护套的橡皮绝缘电力电缆20D3聚氯乙烯绝缘电力电缆10D4交联聚氯乙烯绝缘电力电缆15D5多芯控制电缆10D注:D为电缆外径7金属导管内外壁应做防腐处理;埋设于混凝土内部的金属导管内壁应防腐处理,外壁可不做防腐处理;直埋土层中的钢导管外壁应涂两度沥青(水柏油)防腐。8电气配管、桥架、槽板、线槽等通过建
24、筑物变形缝时的质量监控要点:通过建筑物沉降及伸缩缝部位的所有电气配管、槽板、桥架、线槽、避雷装置等应设补偿装置,补偿装置的几何尺寸及连接应符合有关现行国家标准、图集的要求。9金属电缆支架、金属电缆桥架及支架、电缆导管、引入或引出的金属导管和线槽必须接地(PE)或接零(PEN)可靠;可挠性金属导管和金属柔性导管不能做接地或接零的接续导体,金属线槽不作设备的接地导体;金属电缆桥架及支架、金属线槽(在设计无规定时)全长应不少于2处与接地(PE)或接零(PEN)干线相连;镀锌钢导管、可挠性导管和金属线槽不得熔焊跨接接地线,其专用接地卡跨接的两卡间连线应用铜芯软导线(其截面应不小于4mm2);镀锌线槽及
25、镀锌电缆桥架间连接板两端不跨接接地线,其连接板两端不少于2个有防松螺帽或防松垫圈的连接固定螺栓,非镀锌钢导管采用螺纹连接、两端(连接处)焊接跨接接地线,非镀锌电缆桥架连接板的两端、非镀锌金属线槽间连接板两端跨接接地线(铜芯)接地线截面应不小于4mm2;当镀锌钢导管采用螺纹连接时,连接处两端采用专用接地卡固定跨接接地线。10明配钢管管径在50mm及以下的,必须采用螺纹连接,不得采用套管连接;管径在63mm及以上者,可使用套管焊接,套管应位于两管对口的中心,长度为管外径的1.53倍,焊接应严密。11配管采用螺纹连接时,连接后螺纹宜外露2-3扣,其园钢跨接接地线的直径不得小于6mm,焊接长度应大于(
26、等于)6倍园钢直径、焊接应牢固、焊缝饱满、不得点焊、焊缝无咬肉、夹渣、焊瘤等缺陷,钢管未焊穿;除特殊场所外,50V以下配线的金属钢管、线槽可不做跨接接地线。12明配钢管、PVC刚性塑料管在进箱盒、灯位、开关、插座的150300mm处应设管卡或支架固定;配管应横平竖直,管卡或支架间距均匀、对称,间距应符合现行国家标准。13吊顶内部配管宜按明配管施工,配管不得固定在吊顶的支架或龙骨上,金属软管应做接地保护,各种强弱电导线严禁在吊顶内裸露。14PVC硬塑料管外壁应有连续阻燃标记及生产厂标;PVC硬管和软管的氧指数应大于40;PVC硬塑料不应敷设在高温及易受机械损伤的场所,刚性绝缘导管直埋于地下、楼板
27、内,在出地面或楼板易受机械损伤的一段应采用保护措施,设计无规定时,埋设于结构内部的绝缘导管应采用中型以上管;绝缘导管管口平整光滑,连接采用插入法时,采用专用粘合剂涂于结合部,接口牢固密封,冬季施工时,插入法连接工序应采用一定的保温措施。15沿建筑物,表面及在支架上敷设的PVC刚性塑料管等绝缘导管按设计要求,装设温度补偿装置。16半硬塑料管及塑料波纹管,不宜在吊顶内敷设,吊顶内部钢管、金属支架、龙骨应有统一接地线。17不同回路、不同电压等级、交流与直流的导线不应穿在同一导管内,相互干扰的导线不得穿在同一导管内。当设计要求的或电压为50V及以下回路,同一台设备的电机回路和无抗干扰要求的控制回路,照
28、明花灯的所有回路、同类照明的几个回路穿入同导管,但导管内导线总数应不多于8根。18同一交流回路的导线应穿入同一金属导管内,同一回路的相线和零线,敷设于同一金属线槽内,同一电源不同回路无抗干扰要求的线路可敷设于同一线槽;在金属导管、线槽内电线不得存在接头。19三相或单相的交流单芯电缆不得单独穿在钢导管内。20爆炸危险场所照明线路的电线和电缆额定电压不得低于750V,且必须敷设在钢导管内。21同一建筑物、构筑物在采用多相供电时,电线绝缘层的颜色选择应一致,其保护线(PE线)应为黄绿相间色,零线用淡蓝色;A相黄色;B相绿色;C相红色。22敷设于同一线槽内有抗干扰要求的线路用隔板隔离,或采用屏蔽电线,
