《磨盘山水库供水工程粘土心墙土石坝工程及附属工程投标文件.doc》由会员分享,可在线阅读,更多相关《磨盘山水库供水工程粘土心墙土石坝工程及附属工程投标文件.doc(232页珍藏版)》请在三一办公上搜索。
1、evaluation of scientific development. Nature security type-nature security is to maintenance people of health value for target, through strengthening security based management, and risk management, and equipment management and technology supervision, ensure production in the people, and real, and sy
2、stem, and system, elements security reliable, and harmony unified, full control various against factors, achieved thought no slack, and management no empty document, and equipment no hidden, and system no blocked, and unit zero non-stopped. Quality and efficiency-quality benefit is to adhere to the
3、enterprise survival, profit and development business truth, adhere to the all activity is economic activity, all costs can be controlled, money should not be wasted management philosophy, management analysis, to improve management quality, improve cost control capacity and market competitiveness. In
4、novation of science and technology-science and technology innovation is to play the role of science and technology as the primary productive force, active use of new technologies, new materials, new processes, new equipment, increase investment in science and technology, strengthening scientific and
5、 technological training, speeding up transforming scientific and technological achievements, forming a number of proprietary technology, enhancing core competitiveness. Resource-saving-the-resources saving enterprise was to reduce coal consumption, water consumption, electricity at the core, enhance
6、 the operation of lean management to realize low consumption, high efficiency, reduce production costs. Second is to strengthen the business, financial, material, information and the optimization of organization and management, saving the internal transaction costs. Harmonious development of harmoni
7、ous development-is to construct a foreign environment for development. XING refers to the internal security firm and internal management of the internal management measures are effective, harmonious. Foreign currency means Enterprise coordinating development of homeopathy, well, get along with the n
8、eighbors better. (B) XX 2013 five enterprises building intrinsic safety power company goals are: unplanned outage 0 times. Class of disorders 0, 0 is equivalent forced outage rate. No personal injury accident, material and equipment accidents do not occur, no fire, no environmental pollution acciden
9、t. Enterprise integrated to achieve zero cases of violation, zero accidents, zero. Quality goal is: when generating capacity 7.5 billion-kilowatt, sales of over 7.11 billion kWh, total profits of 306.6 million Yuan, . BFS+、PI、MIS、SCM Information systems infrastructure, fully integrated information s
10、ystem to realize information resources sharing; to expand the breadth and depth of the portal system, information system of Enterprise Management Assistant role to play; to improve the day-to-day operation and maintenance operation record of promoting causes and transfer system; to strengthen the tr
11、aining磨盘山水库供水工程粘土心墙土石坝工程及附属工程 投标文件第一章 施工总体说明11 工程概况111 地理位置磨盘山水库位于拉林河干流上游五常市沙河子乡沈家营村上游1.8km附近,距河口343km,坝址距哈尔滨市区约180km。坝址以上流域面积1151km2。112 工程规模磨盘山水库是一座以为哈尔滨市供水为主,兼向下游沿线城镇供水并结合防洪、灌溉等综合利用的控制性水利枢纽工程。水库规模为大()型,工程等别为等,主要建筑物为级,次要建筑物为级,临时建筑物为级。水库设计标准为100年一遇洪水,校核洪水为5000年一遇洪水。113 库容和调节性能水库调节性能为多年调节,其总库容为5.231
12、08m3,调节库容3.23108m3,死库容0.33108m3。114 工程总布置及主要建筑物水库枢纽工程由粘土心墙土石坝、右岸开敞式溢洪道、导流灌溉洞、供水洞组成。坝顶高程324.50m,坝顶长度406m,最大坝高49.9m。溢洪道紧邻右坝肩,由进口段控制段泄槽及挑流消能段组成,单孔,净宽12m,堰顶高程310m,设弧形闸门工作闸门和平板检修闸门。导流灌溉洞位于右坝肩与溢洪道之间,隧洞进口底高程280.00m,洞长200m,洞径4.0m,进口设取水塔分层取水,出口设工作闸门,挑流消能。供水洞位于溢洪道右侧,进口位于坝轴线上游约200m,由取水塔和引水隧洞组成,隧洞洞径3.2m,洞长1377.
