《A类工条程施工组织设计.doc》由会员分享,可在线阅读,更多相关《A类工条程施工组织设计.doc(130页珍藏版)》请在三一办公上搜索。

1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit

2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,

3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi

4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail

5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the

6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi

7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free

8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i

9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al

10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material

11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev

12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan

13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to

14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen

15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of

17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple

18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize

19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma

20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels

21、cadres in enterprise development in the世侨大厦A座工程施工组织设计编 制 人:审 核 人:审 批 人:编制单位:江苏天宇建设集团有限公司编制日期:二O一一年十一月二十日目 录一、编制依据1.1技术规范1.2政策和法规1.3 图纸、勘察报告及招标文件1.4公司质量、职业安康及环境管理手册。1.5公司质量、职业安康及环境程序文件。二、工程概况、施工准备及布置2.1工程概况:2.2. 施工准备2.3 工程施工总体布署三、主要分部分项施工方法:3.1工程测量方案3.2基础结构施工3.3上部结构施工3.4墙体砌筑3.5脚手架工程3.6装饰工程3.7机电设备工程主要

22、施工技术措施3.8电气施工方案3.9冬期、雨期、暑期施工措施四、质量保证措施4.1工程质量标准:4.2质量目标4.3建立质量保证体系:4.4.过程质量执行程序:4.5工程质量保证程序:4.6工程质量预控程序:4.7组织管理保证措施:4.8技术保证措施:4.9钢筋质量保证措施:4.10模板工程质量保证措施:4.11混凝土质量保证措施:4.12防水工程质量保证措施;4.13电气工程质量保证措施:4.14暖、卫施工质量保证措施:4.15工程报验及试验4.16施工质量检测方法4.17主要分项工程质量控制点五、安全生产和文明施工措施5.1工程管理目标5.2安全保证体系5.3安全管理制度、现场保证措施5.

23、4安全生产保证措施5.5文明施工、环境保护及噪声控制措施:六、施工进度计划及进度保证措施6.1目标6.2进度控制的方法6.3强化进度计划管理6.4施工进度的控制6.5保证工期的技术措施6.6施工进度控制系统七、施工现场总平面布置图112八、主要劳动力安排计划表附表三:112九、主要材料需求表:114十、主要施工机具需求表附表一114十一、成品保护措施11711.1土建工程产品保护措施117十二、降低造价措施11812.1运用计算机的智能网络系统编制网络计划11812. 2施工中严格控制按施工预算,实行限额领料制度,节约原材料。11812. 3框架柱、顶板、外墙达到清水混凝土效果,减少工程抹灰量

24、,降低成本。11812. 4钢筋连接主要采用机械连接,节约钢材。利用钢筋下脚料制作各种预埋件,节约钢筋。11812. 5使用碗扣式脚手架支承体系,节约人工,加快模板周转,节约模板租用量,提高施工速度。11812.6预留洞采用定型模板,重复利用可节约费用。11812.7严格过程控制,确保保工程质量一次达到预控要求,减少返工。118recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures su

25、ch as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emitted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution

26、 of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers, operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation,

27、check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of re

28、sidents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 daily by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation o

29、f the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental prote

30、ction in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civilized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implem

31、entation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up a

32、nd when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make

33、full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements w

34、ithin the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine materialof backbone backbone role; to full strengthening members youth work, full play youth employees in company development in the of force r

35、ole; to improve independent Commission against corruption work level, strengthening on enterprise business key link of effectiveness monitored. , And maintain stability. To further strengthen publicity and education, improve the overall legal system. We must strengthen safety management, establish a

36、nd improve the education, supervision, and evaluation as one of the traffic safety management mechanism. To conscientiously sum up the Olympic security controls, promoting integrated management to a higher level, higher standards, a higher level of development. Employees, today is lunar calendar on

37、December 24, the ox Bell is about to ring, at this time of year, we clearly feel the pulse of the XX power generation company to flourish, to more clearly hear XX power generation companies mature and symmetry breathing. Recalling past one another across a railing, we are enthusiastic and full of co

38、nfidence. Future development opportunities, we more exciting fight more spirited. Employees, let us together across 2013 full of challenges and opportunities, to create a green, low-cost operation, full of humane care of a world-class power generation company and work hard! The occasion of the Sprin

39、g Festival, my sincere wish that you and the families of the staff in the new year, good health, happy, happy一、编制依据1.1技术规范名 称编号工程测量规范(GB50026-93)建筑工程冬期施工规程(GB502022011)混凝土质量控制标准(GB50164-92)建筑基坑支护技术规程(JGJ120-99)建筑地基处理技术规程(JGJ79-2002)钢结构工程施工质量验收规范(GB50205-2001)地基与基础工程施工质量验收规范(GB50202-2002)混凝土结构工程施工质量验

40、收规范(GB50204-2002)屋面工程质量验收规范(GB50207-2002)砌体工程施工质量验收规范(GB50203-2002)建筑装修工程施工质量验收规范(GB50210-2001)建筑地面工程施工质量验收规范(GB50209-2002)建设工程施工质量验收统一标准(GB50300-2001)建筑施工安全检查标准(JGJ59-99)建筑施工高处作业安全技术规范(JGJ80-91)建筑机械使用安全技术规程(JGJ33-2001)建筑现场临时用电安全技术规范(JGJ46-88)钢筋焊接及验收规范(JGJ18-2003)混凝土强度检验评定标准(GBJ107-87)建筑给水排水及采暖工程施工质