29、屏蔽线护套的一端应接地。23槽板敷设时应紧贴建筑物表面,要求横平竖直,固定可靠,严禁采用木楔固定;木槽板应经阻燃处理,塑料槽板应有阻燃标识;槽板内敷线应留有余量,槽板内电线无接头,电线连接设在器具处。24采用木槽板时,槽板无劈裂,塑料槽板无扭曲变形。槽板安装时底板固定点间距应小于500mm;盖板固定点间距应小于300mm;底板距终端50mm和盖板距终端30mm处应固定;槽板底板接口与盖板接口应错开20mm,盖板在直线段和90o转角处应成45o斜口对接,T形分支处应成三角叉接,盖板应无翘角,接口应严密整齐。25槽板穿过梁、墙及楼板处应有保护设施,且与槽板结合严密。26采用柔性导管连接刚性导管及电
30、气设备时,其长度在动力工程中不大于0.8m,在照明工程中不大于1.2m;可挠性金属管、柔性导管与刚性导管或电气设备连接时,采用专用接头;复合型可挠金属管或其它柔性导管连接处应密封良好,防液覆盖层完整无损。27电缆敷设严禁有绞拧,铠装压扁,护层断裂及表面严重划伤等缺陷。28钢制电缆桥架直线段长度大于30m、铝合金或玻璃钢电缆桥架直线段长度大于15m,设有伸缩节;电缆桥架转弯处的弯曲半径,不小于支架及桥架内电缆最小允许弯曲半径(参见本节第6条),设计无要求时,电缆桥架水平安装支架间距应小于(等于)3m,垂直安装时支架间距不大于2m;桥架与支架及桥架与连接板的螺栓固定,紧固无遗漏,螺母位于桥架外测;
31、采用钢支架固定铝合金桥架时,应设相互绝缘的防电化学腐蚀措施;设计无要求时,设置在易爆易燃气体管道和热力管道下方的电缆桥架与管道最小净距符合表2规定。表2 电缆桥架与管道的最小净距(m)管道类别平行净距交叉净距一般工艺管道0.40.3易燃易爆气体管道0.50.5热力管道(有保温层)0.50.3热力管道(无保温层)1.00.529敷设在竖井及电缆沟内桥架,穿越不同防火区的桥架,按设计要求,设防火隔墙措施。30在大于45o倾斜的桥架内敷设电缆时,每隔2m设固定点;电缆出入、电缆沟、竖井、柜(盘)、台、构筑物及管子的部位,作密封处理;电缆首端、末端及分支部位应设标志牌。31电缆在水平敷设时,首尾两端、
32、转弯两侧及每隔一定距离(不大于10m)处设置固定点;敷设于垂直桥架内的全塑型电力电缆及控制电缆固定点间距不大于1m,其他电缆间距不大于1.5m。32电线、电缆接线必须正确、并联运行电线或电缆的型号、规格、长度、相位应一致。低压电线和电缆、线间和线对地间的绝缘电阻值必须大于0.5M。铠装电力电缆头的接地线应采用铜绞线或镀锡铜编制线,其截面积不应小于表3规定。表3 电线芯线和接地线截面积(mm2)电缆芯线截面积接地线截面积120及以下16150及以上2516及以下同芯线截面积33封闭、插接式母线安装时,母线应与外壳同心,允许偏差为5mm;段与段连接时,对准相邻段的母线和外壳,连接后,不使母线及外壳
33、承受额外应力,其连接工艺方法符合产品技术文件要求。室内裸母线的最小安全净距应符合GB50303-2002附录E的规定。3)成套配电柜、控制箱(台、屏)和动力、照明配电箱(盘)安装工程柜、屏、台、箱、盘的金属框架及基础型钢必须接地(PE)或接零(PEN)可靠;门和框架的接地端子与装有电器的可开启门之间应有裸编织铜线连接,且有标识。低压成套配电柜、控制柜(屏、台)和动力、照明配电箱(盘)应设可靠的电击保护;柜(屏、台、箱、盘)内的保护导体应有裸露的端子连接外部的保护导体的端子;设计无规定时保护导体的最小截面应不小于表4规定。表4 保护导体截面积相线截面积S(mm2)相应保护导体的最小截面积SP(m