13、73m。本标段为水库枢纽粘土心墙土石坝标。115 施工进度计划2003年13月进行准备工作,4月中旬主体工程开工。首先施工左岸,在2004年8月底,将左岸填筑至313.6m高程。2004年9月中旬进行主河道截流,开始填筑右岸坝体(主河床段),截流闭气后先填筑混凝土防渗墙施工平台,在9月末之前将混凝土防渗施工平台填筑至288.00m高程,为混凝土防渗墙施工提供出作业面,在2004年年末将整个右岸坝体填筑至288.0m高程,2005年大汛前,将右岸坝体填筑至313.6m高程。2005年9月初,导流灌溉洞下闸,水库开始蓄水。2005年11月末将整个坝体填筑至设计高程。116 开挖料的利用本工程拦河坝
14、所用石料直接取于大坝、溢洪道、导流灌溉洞、供水洞开挖的弱风化、微风化及新鲜岩石或转运场石料,覆盖层及强风化石料用于筑路或运至弃渣场堆放。12 水文气象和工程地质121 水文气象本工程坝址以上多年平均降水量800mm左右,年内分配极不均匀,其中69月份占降水量80%左右,汛期降雨多集中在78月份,各时段不同重现期施工洪水成果见表11。表11施工期各时段不同重现期洪峰流量表 单位:m3/s 重现期时段200年100年50年20年10年5年春汛开河(45月)202167140127大汛(78月)251021001200838秋汛(910月)11982.09月平均流量37.228.310月平均流量28
15、.321.445月日均最大流量139.9111.3坝址天然河道水位、流量详见表12。表12 坝址天然河道水位流量 断面水位(m)流量(m3/s)坝上100m坝址坝下100mHHH100280.08280.02280.0152280.56280.45280.4200280.80280.72280.7505281.95281.85281.7838282.80282.66282.51200283.55283.38283.21706284.50284.34284.22102285.20285.00284.8坝址地处山区,气候严寒,多年平均气温3.5左右,极端最高气温35.5。土壤最早冻结时间为10月3
16、1日,最晚融冻时间为4月8日,最大冻深2m。融冻流冰期平均4月9日;结冰流冰期平均11月18日;春季流冰期平均2天;秋季流冰期平均6天;封冻天数平均143天。最大冰厚平均1m厚;最大冰上雪深0.17m。最大冰块长约20m,宽约8m,流速约0.9m/s。122 工程地质坝址区河谷呈不对称的“V”字型,河床宽50m60 m,河床两侧发育有10m20 m宽的狭长形河漫滩,滩面稍有起伏,地面高程为280 m 282 m。右岸山坡坡度4560,山脚与河漫滩相连,左岸为山前倾斜台地,地面坡度约为1015,前缘与河漫滩相连,台地宽度大于200 m。坝址区主要由第四系和侵入岩组成,自上而下可见:1第四系全新统
17、冲洪积层(al+plQ4)(1)卵石混合土:灰黄色,密实,磨圆较好,成分多由花岗岩和玄武岩组成,局部见有漂石,最大块径可达3m5m,厚5 m7m左右,透水性强;分布于河床部位,层底高程为270m左右;本层在顺河方向上厚度较稳定。(2)含细粒土细砂:黑褐色黄(灰)褐色,松散,厚度为2.00 m3.20m;分布于漫滩上部,层底高程为278.07m278.71m;本层在顺河方向上厚度变化不大。(3)卵石混合土:灰黄色,密实,磨圆较好,成分多由花岗岩和玄武岩组成,局部见有漂石,最大块径可达3m5m,厚3 m7m,透水性强;分布于漫滩下部,层底高程为271.00m275.21m;本层在顺河方向上厚度较稳
