鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc

上传人:sccc 文档编号:4931124 上传时间:2023-05-24 格式:DOC 页数:203 大小:6.67MB
返回 下载 相关 举报
鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc_第1页
第1页 / 共203页
鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc_第2页
第2页 / 共203页
鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc_第3页
第3页 / 共203页
鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc_第4页
第4页 / 共203页
鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc_第5页
第5页 / 共203页
点击查看更多>>
资源描述

《鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc》由会员分享,可在线阅读,更多相关《鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标(浩安).doc(203页珍藏版)》请在三一办公上搜索。

1、target (management) decomposition responsibility (reference) Ann 2-5-1 to seriously implement implementation security first, and prevention of approach, according to building construction security checks standard and Chengdu city building construction site supervision management provides of requirem

2、ents, in combined this project manager production of reality, will and company signed set of safety integrated target management responsibility in the of target responsibility by about management personnel of security accountability for target decomposition, In order to maximize the control and redu

3、ction of all kinds of accidents in the construction of the project to ensure production safety. First, objectives: the project governed by the (Department) directly responsible for the production. Management team from project commencement to completion during by no casualties injured in accident, in

4、jury accident rate of no more than% (year), mechanical damage, fire accidents and may not happen. Second, implement safety measures, according to partial security technology to give the low-down the project team in a timely manner, and accumulation of security team members-organizational learning-re

5、lated operations. Third, on the part of the management of project risk site, mechanical, electrical and other effective protection should be taken, not in violation of education workers not to break the operation to stop illegal operations. Four, regular safety checks to clear risks, supervision and

6、 inspection of owning the job correct use of protective . Personal economy, and the exercise of a veto. This responsibility shall come into force from the date of signature. Project Manager (signature): Project Manager (signature): date of project management (management) security objectives appraisa

7、l form (reference) 2-5-2 project name: manager name: Title: class dates (months) items 1 2 3 4 5 6 7 8 9 10 11 12 to implement technical measures (10 points) as part of construction organization design of techniques and measures to implement the technology to give the low-down (20 points) are govern

8、ed by the team in time for technology to give the low-down the safe operation (20 points) whether organizations shift workers learn safety procedures Full protection (10 points) whether on by tube points part items engineering dangerous parts take has effective protection security checks (20 points)

9、 whether often for security checks, timely elimination hidden anti-three against (5 points) not illegal command, education workers not illegal operation stop illegal job protection supplies (5 points) supervision check belongs team personnel right using personal protection supplies civilization cons

10、truction (20 points) by jurisdiction team job site whether reached civilization construction Total project assessment overall assessment security assessment of the leading group inbehavior rules scientifically divided to six classes. A of the form of politics is the discipline, discipline, honesty a

11、nd discipline, discipline of the masses, work discipline and discipline of life. It can be said is to cover the party activities. Second is the discipline method separately, Ji, concentrated on the discipline. The revised regulations from the original irregularities of the ten variable into six cate

12、gories. Regulations of violation of the party constitution, to the detriment of the constitution authority and discipline behavior lacks necessary and serious responsibility accountability, and there is a discipline method. Now we adapt fully in accordance with the law of governing the country by la

13、w and in accordance with the regulations governing the party to take them apart, the legal attribution of law and discipline discipline. So the prominent characteristic is the discipline method separately, Ji The provisions of the Ordinance to discipline the table, make the law do not put inside the

14、 tube, to avoid our discipline or into party public security. Dont relate to the field, thus avoiding the repeated cross. Three is a reflection of strengthening the partys discipline construction of the latest achievements. New mainly reflect the partys eighteen years central resolutely implement th

15、e eight provisions, and resolutely against the four winds and so on, these new wrote the. For example, said the new in the implementation of the central eight of the spirit, a lot of opposition to the four winds wrote a clean Ji Law chapter, it represents the comprehensive strictly Party A the lates

16、t achievements. Party members if there is illegal and even criminal behavior, how to pursue disciplinary responsibility? According to Ji from the revision principle, where the state laws and regulations have stipulated content, will not re complex provisions. Revision of the Communist Party of China

17、 deleted 79 and criminal law, repeated terms of Public Security Management Punishment Law, and other laws and regulations. However, deletion law has provisions and not that the act is no longer the discipline, no longer be given disciplinary punishment. According to the party constitution, Party mem

