凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc

上传人:sccc 文档编号:4830399 上传时间:2023-05-17 格式:DOC 页数:103 大小:1.45MB
返回 下载 相关 举报
凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc_第1页
第1页 / 共103页
凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc_第2页
第2页 / 共103页
凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc_第3页
第3页 / 共103页
凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc_第4页
第4页 / 共103页
凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc_第5页
第5页 / 共103页
点击查看更多>>
资源描述

《凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc》由会员分享,可在线阅读,更多相关《凉山州木里河卡基娃水电站工程首台(1 )机组启动验收(金结及机电).doc(103页珍藏版)》请在三一办公上搜索。

1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .凉山州木里河卡基娃水电站工程首台(1#)机组启动验收(金结及机电)监理工作报告中国水利水电建设工程咨询中南公司卡基娃水电站工程监理部二O一五年

24、一月 批准:辛文波审核:陈军国 编写:刘兴明 廖龙 彭雄 4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate documentation.

25、4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application there shall be

26、no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 20021980) rule

27、s of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating range must not

28、exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount determines after

29、 the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of the interim

30、measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of

31、 tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a separate comput

32、ation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification documents a

33、nd solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format. Application

34、 of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency acknowledged

35、 the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent . 目 录1 工程概况11.1 工程建设基本情况11.2 工程监理范围21.3 工程施工概况32 监理管理工作情况42.1 监理组织机构设置和人员配置42.2 监理目标、依据、程序、制度72.3 监理质量管理机构、职责与制度112.4 监理试验检测方法与设备392.5

36、监理措施403 施工单位质量保证体系的评价与管理414 机电设备及金属结构安装进度形象414.1 金属结构安装进度形象414.2 机电设备安装进度形象425 施工质量控制475.1 闸门制造、安装与启闭设备安装工程质量控制475.2 金结埋件安装质量控制485.3 闸门安装质量控制495.4 固定卷扬式启闭机安装质量控制505.5 压力钢管制作与安装工程质量控制705.6 厂房主机设备安装与调试工程质量控制725.7 电气设备安装与调试质量控制785.8 主变设备安装与调试质量控制805.9 500KV GIS设备及出线设备安装与调试质量控制845.10 封闭母线安装与调试质量控制845.11

37、 辅机系统安装与调试质量控制895.12 计算机监控系统、继电保护安装与调试质量控制915.13 交、直流系统安装与调试质量控制935.14 厂房桥机安装与调试质量控制946 工程质量验收976.1 工程项目依据976.2 工程项目划分的原则976.3 工程项目划分的程序976.4 工程项目划分976.5 分部工程验收986.6 单位工程验收997 结论991 1 工程概况1.1 工程建设基本情况卡基娃水电站系木里河干流河段“一库六级”开发方案中的第二级电站,位于四川省木里县唐央乡,坝址距木里县城约178km,距西昌市约424km。水库正常蓄水位为2850m,相应库容3.583亿m3死水位28

38、00m,相应死库容0.777亿m33本工程采用混合式开发,枢纽建筑物主要由混凝土面板堆石坝、放空洞、1号泄洪洞(左岸竖井旋流非常泄洪洞)、2号泄洪洞(右岸泄洪洞)和引水发电系统等组成。拦河大坝为混凝土面板堆石坝,坝顶高程2856m,河床段趾板建基面高程2685m,最大坝高171m,坝顶长323m,坝顶宽11m。放空洞布置于左岸,为有压接无压洞,后段采用龙落尾方式与导流洞结合。1号泄洪洞布置于左岸,为非常泄洪洞,采用竖井旋流消能,通过竖井后采用平面交叉方式与导流洞结合,下平段后段与导流洞结合。2号泄洪洞布置于右岸,为有压接无压泄洪洞,进口布置于则窝沟下游侧沟口附近,与电站进水口并排布置,进口底板

39、高程2795m。引水发电系统布置于右岸。引水隧洞全长约6.36km,隧洞断面型式为圆形,内径为8.2m,衬砌厚度0.30.8m。调压井采用开敞式,井筒底板高程2763.6m,井口顶高程2898m,井筒高度为134.4m,内径18.2m,井筒开挖直径21.2m,衬砌厚度1.5m。压力管道采用一条主管经两级三个对称Y型岔管向四台机组供水的联合供水布置方式,全长约547m,全线采用钢板衬砌,主管内径6.6m,次主管内径4.5m,支管内径3m。发电厂房布置于瓦郎沟沟口上游约1.9km处,为地面厂房。主机间与安装间平行于河流呈“一”字型布置,GIS楼布置于主机间前后侧,副厂房布置于安装间后侧。机组安装高

40、程2560.70m,安装4台立轴混流式水轮发电机组。工程参建单位及标段划分业主单位:四川华电木里河水电开发有限责任公司设计单位:中国水电顾问集团成都勘测设计研究院监理单位:中国水利水电建设工程咨询中南公司施工单位:见表1.1-1。表1.1-1 卡基娃水电站主要项目施工单位一览表序号项目名称承包人合同签订日期1导流洞标中铁隧道集团有限公司2008.3.182大坝标中国葛洲坝集团股份有限公司2009.6.203引水工程1标重庆中环建设有限公司2009.6.204引水工程2标中铁二局集团公司2009.6.205引水工程3标葛洲坝集团第五工程有限公司2009.6.206砂石系统工程中国水利水电第八工程