18、定。2第四系更新统坡积、洪积层(dl+plQp)碎石混合土:黄色,以碎石为主,夹杂低液限粘土、块石、砂等,局部见有漂石,颗粒大小混杂,无定向排列,无架空现象,较密实,厚约11.87m39.66m;渗水试验表明,渗透系数在1.2410-5cm/s左右,属弱透水。主要分布在坝址左岸台地上,另外在右岸山前坡脚处表层呈窄条带状分布,层底高程为274.81m283.07m;本层在顺河方向上厚度变化不大,自前缘向后缘方向厚度增厚,左坝肩部位厚度在38.88m39.66m。3第四系更新统冲洪积层(al+plQp)卵石混合土:灰黄色,较密实,含少量砂和泥质成分,局部见有漂石,最大块径可达3m5m,厚度为2.6
19、0 m5.65m,渗透系数20m/d左右,属中等强透水。分布在左岸台地下部,层底高程为273.50m269.16m;自上游向下游厚度有逐渐变薄的趋势。4印支期侵入岩(51-3b)花岗岩:中粗粒花岗结构,块状构造,主要矿物成分为斜长石、碱长石、石英等。分布在河谷底部及右岸,本次揭露最大厚度大于50m。基岩面的起伏情况基本与地面的起伏情况相同,左岸较平缓,坡度在10左右;右岸岩体直接裸露,坡度较陡在40左右;岩面高程左坝肩处为270.34m275.95m,在靠近河漫滩部位岩面高程在266.26m269.16m。右坝肩岩体节理裂隙较为发育,见表13。主要有5组,其中1、2两组最发育,均为高倾角、张性
20、,裂隙间有少量充填物。表13 右坝肩节理统计表序号走向倾向倾角条数面积特 征度条m1330-34260-7280-884116.6张开裂隙,张开宽度0.5cm-1.0cm。260-65150-15558-70115.1张开裂隙,充填物为高岭土。3114-125204-21525-4032.0缓倾角,闭合,不发育。4320-325230-23568-85411.5张开5mm,少量泥质充填。56233254411.5闭合。坝址区右岸坝肩部位见有两条断层,走向近南北,倾向分别为80、82,倾角分别为38、80,压性;破碎带宽度1.20-1.70m,规模较小。坝址区主要分布孔隙潜水及孔隙弱承压水。孔隙
21、潜水赋存于河漫滩第四系松散层中,含水层为含细粒土细砂和混合土卵石,厚3.5 m5.0m,地下水位埋深为13m,高程在278.71m左右。含细粒土细砂层的渗透系数为2 m/d5m/d,卵石混合土层的渗透系数为50m/d左右。补给来源主要为大气降水、侧向径流和拉林河水的渗入,以径流和蒸发的形式排泄。孔隙弱承压水埋藏于左岸山前倾斜台地底部的卵石混合土层中,顶板埋深为10m39m;承压水头3.44m8.20m,埋深7.74m30.80m,高程在276.25m285.20m;渗透系数20.5m/d40.33m/d左右,中等-强透水。河谷及左岸浅部强风化全风化带及弱风化带上部岩体和右岸卸荷带岩体及弱风化带
22、上部为中等透水岩层(厚度5 m15m),其下及右岸岩体为弱透水极微透水岩层。13 天然建筑材料131 粘土料粘土料场位于坝址下游右岸沈家营村东北的山前倾斜台地上,占地面积30104m2,该料场地形起伏较大,地面高程在297.25 m306.07m,均为耕地(旱田),距坝址约2.0km,运距较近。无用层较薄,有用层厚且连续,开采方便,适于机械化开采和运输。有农道通至料场边缘。勘探深度内主要为粘性土层,个别钻孔底部见有基岩,现自上而下分述如下:有机质土:黑色,富含有机质,为耕植土层,层厚0.20.4m。普遍分布于表层,个别地段见有薄层人工填土。低液限粘土:黄色,稍湿,粘性较强,含较多粉粒,层厚5.