18、bers have exemplary compliance with the obligations of the state laws and regulations, violations of the laws of the country are discipline Behavior. Remove the overlap with the discipline of the content and how to pursue party illegal and even criminal behavior of Party discipline and responsibilit

19、y. difference between five different conditions, with special provisions to stipulate, to achieve effective convergence of laws and discipline. It should be said, the revised in the Ji method to separate the stickRefers to the provisions of regulations set at the same time, through the special provi

20、sions, the disciplinary punishment and the law of the land treatmentManipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid developmen

21、t in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use a

22、lso brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller)

23、is in various special circumstances and under special conditions set for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful

24、development, now continues to develop as a factory automation standards. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and progra

25、mming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed lin

26、e that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn o

27、f has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in bot

28、h at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluatio

29、n standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect th

30、e external environment, but can still successfully complete like welding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to

31、use the program as a basis. Difference is that the robot begand鄂尔多斯市康巴什新区北区道路绿化一期工程 施工投标文件鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标招标编号:CXSG2010-180 投 标 人:陕西浩安园艺有限责任公司(盖单位章)法定代表人或其委托代理人: (签字)二一一年一月二十三日目 录一、投标函2二、法定代表人身份证明4三、授权委托书5四、投标保证金7五、已标价工程量清单8六、施工组织设计9附表1、拟投入本项目的主要施工设备表93附表2、拟配备本项目的试验和检测仪器设备表94附表3、劳动力计划表95附

32、表4、计划开、竣工日期和施工进度网络图96附表5、施工平面布置图97附表6、临时用地表98七、项目管理机构配备99(一)项目管理机构组成表99(二)主要人员简历表100八、拟分包项目情况表115九、资格审查资料116(一)投标人基本情况表及资质证明材料116(二)企业财务状况127(三)企业近年完成的类似项目情况表149(四)正在施工的和新承接的项目情况表186(五)近年发生的诉讼及仲裁情况187九、其它材料188一、投 标 函致:鄂尔多斯市康巴什新区园林绿化事业管理局1、我方已仔细研究了鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标文件的全部内容,愿意以人民币大写:伍佰伍拾万零玖仟伍

33、佰捌拾柒元(¥:5509587.00 元)的投标总报价,工期130日历天,按合同约定实施和完成承包工程,修补工程中的任何缺陷,工程质量达到符合国家绿化及相关工程验收规范,达到合格工程。2、我方承诺在投标有效期内不修改、撤销投标文件。3、随同本投标函提交投标保证金一份,金额为人民币(大写)伍万元(¥:50000元整)。4、如果我方中标:(1)我方承诺在收到中标通知书后,在中标通知书规定的期限内与你方签订合同。(2)随同本投标函递交的投标函附录属于合同文件的组成部分。(3)我方承诺按照招标文件规定向你方递交履约担保。(4)我方承诺在合同约定的期限内完成并移交全部合同工程。5、我方在此声明,所递交的

34、投标文件及有关资料内容完整、真实和准确,且不存在第二章“投标人须知”第1.4.3项规定的任何一种情形。6、我方完全响应招标文件的规定。投 标 人:陕西浩安园艺有限责任公司(盖单位章)法定代表人或其委托代理人: (签字)地 址:西安市未央区东元路209号1幢1012室网 址: 电 话: 传 真: 邮政编码: 710033 日 期: 二一一年一月二十三日 二、法定代表人身份证明投标人名称:陕西浩安园艺有限责任公司单位性质:有限责任公司地 址:西安市未央区东元路209号1幢1012室 成立时间:2003年6月24日经营期限:长期姓 名:岳育才 性别:男 年龄:72岁 职务:总经理系 陕西浩安园艺有限

35、责任公司 的法定代表人特此证明投标人:陕西浩安园艺有限责任公司(盖单位章)日 期:二一一年一月二十三日三、授权委托书本人 岳育才 系 陕西浩安园艺有限责任公司 的法定代表人,现委托 曹治国 为我方代理人。代理人根据授权,以我方名义签署、澄清、说明、补正、递交、撤回、修改 鄂尔多斯市康巴什新区北区道路绿化一期工程2标段 施工投标文件、签订合和处理有关事宜,其法律后果由我方承担。委托期限:本工程开标至竣工。代理人无转委托权。后附法定代表人、委托人身份证明投 标 人: 陕西浩安园艺有限责任公司(盖章)法定代表人: (签字)身份证号码: 610102194109023514 委托代理人: (签字)身份