34、m2)S16S16S351635S400S/2400800S/4注:S与SP材质相同柜、屏、台、箱、盘间线路的线间和线对地间绝缘电阻值,馈电线路必须大于0.5M;二次回路必须大于1M。照明配电箱(盘)安装时,内部配线整齐,且无绞接,导线连接紧密、不伤芯线、不断股,垫圈下螺栓两侧压的导线截面相同,同一端子上导线连接不多于2根,防松垫圈等部件齐全。照明配电箱(盘)内开关动作灵活可靠,带漏电保护的回路,动作电流不大于30mA,动作时间不大于0.1S。照明配电箱(盘)内,分别设置零线(N)和保护地线(PE线)的汇流排,零线和保护接地线分别经汇流排配出。柜、屏、台、箱、盘间配线:电流回路应采用额定电压不
35、低于750V,芯线截面积不小于2.5mm2的铜芯绝缘线缆;除电子元件回路及类似回路外,其他回路应采用额定电压不低于750V,芯线截面不小于1.5mm2的铜芯绝缘线缆,不同电压等级、交流、直流线路及计算机控制线路应分别绑扎,且有标识。4)低压电器及动力设备安装工程电动机、电加热器及电动执行机构的可接近裸露导体必须接地(PE)或接零(PEN)。电动机、电加热器及电动执行机构的绝缘电阻值应大于0.5M。100KW以上的电动机应测量各相直流电阻值,其相间差不应大于最小值的2,无中性点引出的电动机,测量线间直流电阻值,其线间差值不应大于最小值的1。低压电动机、电加热器及电动执行机构等安装应牢固,防水防潮
36、及防爆电气设备的接线入口及接线盒盖等应做密封处理,在设备接线盒内裸露的不同相导线间及导线对地间最小距离应大于8mm,否则应采取绝缘保护措施。5)电气照明、器具安装工程1安装灯具距地面高度小于2.4m时,灯具的可接近裸露导体必须接地(PE)或接零(PEN)可靠,并应有专用接地螺栓,且有标识,灯具回路控制应与配电箱及回路标识一致,开关与灯具控制顺序相对应,成排照明灯具距地面高度小于2.4m,应有专门接地线。2建筑物景观照明灯具的金属构架和灯具的可接近裸露导体及金属软管应接地(PE)或接零(PEN)可靠,且有标识;每套灯具的导电部分对地绝缘电阻值应大于2M;在人行道等人员往来频繁等场所安装的落地式灯
37、具,无围栏防护时,安装高度应距地面2.5m以上。3花灯吊钩园钢直径应不小于灯具挂销直径,且不应小于6mm。设计单独出图及灯具厂指定的大型花灯的固定及悬吊装置,应按灯具重量的2倍做过载试验。4灯具重量大于3kg时,应采用螺栓或预埋吊钩固定;灯具重量在0.5kg及以下时,可采用软电线自身吊装;大于0.5kg时的灯具采用吊链,软电线编叉在吊链内,使电线不受力;灯具固定牢固可靠,不使用木楔,每个灯具固定用螺钉或螺栓不少于2个,若绝缘台直径小于(等于)75mm时,采用1个螺钉或螺栓固定。5采用钢管做灯杆时,钢管内径不应小于10mm,钢管厚度不应小于1.5mm。6安装在危险性较大及一些特殊场所的灯具,其离
38、地高度小于2.4m时,使用额定电压为36V及以下的照明灯具或采取专用保护措施。7若设计无要求,又不采用安全电压,一般敞开式灯具的灯头离地距离为:室外,2.5m(安装在墙上);厂房,2.5m;室内,2m;软吊线带升降器的灯具在吊线展开后,0.8m。8行灯电压不大于36V,在特殊潮湿场所或导电良好的地面上以及工作地点狭窄、行动不便的场所行灯电压不大于12V;行灯变压器外壳、铁芯和低压侧的任一端或中性点、接地(PE)或接零(PEN)可靠;行灯变压器为双圈变压器,其电源侧和负荷侧有熔断器保护,熔丝额定电流分别不应大于变压器一次、二次的额定电流。9应急照明灯应由两路电源供电;其中一路可采用独立于正常电源
39、的柴油发电机组供电;或由蓄电池柜供电或选用自带电源型应急灯具。应急照明在正常电源断电后,电源转换时间为;疏散照明15S;备用照明15S(金融商店交易所1.5S);安全照明0.5S。10疏散照明由安全出口标志灯和疏散标志灯组成,安全出口标志灯距地高度不低于2m,且安装在疏散出口和楼梯口里侧的上方。疏散标志灯安装在安全出口的顶部,楼梯间、疏散走道及转角处,应安装在1m以下的墙面上。不易安装的可安装在上部。疏散通道的标志灯间距不大于20m(人防工程不大于10m)。疏散照明线路采用耐火电线、电缆、穿管明敷或在非燃烧体内穿刚性导管暗敷时,保护层厚度不小于30mm;电线采用额定电压不低于750V的铜芯绝缘