41、量验收规范(GB50242-2002)建筑排水用硬聚乙烯管道施工及验收规范(CECS94:2002)自动喷水灭火系统施工及验收规范(GB50261-2003)建筑电气工程施工质量验收规范(GB50303-2002)电缆线路施工及验收规范(GB50168-92)电器装置安装工程接地装置施工质量验收规范(GB50169-92)电器装置安装工程母线装置质量验收规范(GB149-90)电器装置安装工程电气照明装置质量验收规范(GB50259-96)建设工程文件归档整理规范(GB/T50326-2001)钢结构防火涂料通用技术条件 (GB1490794)1.2政策和法规序号文 件 名 称文 件 号1中华

42、人民共和国建筑法2中华人民共和国环境保护法中华人民共和国主席令1989年第22号3中华人民共和国计量法中华人民共和国主席令1986年第28号4建设工程质量管理条例中华人民共和国国务院令第279号5工程建设标准强制性条文中华人民共和国建设部建标200085号1.3 图纸、勘察报告及招标文件1.4公司质量、职业安康及环境管理手册。1.5公司质量、职业安康及环境程序文件。二、工程概况、施工准备及布置2.1工程概况:2.1.1地理位置:世侨大厦A座工程位于天津市武清区古达路西侧,京滨大道北侧,京滨工业园内。2.1.2 建筑设计概况:世侨大厦A座工程占地2266.26m2,总建筑面积38902.5m2,

43、地下一层,地上二十一层,室内外高差0.9m,建筑总高度为85.2m。本工程建筑等级为级,设计使用年限为50年,抗震设防烈度为8度。2.1.3结构设计概况:本工程建筑抗震设防类别为丙类,结构使用年限为50年,建筑安全等级为二级。地上二十一层,局部为十六层、二层。主体结构为钢筋砼框架剪力墙结构,剪力墙抗震等级为一级,框架抗震等级为一级。2.1.4主要部位建筑做法:非承重隔墙:内外墙均为200mm厚蒸压加气砼空心砌块,0.000以下砌体为MU10页岩砖,M10水泥砂浆砌筑,0.000以上采用MU3.5加气混凝土砌块M5.0砂浆砌筑;门窗:采用断桥隔热铝合金门窗;明框玻璃幕墙。墙面:外墙面为干挂石材外

44、墙面;内墙面为大理石材、釉面砖、乳胶漆等面层。2.2. 施工准备2.2.1、组织准备2.2.1.1、成立世侨大厦工程项目经理部(如下表),对工程实施全面控制、管理。职 务姓 名职 务姓 名项目经理华红光项目技术负责人刘群英项目工长刘彦才、史成柱水暖负责人姚成飞材料员成贻干、朱长强电气负责人姚成飞试验员李娜质检员陆永华技术员刘建岗放线员朱腾飞资料员李玉平安全员徐士来2.2.1.2成立以项目经理为首的安全生产文明施工领导小组,负责抓好工程文明施工和安全生产。2.2.1.3、建立健全质量管理体制,负责质量措施的全面落实和质量目标的控制,确保工程质量。2.2.1.4、项目组织机构及管理体制详见下图。施

45、工现场项目组织机构图项目施工各班组项目核算员:雍国际项目质检员:陆永华土建技术员:杨军项目安全员:徐士来水专业负责人:姚成飞项目试验员:李娜项目测量员:刘建岗项目材料负责人:成贻干电气负责人:姚成飞施工负责人项目经营负责人项目总工程师项目经理2.2.2.2技术准备a组织各专业技术人员认真和审查图纸,开工前项目负责人组织有关人员作好纸的熟悉和自审、会审工作。b做好各分项的技术交底工作,组织工人学习新工艺、新标准,掌握施工规范及施工方法。组织操作工人学习新技术新工艺等施工技术,并请专家进行现场指导,以保证工程质量。c根据甲方指定的定位桩,进行现场定位测量。并进行现场复核无误后,方可作为施工测量的基

46、准点。d收集整理与本工程施工有关的技术规范及标准图集,使用覆盖率达100%。e编写详细的施工组织设计,组织图纸自审,会同建设单位、监理单位及设计部门进行设计交底,未经会审的图纸不作为施工图使用。 f进行料源合格性测试分析;测试仪器的计量标定。2.2材料准备a开工前把本工程所需材料计划提出。砂、石、钢筋、水泥和预制构件等及外加剂选好货源,做到能及时供应合格材料。并做好材料的贮备工作。b材料供应商选定后及时做好材料试验,保证工程进度。2.2.3现场临建搭设:2.2.3.1施工围墙及道路布置2.2.3.1.1施工围档围档材料采用彩钢板搭设临时围墙。具体详见附图:施工现场总平面布置图。2.2.3.1.

47、2现场临时施工道路开工进场后构筑和维修一切必须的临时道路及走道,并尽可能采用施工区域内原道路及场地,为建筑物四周修4米宽临时道路。生活区修3米宽临时道路。施工场区入口主道路宽度8m,采用C20混凝土浇灌,道路混凝土厚15cm。 2.2.3.1.3施工临时设施布置根据现场实际勘察情况,由于现场较宽敞我公司考虑在现场搭设临建,临建位置尽量选择原有围墙边。在现场进出口设警卫室。项目经理部面积750m2,加工棚、机械棚200 m2;各工棚、机械棚为钢木屋架,石棉瓦屋顶结构。具体布置详见施工总平面布置图。办公区域:采用板房搭设,满足办公需求。生活区域:采用板房搭设。临时用房计划搭建3500. 为了保持工地及其周围环境的清