41、局2009.9.307泄水建筑物工程葛洲坝集团第五工程有限公司2010.12.058厂区枢纽工程中国水利水电第八工程局2010.12.059左右岸变形体工程葛洲坝集团第五工程有限公司2011.07.1010安全监测系统中国水利水电第七工程局2010.07.2611大坝帷幕灌浆工程北京振冲工程股份有限公司2011.11.2512机电安装工程中国水利水电第五工程局2013.5.281.2 工程监理范围1.2.1监理内容依据监理合同做好卡基娃工程建设中的“四控制”、“二管理”、“一协调”工作。协助业主完成对卡基娃工程建设的现场管理,并按期提供与工程建设相关的监理文件和成果报告。1.2.2监理服务范围

42、本合同监理服务工作范围是:木里河卡基娃水电站工程主体工程及其附属工程的全过程全面监理。其监理服务范围主要包括(但不限于):(1) 施工导流工程:包括基坑排水、导流建筑物等;(2) 混凝土面板堆石坝工程;(3) 泄洪及放空洞工程:包括右岸泄洪洞、左岸非常泄洪洞及放空洞等;(4) 引水发电系统工程(含电站进水口、引水隧洞、调压井、压力管道、电站厂房、尾水渠、开关站及基础处理等);(5) 卡基娃滑坡整治工程;(6) 生态环保机组;(7) 工程监测(包括主体工程及其附属工程的安全监测和水利学观测等全部各种监测和观测工程); (8) 金属结构、机电设备安装工程(主要包括:导流洞、放空洞、泄洪洞及引水发电

43、系统闸门、拦污栅及启闭机安装,压力管道制作安装,混流式水轮发电机组安装、机组辅助设备与消防系统工程和GIS开关站电气设备安装,生态环保机组金结及机电设备等);(9) 附属工程,主要包括:料场开采,砂石加工系统及混凝土系统,大坝垫层料加工,施工风水电通讯系统,综合加工厂,业主营地、业主临时营地及施工营地,场内交通工程(道路、桥梁、隧道等),弃渣场及其整治工程,施工支洞及厂房围堰工程,整个工程的环境保护与水土保持工程,消防工程及主体工程所涉及的所有附属工程。1.3 工程施工概况1.3.1 混凝土面板堆石坝施工概况混凝土面板堆石坝工程主要任务包括:左岸坝肩开挖及处理、右岸坝肩开挖及处理、基础开挖及处

44、理、趾板及周边缝止水、坝基及坝肩防渗、混凝土面板及接缝止水、垫层料及过渡料、堆石体、上游铺盖和盖重和坝顶等。1.3.2 泄洪及放空洞施工概况泄洪及放空洞工程主要施工任务包括:1#泄洪建筑物、2#泄洪建筑物、放空洞建筑物、导流洞三洞合一段及导流洞堵头封堵等。1.3.3 引水隧洞及压力管道施工概况引水进口塔体及引水隧洞(引0+000引0+050)由C3-2标承建。引水隧洞(引0+050引0+050、管0+00.0管0+00.0)分别由C4-1、C4-2、C4-3、C4-4标承担(压力管道C4-4标承建),包括支洞开挖与支护、引水隧洞开挖与支护、引水隧洞衬砌、灌浆及支洞封堵等。调压井明挖与支护、井筒

45、开挖与支护、衬砌、固结和回填灌浆由C4-3标承担。1.3.4 地面发电厂房及生态发电施工概况地面发电厂房土建施工任务主要包括:压力管道、3-1#施工支洞、4#施工支洞、地面发电厂房、220GIS楼及厂区周边附属设施安装等。生态发电厂房土建施工任务主要包括:压力管道及发电厂房及厂区周边附属设施安装等。1.3.5 安全监测施工概况根据已下发的设计文件和招投标文件约定,卡基娃水电站安全监测系统工程施工的主要项目有:变形监测(水平位移和沉降位移)、渗流监测、水力学监测和环境量监测、应力应变、资料整理及分析等。2 监理管理工作情况2.1 监理组织机构设置和人员配置中国水利水电建设工程咨询中南公司(以下简

46、称:中南公司)根据本工程监理工作的职能设置监理组织机构,并在工地设立现场监理机构-卡基娃水电站工程监理部,详见监理部组织机构框图。监理部在中南公司领导下,实行总监理工程师负责制,统一领导监理部各级监理人员开展工作。总监理工程师代表中南公司全面履行卡基娃水电站工程监理合同规定的监理职责,对业主及工程质量负责。97监理部设总监1人、副总监1人、总工1人(由副总监兼任),下设6个分部(大坝工程部、引水工程部、厂房工程部、金结机电部、试验检测部、合同信息部)。大坝工程设部长1名,副部长1名;引水工程部、金结机电部、试验检测部、厂房工程部、合同信息部各设部长1名。部门下根据需要设项目组长/专业监理工程师

47、。形成对所监理的工程项目进行分部位监理与专业监理相结合的矩阵管理模式,以确保监理工作的灵活机制和相互监督机制。在监理实施过程中,根据需要由总监理工程师聘请公司总部的专家担任本工程的技术顾问,对工程建设中出现的重大技术问题进行技术咨询和指导。公司总部是驻地监理机构的坚强后盾。监理机构设置如图3.1-1所示。后勤管理组信息管理组合同管理组测量监测组试验检测组安全环保组大坝工程部引水工程部厂房工程部金结机电部总监咨询专家组试验检测部合同信息部副总监、总工图3.1-1卡基娃水电站工程监理部组织机构框图2.2 监理目标、依据、程序、制度2.2.1 质量方针中南公司的质量方针是“科学管理、技术先进、保证质量、信守合同、业主满意”。卡基娃水电站工程监理部工作以监理公司质量方针为行动指南,科学管理,通过不断地强化培训和学习,规范监理行为,严格按程序办事,对承包人做到监帮结合,为业主单位出谋划策,为业主科学决策提供有效支持,使顾客满意。2.2.2 监理总目标监理依据国家和相应主管部门制定、颁发的有关法律、法