23、0m左右,钻孔揭露最大厚度为10m,普遍分布于层之下,层厚稳定连续,局部地段在深度为2.00m以下见有薄层中粗砂。花岗岩:褐色,全风化强风化状,顶面高程在297.80m左右,普遍分布于粘土层之下。勘探深度内未见地下水位。根据有用层开采意义及含水量条件,将本料场划分为三个区,即区为优先开采区、区为控制开采区、区为无开采意义区。 本料场区土除个别样品粘粒含量稍高外其它各项物理力学性质指标可以满足土石坝防渗体对土料的质量要求,本料场区土的各项物理力学性质指标中,除天然含水量较高和个别样品粘粒含量稍高,其他各项指标基本可以满足土石坝防渗体对土料的质量要求,采取一定的工程措施后可以用做土石坝防渗体土料。
24、料场区土料物理力学指标详见下表。项目统计组数比 重液 限塑 限塑性指数颗粒组成百分数(%)击实砾粒砂粒粉粒粘粒最大干密度最优含水率细粗中细GsLpIP粒径以毫米计(mm)dmaxW0p%20-22-0.50.5-0.250.25-0.0750.075-0.050.05-0.0050.005g/cm3%最大值112.7236.022.414.316.79.44.34.79.360.834.91.8224.50最小值112.6727.518.58.11.82.10.81.60.332.318.51.7015.80平均值112.6932.320.312.06.95.13.12.93.950.526.
25、71.7518.08表1-4区粘土料场物理力学指标表本料场的粘土料储量丰富,剥离层平均厚度为0.6m左右,有用层平均厚2.71m5.08m,优先开采区即区防渗体粘土料净储量为34.5104m3,接近设计用量的2倍,控制开采区区防渗体粘土料净储量为34.1104m3,完全可以满足工程的需要。用做土石坝防渗土料其质量基本能满足技术要求。料场占地为旱田,并需修建临时施工道路。132砂砾料1砂砾料场料场位于坝址上游河左岸的河漫滩上,距坝址1.0 km 2.0 km,地面高程为285.00m288.36m之间。料场可见岩性自上而下描述如下:有机质土:黑褐色,含植物根系,厚0.20m0.50m。级配不良细
26、砂:黄褐色,粉细砂含量较高,该层较连续,厚0.4m1.5m。卵石混合土(或混合土卵石):杂色,饱水,分布连续稳定,勘探深度内厚2.0m2.6m。局部见有级配不良中、粗砂透镜体。2砂砾料场料场位于下坝址下游河右岸的河漫滩上,距坝址2.0 km 3.0km,地面高程为274.90m279.00m之间,料场可见岩性自上而下描述如下:机质土:黑褐色,含植物根系,厚0.20m0.50m。粉土质细砂:黄褐色,粉细砂含量较高,该层较连续,厚0.4m1.5m。卵石混合土(或混合土卵石):杂色,饱水,分布连续稳定,勘探深度内厚2.0m2.6m。局部见有级配不良中、粗砂透镜体。两个砂砾料场的砂砾料基本可以满足土石
27、坝坝壳填筑料对砂砾料的质量技术要求。砂砾料由业主开采,然后集中到砂砾料转存料料场。转存料场距离坝址2.5公里。碱活性反应试验成果表明混凝土细骨料不存在潜在危害。两处料场砂砾料含泥量较高,用做混凝土骨料还需进行冲洗。表1-5 储量计算一览表料场编号岩性无用层厚有用层厚产地面积剥离层体积有用层储量水上水下水上水下合计mm104m2104m3104m3卵石混合土1.420.962.6320.3328.8719.5253.4772.99卵石混合土1.331.272.3421.027.9326.6749.1475.81 砂砾料颗分详见表16表16砂砾料颗分表料场粒 径(毫米)150150-8080-40
28、40-2020-505-2.52.5-1.252.5-0.630.63-0.3150.315-0.1580.158含 量()料场试验组数1010101010101010101010平均值22.8625.9410.958.306.991.643.355.868.832.792.49最大值45.6031.6018.7015.5011.522.515.1716.0518.976.394.78最小值13.209.002.403.103.030.721.492.733.990.760.92料场试验组数99999999999平均值14.7123.7314.318.768.461.894.298.5410.
