【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc

上传人:sccc 文档编号:5200693 上传时间:2023-06-13 格式:DOC 页数:37 大小:2.16MB
返回 下载 相关 举报
【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc_第1页
第1页 / 共37页
【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc_第2页
第2页 / 共37页
【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc_第3页
第3页 / 共37页
【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc_第4页
第4页 / 共37页
【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc_第5页
第5页 / 共37页
点击查看更多>>
资源描述

《【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc》由会员分享,可在线阅读,更多相关《【BS英国标准】BS EN 61400251 Wind turbines — Part 251 Communications for monitoring and con.doc(37页珍藏版)》请在三一办公上搜索。

1、BRITISH STANDARD BS EN61400-25-1:2007Wind turbines Part 25-1: Communications for monitoring and control of wind power plants Overall description of principles and modelsThe European Standard EN 61400-25-1:2007 has the status of aBritish StandardICS 27.180 BS EN 61400-25-1:2007National forewordThis B

2、ritish Standard was published by BSI. It is the UK implementation ofEN 61400-25-1:2007. It is identical with IEC 61400-25-1:2006.The UK participation in its preparation was entrusted to Technical CommitteePEL/88, Windturbine systems.A list of organizations represented on this committee can be obtain

3、ed on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.Amd. No.DateCommentsThis British Standard was pub

4、lished under the authority of the Standards Policy and Strategy Committeeon 31 May 2007 BSI 2007ISBN 978 0 580 50678 9Amendments issued since publicationEUROPEAN STANDARDEN 61400-25-1NORME EUROPENNEEUROPISCHE NORM February 2007 ICS 27.180English versionWind turbines -Part 25-1: Communications for mo

5、nitoring and control of wind power plants -Overall description of principles and models(IEC 61400-25-1:2006)Eoliennes -Partie 25-1: Communicationspour la surveillance et la commande des centrales oliennes -Description gnraledes principes et modles(CEI 61400-25-1:2006)Windenergieanlagen -Teil 25-1: K

6、ommunikationfr die berwachung und Steuerung von Windenergieanlagen - Einfhrende Beschreibungder Prinzipien und Modelle(IEC 61400-25-1:2006)This European Standard was approved by CENELEC on 2007-02-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the c

7、onditions for giving this European Standard the status of a national standard without any alteration.Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member.This European Standard exists in

8、three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions.CENELEC members are the national electrotechn

9、ical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland an

10、d the United Kingdom.CENELECEuropean Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische NormungCentral Secretariat: rue de Stassart 35, B - 1050 Brussels 2007 CENELEC -All rights of exploitation in any form and by a

11、ny means reserved worldwide for CENELEC members.Ref. No. EN 61400-25-1:2007 EEN 61400-25-1:2007 5 ForewordThe text of document 88/274/FDIS, future edition 1 of IEC 61400-25-1, prepared by IEC TC 88, Wind turbines, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61400

12、-25-1 on 2007-02-01.The following dates were fixed: latest date by which the EN has to be implemented at national level by publication of an identicalnational standard or by endorsement(dop)2007-11-01 latest date by which the national standards conflictingwith the EN have to be withdrawn(dow)2010-02

13、-01Annex ZA has been added by CENELEC.Endorsement noticeThe text of the International Standard IEC 61400-25-1:2006 was approved by CENELEC as a EuropeanStandard without any modification.CONTENTSINTRODUCTION . 41Scope . 62Normative references . 73Terms and definitions . 84Abbreviated terms . 125Overa

14、ll description of the IEC 61400-25 series . 125.15.25.35.4General . 12Top-down view on wind power plants . 13Generic requirements on communication . 14Communication model of the IEC 61400-25 series. 166W ind power plant information model . 196.16.2General . 19Information modelling methodology . 197W

15、 ind power plant information exchange model . 237.17.2General . 23Information exchange modelling methodology . 238Mapping to communication protocols . 298.18.28.3General . 29Architecture of the mappings . 30Mapping of the wind power plant information model . 30Annex ZA (normative) Normative referenc

16、es to international publications with theircorresponding European publications. 31Figure 1 Conceptual communication model of the IEC 61400-25 series . 7Figure 2 Data processing by the server (conceptual). 17Figure 3 Modelling approach (conceptual) . 18Figure 4 Structure of wind power plant informati

17、on model . 21Figure 5 Client and server role . 23Figure 6 IEM Service models . 24Figure 7 Conceptual information exchange model for a wind power plant . 25Figure 8 IEM service model with examples. 27Figure 9 Sequence diagram . 28Figure 10 ACSI mapping to communication stacks/profiles. 29Figure 11 Co