40、电线。11应急照明灯具、运行中温度大于60oC的灯具、靠近可燃物时,采用隔热、散热等防火措施。白炽灯、卤钨灯等光源、不能直接安装在可燃装修材料或可燃物件上。应急照明线路在每个防火分区有独立的应急照明回路,穿越不同防火分区的线路有防火隔堵措施。12彩灯配线管路按明配管敷设,彩灯及配管要有防雨功能,灯罩要拧紧,管路间、管路与灯头盒间采用螺纹连接,金属导管及彩灯构架,钢索等可接近裸露导体接地(PE)或接零(PEN)可靠。用于垂直彩灯的悬挂挑臂的槽钢不小于10,端部吊挂钢索用的吊钩螺栓直径不小于10mm,螺栓在槽钢上固定,两侧有螺帽,且加平垫及弹簧垫圈紧固。彩灯悬挂钢丝绳直径不小于4.5mm,底把园钢
41、直径不小于16mm,地锚采用架空外线用拉线盘,埋设深度大于1.5m。垂直彩灯采用防水吊线灯头时,下端灯头离地高度大于3m。13霓虹灯安装时,灯管应完好无损;灯光采用专用绝缘支架固定、牢固可靠;灯具固定后与建筑物、构筑物表面的间距不小于20mm;霓虹灯采用专用双圈式变压器,所供灯管长度不大于允许负载长度,露天安装的有防雨措施;变压器的二次电线和灯管连接线采用额定电压大于15KV的高压绝缘电线;二次电线与建筑物、构筑物表面距离不小于20mm;变压器明装时,若安装高度低于3m,要采用防护措施;变压器不安装在吊顶内部;霓虹灯装在橱窗内部时,窗户与变压器一次侧开关设连锁保护装置。14安装在同场所的交流、
42、直流或不同电压的插座应有明显区别,且必须选用不同结构,不同规格和不能互换的插座;配套的插头也要按交流、直流或不同电压等级区别使用。15单相二孔插座,面对插座的右孔或上孔与相线连接,左孔或下孔与零线连接;单相三孔插座,面对插座的右孔与相线连接,左孔与零线连接;单相三孔,三相四孔及三相五孔插座的接地(PE)或接零(PEN)线接上孔。插座的接地端子不与零线端子连接。同一场所的三相插座、接线的相序一致。接地(PE)或接零(PEN)线在插座之间不串联连接。16接插有触电危险家用电器的电源,采用能断开电源带开关插座,开关断开相线,用于潮湿场所密封型带保护地线触头的保护型插座,安装高度不低于1.5m。17;
43、同一建筑物、构筑物的开关采用同一系列产品,开关安装的通断方向位置一致照明线路的相线经开关控制;民用住宅无软线引至床边的床头开关。18吊扇挂钩安装牢固,吊扇挂钩的直径不小于吊扇挂锁直径且不小于8mm;装有防振橡胶垫,挂锁的防松部件齐全可靠;扇叶离地高度大于(等于)2.5m,吊扇组装后不改变扇叶角度,扇叶固定螺栓防松零件齐全;吊杆间、吊杆与电机间螺纹连接,啮合长度不小于20mm,防松零件齐全紧固;吊扇接线正确运行时扇叶无明显颤动及异常声响。19壁扇底座采用尼龙塞或膨胀螺栓固定;尼龙塞或膨胀螺栓的数量不少于2个,且直径不小于8mm,固定牢固可靠;壁扇防护罩扣紧,固定可靠,运转时扇叶和防护罩无明显颤动
44、和异常声响。6)避雷接地系统安装工程1人工接地装置或利用建筑物基础钢筋的接地装置必须在地面以上按设计要求位置设测试点;测试接地装置的接地电阻值必须符合设计要求。2埋设在人行通道处的防雷接地的人工接地装置的接地干线埋地深度不应小于1m,且采用均压措施或在其上方铺设卵石或沥青地面;接地模块顶面埋深不应小于0.6m,角钢等模块间距不应小于模块长度的35倍;接地模块埋设基坑一般为模块外形尺寸的1.21.4倍,在开挖深度内详细记录地层情况;接地模块应垂直或水平就位,不应倾斜设置,保持与原土层良好接触。3设计无要求时,接地装置顶面埋设深度不应小于0.6m;钢管、角钢、园钢等接地极应垂直埋入地下,间距不小于5m。接地装置应采用搭焊接,搭接长度应符合下列规定:扁钢与扁钢搭接为扁钢宽度的2倍,不少于三面施焊;园钢与园钢搭接为园钢直径的6倍,双面施焊;园钢与扁钢搭接为园