29、102.542.68最大值18.731.2021.6013.6016.293.339.4815.3214.214.226.84最小值6.7015.0010.004.102.800.822.313.287.440.720.4314 合同项目和工作范围本标段主要工程项目包括土石坝、永1号路、永3号路、临时工程、大坝安全监测等工程。141 土石坝拦河坝为粘土心墙土石坝,坝顶长度为406m,最低建基面为274.6m,最大坝高49.9m。坝顶宽8.0m ,坝顶高程为324.50m。坝顶设钢筋混凝土防浪墙,墙顶高程为325.70m,墙底高程接粘土心墙顶高程,坝顶设沥青混凝土路面,厚6cm。粘土心墙顶高程为
30、322.50m,宽3.0m,心墙坡比1:0.25,河床段心墙底高程为284.00m,下接混凝土防渗墙。粘土心墙上、下游侧设中粗砂、砂砾石反滤层各一层,每层厚度均为1.5m。坝壳料为砂砾石,上游边坡为1:2.0,在高程295.66m处结合围堰设5.0m宽马道,马道以上设砼板护坡厚为20cm,马道以下坝体兼作围堰,围堰采用粘土斜墙防渗,斜墙下游设砂砾石过渡层与坝体相接,斜墙上游用石渣护坡。下游坝体边坡为1:2.0,设碎石护坡厚20cm。在292.50m高程处设马道兼作通往导流灌溉洞出口的交通路,宽5.0m,沥青混凝土路面厚6cm,下设碎石垫层20cm。坝脚处设排水棱体,排水棱体顶高程为283.9m
31、,排水棱体顶宽2.0m,外坡坡比为1:1.5,坡脚处设排水沟,排水沟底宽1.0m,边坡1:1.5,深1.0m。142 永1号路永1号路即左岸上坝公路,由坝下交通桥至左坝端,总长度1037 m,行车道宽为6.0。路基填筑压实度要求达到0.9。路堤边坡坡度1:1.5,沥青混凝土路面,厚6cm,下设水泥稳定砂和碎石垫层各20cm。143 永3号路永3号路即去接管点公路,由坝下交通桥至供水洞出口,总长度1110 m,行车道宽为6.0。路基填筑压实度要求达到0.9。路堤边坡坡度1:1.5,沥青混凝土路面,厚6cm,下设水泥稳定砂和碎石垫层各20cm。144 临时工程1大坝上、下游土石围堰上下游围堰顶高程
32、分别为295.66m、280.7m。上游围堰长169m,最大高度17.96m,下游围堰长82m,最大高度3.0m,上下游围堰形式相同,均采用粘土斜墙砂砾石围堰,上游围堰上下游边坡分别为1:3、1:2.0,下游围堰上下游边坡分别为1:3、1:1.5,围堰顶宽均为6m。上游围堰砂砾石部分与坝体结合。2坝体护砌左岸坝体填筑时,为防止大汛洪水淘刷坝体,在左岸坝体右侧用块石护砌。护坡顶高程为283.2m。最大护坡高度5.5m,护砌范围200m,厚30cm,块石下设15cm碎石垫层,坝体下游采用厚度为50cm耐特笼块石护砌,护砌长度20m。3临时道路临3#路,长500m;临4#路,长1200m;临6#路,
33、长550m;临7路,长180m。15 现场施工条件1.5.1 交通运输1对外运输本枢纽工程交通运输较便利,山河镇国铁车站,距坝址约69公里,可作为转运站,经拉滨线南下可达吉林,北上可至哈尔滨。本工程公路运输也较方便,等级公路自哈尔滨市经五常市通至寒葱河,并连接非等级公路至沙河子镇,其中山河镇至沙河子镇系三级砂石公路,路况良好,有桥梁多座,仅东信桥与大方桥标准低且破坏严重,需要修建。自沙河子镇至坝址附近的沈家营屯,距离约10公里,为乡间路,宽45米,路况一般,需进行维修扩建。自沈家营屯至坝址距离约2公里,目前无路,需新建。2场内交通场内交通主要利用本段标新修永1号路、永3号路及临3号、临4号、临