18、mmunication profiles . 30Table 1 Operational functions . 15Table 2 Management functions . 16Table 3 W ind power plant information categories . 20Table 4 General table structure of a logical node (LN) . 22Table 5 Data class attributes in a logical node . 22Table 6 Service table .27INTRODUCTIONThe IEC

19、 61400-25 series addresses vendors (manufacturers, suppliers), operators, owners, planners, and designers of wind power plants as well as system integrators and utility companies operating in the wind energy market. The IEC 61400-25 series is intended to be accepted and to be used world-wide as the

20、international standard for communications in the domain of wind power plants.The IEC 61400-25 series has been developed in order to provide a uniform communications basis for the monitoring and control of wind power plants. It defines wind power plant specific information, the mechanisms for informa

21、tion exchange and the mapping to communication protocols. In this regard, the IEC 61400-25 series defines details required to exchange the available information with wind power plant components in a manufacturer-independent environment. This is done by definitions made in this part of the IEC 61400-

22、25 series or by reference to other standards.The wind power plant specific information describes the crucial and common process and configuration information. The information is hierarchically structured and covers for example common information found in the rotor, generator, converter, grid connect

23、ion and the like. The information may be simple data (including timestamp and quality) and configuration values or more comprehensive attributes and descriptive information, for example engineering unit, scale, description, reference, statistical or historical information. All information of a wind

24、power plant defined in the IEC 61400-25 series is name tagged. A concise meaning of each data is given. The standardised wind power plant information can be extended by means of a name space extension rule. All data, attributes and descriptive information can be exchanged by corresponding services.T

25、he implementation of the IEC 61400-25 series allows SCADA systems (supervisory control and data acquisition) to communicate with wind turbines from multiple vendors. The standardised self-description (contained either in a XML file or retrieved online from a device) can be used to configure SCADA ap

26、plications. Standardisation of SCADA applications are excluded in the IEC 61400-25 series but standardised common wind turbine information provides means for re-use of applications and operator screens for wind turbines from different vendors. From a utility perspective unified definitions of common

27、 data minimise conversion and re-calculation of data values for evaluation and comparison of all their wind power plants.The IEC 61400-25 series can be applied to any wind power plant operation concept, i.e. both individual wind turbines, clusters and more integrated groups of wind turbines. The app

28、lication area of the IEC 61400-25 series covers components required for the operation of wind power plants, i.e. not only the wind turbine generator, but also the meteorological system, the electrical system, and the wind power plant management system. The wind power plant specific information in th

29、e IEC 61400-25 series excludes information associated with feeders and substations. Substation communication is covered within the IEC 61850 series of standards.The intention of the IEC 61400-25 series is to enable components from different vendors to communicate with other components, at any locati

30、on. Object-oriented data structures can make the engineering and handling of large amounts of information provided by wind power plants less time-consuming and more efficient. The IEC 61400-25 series supports scalability, connectivity, and interoperability.The IEC 61400-25 series is a basis for simp

31、lifying the contracting of the roles the wind turbine and SCADA systems have to play. The crucial part of the wind power plant information, the information exchange methods, and the communication stacks are standardised. They build a basis to which procurement specifications and contracts could easi

32、ly refer.The IEC 61400-25 series is organised in several parts. IEC 61400-25-1 offers an introductory orientation, crucial requirements, and a modelling guide.NOTE 1 Performance of the IEC 61400-25 series implementations are application specific. The IEC 61400-25 series does not guarantee a certain

33、level of performance. This is beyond the scope of the IEC 61400-25 series. However, there is no underlying limitation in the communications technology to prevent high speed application (millisecond level responses).NOTE 2 IEC 61400-25-4 is, at the time of the publication of IEC 61400-25-1 (this part

34、), still to be published. W ith IEC 61400-25-4 the mapping of the information and information exchange models to a specific communication profile will be described/defined in detail. IEC 61400-25-4 may consist of more than one normative mapping but at least one of the optional mappings has to be sel

35、ected in order to be in conformance with the IEC 61400-25 series. IEC 61400-25-4 is expected to include the following mappings:W ebservicesIEC 61850-8-1 MMS OPC XML DAIEC 60870-5-104DNP3Each of the different mappings specifies individually which and how information models (IEC 61400-25-2) and inform

36、ation exchange models (IEC 61400-25-3) will be supported. The mapping will only reflect the information model and the information exchange services given in IEC 61400-25-2 and IEC 61400-25-3. The individual selected mapping will as a minimum support the mandatory data and data attributes, and the associated services. A specific mapping may, for implementation reasons or due to underlying properties of the communication protocol used,

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备2025010119号-1

经营许可证:宁B2-20210002

宁公网安备 64010402000987号