34、6号、临7号道路,还有其它标段修筑的永2号、临1号、临2号、临5号、临8号道路。1.5.2 施工、生活用水由招标文件知,拉林河河水能满足生活、生产需要,可直接用于本工程施工和施工人员生活。1.5.3 施工用电本工程用电接入点在管理区,距坝轴线1km,电压10kv,容量2000KVA,该接点至施工区和生活区的输电线路、配电线所及其余全部配电装置和功率补偿装置由施工方负责。1.5.4 材料供应本标段所用钢筋、水泥、砂砾料、块石、砼骨料等主要材料由业主供应,钢筋、水泥运至施工单位仓库,砂砾料、块石等坝体填筑料运至转运料场,砼骨料运至砼拌和站。16 控制性工期2003年3月下旬进场,4月1日正式开工;
35、2004年8月底将坝体左岸填筑至313.6m高程;2004年9月初进行围堰施工,2004年9月10日截流;2004年9月底将坝体右岸288.0m高程下防渗墙施工平台填筑完成,提供基础处理施工平台,2004年11月15日将坝体右岸填筑至288.0m高程;2005年4上旬开始填筑坝体右岸288.0m高程以上部分,2005年6月30日之前将右岸坝体填筑至313.6m高程;2005年8月5日整个坝体填筑至322.5m高程,开始进行坝顶防浪墙施工,2005年8月31日之前坝顶防浪墙、322.5m高程下上游砼板护坡全部完成;2005年9月30日之前完成坝体剩余部分施工,包括上游砼板护坡、下游坡面砌石、碎石
36、施工,进行坝顶路基、沥青砼路面施工,2005年10月25日土石坝工程全部完成2005年8月初进行永3号路、永1号路面施工,包括碎石路基、水泥稳定砂、沥青砼路面,2005年10月20日全部完工17 工期、质量、安全目标171 工期目标按期实现各控制性进度,优质、高效地完成本标段施工,是施工进度计划的根本控制目标。172 质量目标我们的质量目标:单元工程合格率100%、单元工程优良率90%、工程质量达到优良等级。173 安全目标本合同施工安全管理目标是:“四无一杜绝一创建”。“四无”即无工伤死亡事故,负伤率3以下,无重大机械设备事故,无交通死亡事故,无火灾、洪灾事故;“一杜绝”即杜绝重伤事故;“一
37、创建”即创建安全文明工程。贯彻“安全第一、预防为主”的宗旨,坚持“安全为了生产,生产必须安全”的原则,做到思想保证、组织保证、技术保证、措施保证、确保人员、设备及工程安全。18 主要施工方法简述本标段施工项目主要有坝基开挖、清理、碾压、坝体填筑、砼浇筑、砌石等。河床段及左岸坝基清理主要采用D85推土机集料成堆,3.0 m3装载机配15-20自卸汽车运输弃料,右坝肩石方开挖采用爆破方法自上而下分层开挖,3.0 m3装载机配15-20自卸汽车运输开挖弃料。基础部位碾压采用15t轮胎碾碾压。坝体填筑采用3.0 m3装载机料场装车,15-20自卸汽车运输上坝,塑性填土区采用15t轮胎碾碾压,坝壳料采用
38、振动碾分层碾压。砼浇筑采用6 m3砼搅拌车或8t自卸汽车运输,砼输送泵或吊车入仓浇筑。砌体主要采用8t自卸汽车运输块石,人工自下而上砌筑。第二章 施工导流和水流控制21 水文气象磨盘山水库位于拉林河干流上游,坝址控制流域面积1151km2,坝址以上多年平均降水量800mm左右,年内分配极不均匀,其中69月份占降水量80%左右,汛期降雨多集中在78月份,各时段不同重现期施工洪水成果见表2-1,坝址天然河道水位、流量详见表2-2。坝址地处山区,气候严寒,多年平均气温3.5左右,极端最高气温35.5,冬季最低气温-39,初霜期9月中下旬,终霜5月中旬,无霜期110140天。土壤最早冻结时间为10月3
39、1日,最晚融冻时间为4月8日,最大冻深2m。融冻流冰期平均4月9日;结冰流冰期平均11月18日;春季流冰期平均2天;秋季流冰期平均6天;封冻天数平均143天。最大冰厚平均1m厚;最大冰上雪深0.17m。最大冰块长约20m,宽约8m,流速约0.9m/s。表2-1施工期各时段不同重现期洪峰流量表 单位:m3/s 重现期时段200年100年50年20年10年5年春汛开河(45月)202167140127大汛(78月)251021001200838秋汛(910月)11982.09月平均流量37.228.310月平均流量28.321.445月日均最大流量139.9111.3表2-2 坝址天然河道水位流量
40、 断面水位(m)流量(m3/s)坝上100m坝址坝下100mHHH100280.08280.02280.0152280.56280.45280.4200280.80280.72280.7505281.95281.85281.7838282.80282.66282.51200283.55283.38283.21706284.50284.34284.22102285.20285.00284.822施工导流221 施工导流方式本工程施工导流采用主河床一次断流,导流灌溉洞导流的方式,具体导流程序如下:第一阶段:2003年4月中旬开始对河道左岸滩地段坝体进行土方开挖、坝体填筑和基础处理,2004年8月末
41、将左岸坝体填筑至313.60m高程,此阶段利用原河床导流;第二阶段:2004年9月上旬开始河道截流,修筑断流围堰,挡水标准为20年一遇春汛洪水,在围堰的保护下进行右岸坝体的基础处理及坝体填筑,至2005年6月末将右岸坝体填筑至拦挡200年一遇大汛洪水位以上,此阶段洪水由灌溉洞渲泄;第三阶段:2005年7月坝体继续填筑,同年11月末将坝体填筑至设计高程。这期间大汛洪水由灌溉洞及溢洪道泄流。222 施工导流时段及标准各建筑物的导流及度汛标准:1截流前原河床导流,导流标准为大汛十年一遇洪水,最大洪峰流量为838.0 m3/s;2大坝上、下游围堰挡水标准采用20年一遇春汛洪水,日均最大流量169 m3
42、/s;3坝体填筑到不需要围堰保护时,坝体的度汛标准为200年一遇洪水,最大洪峰流量为2510m3/s。施工导流特性见下表。表2-3 施工导流特性表施工年月导流时段重现期(年)流量(m3/s)导流方式2003大汛10838原河道2004年18月大汛10838原河道2004年9月2005年6月春汛20169灌溉洞2005年7月8月大汛2002510灌溉洞、溢洪道223 围堰布置、结构及工程量1大坝上、下游土石围堰上下游围堰顶高程分别为295.66m、280.70m。上游围堰长169m,最大高度17.96m,下游围堰长82m,最大高度3.0m,上下游围堰形式相同,均采用粘土斜墙砂砾石围堰,上游围堰上
43、下游边坡分别为1:3.0、1:2.0,下游围堰上下游边坡分别为1:3.0、1:1.5,围堰顶宽均为6m。上游围堰砂砾石部分与坝体结合。2坝体临时护砌左岸坝体填筑时,为防止大汛洪水淘刷坝体,在左岸坝体右侧用块石护砌。护坡顶高程为283.2m。最大护坡高度5.5m,护砌范围200m,厚30cm,块石下设15cm碎石垫层,坝体下游采用厚度为50cm耐特笼块石护砌,护砌长度20m。表2-4 围堰工程量表序号工程项目单位工程量备注1砂砾石填筑m327762粘土填筑m3207703石渣填筑m337664碎石垫层m33125抛石护底m32206耐特笼块石m31207干砌块石m36258围堰拆除m327692
44、3 施工截流231 截流时段及标准根据招标文件及施工总进度安排综合考虑水文气象条件、围堰施工时间、截流工程量和难度,截流时间定为2004年9月上旬,截流设计流量选用5年一遇9月平均流量,流量为28.3 m3/s,相应的上游水位为280.0m高程。232 截流方式本工程截流流量小,为28.3 m3/s,截流难度不大,截流采用单戗立堵,从左右岸同时进占,为减少龙口位置冲刷,截流前对龙口进行抛石护底,合龙顺序为先上游后下游。233 截流戗堤设计及龙口位置的选择根据截流设计标准,截流时段上游水位为280.0m高程左右,导流洞进水口底部高程为280.0m。考虑到上游水位壅高和一定安全超高,戗堤顶面高程为285.