36、证号码: 152701197706120954 日 期: 二一一年一月二十三日法定代表人身份证复印件委托代理人身份证复印件四、投标保证金五、已标价工程量清单六、施工组织设计鄂尔多斯市康巴什新区北区道路绿化一期工程2标段施工招标陕西浩安园艺有限责任公司 二一一年一月二十三日工程规范标准一、工程规范标准1、城市绿化工程施工及验收规范(CJJ/T82-99)2、施工现场临时用电安全技术规范(JGJ46-88)3、建设工程施工现场供用电安全规范(GB50304-93)4、建筑施工安全检查标准(JGJ59-99)5、施工图纸中要求的技术规程、规范、质量、要求及其它相关技术规程、规范及规定等。二、工程技术

37、要求(一)养护管理质量要求1、乔木类1.1生长旺盛,枝叶健壮、叶色正常,数形美观。1.2行道树树行整齐美观,数冠完整,树干高度一致,分枝定点合理,无枯枝残叶,无严重的人为损伤,景观效果优良。1.3缺株率在2%以下(因自然条件所限不能植种或树冠已经郁闭的不列为缺株,下同)1.4新植树木成活率和原有树木保存率均达到98%以上(包括98%,下同)1.5树下土壤经常保持疏松,防止板结、无杂草、杂物。2、灌木类2.2生长旺盛,花繁叶茂,树行丰满、美观、无枯枝、残叶、杂物、景观效果优良。2.2新植树木成活率和原有树木保存率均达到98%以上。3、绿篱类3.1生长旺盛,造型平整、美观、线条流畅,疏密适宜,无枯

38、枝、残叶。3.2新植树木成活率和原有树木保存率均达到98%以上。4、草坪类4.1草坪生长茂盛,叶片健壮、茂密,叶色浓绿,无枯黄叶,无杂物。4.2整体效果平整、均匀、美观、覆盖率达到98%以上。4.3)每一缺草地块面积小于20C。5、草花类5.1品种纯正,植株生长健壮,株行美观,花繁叶茂。叶片排列整齐、均匀、叶色正常,花期正常,花行一致,花色艳丽、纯正。5.2)花坛设计新颖、搭配合理,整体效果突出。6、浇灌6.1.根据气候、植物种类、树龄、生长季节不同合理浇灌。6.2.树木类6.2.1以管灌方式浇灌,单株单坑浇灌。6.2.2水圈达到标准要求。6.2.3一般情况下浇灌次数达到10次以上。6.2.4

39、及时浇灌冻水和解冻水。6.3.草坪类6.3.1浇灌已喷灌结合管灌方式进行。6.3.2适时浇水,新植草坪每次浇水量应达到渗入地下10左右,2年以上草坪每次浇水量应达到渗入地下15左右。6.4.草花类6.4.1浇灌以管灌结合喷灌方式进行。6.4.2一般情况下,新植一周内浇水达到3次,定植后每周浇水1-3次。6.4.3植物生长无枯黄、萎蔫、非正常落叶等旱相。7、施肥7.1根据植物特点即土壤情况合理施肥。7.2新植前施有机肥,生长期适当追肥。7.3植物生长正常,花期,花色正常。7.4无枯黄、生长缓慢、非正常落叶等现象和徒长、烧伤现象。8、修剪8.1即使修剪,保持植物株行整齐美观,枝条疏密适宜。8.2行

40、道树定干高度一致、树冠整齐完整,伤口平整并及时处理。树木无枯枝死枝、病虫枝、徒长枝,绿篱修剪线条流畅,重点造型有艺术感。8.3草花类无残花、败叶、枯枝。直播类草花需间苗1-2次,选优去劣,清除混杂品种,使之达到合理的密度。8.4草坪类高度一致,边缘整齐,道路草坪保持高度9,广场公园草坪生长高度保持6-8。生长2年以上的草坪必须进行疏根和打孔。9、病虫害防治9.1.乔灌木9.1.1叶片生长正常,单株失叶量低于10%。9.1.2枝干健壮,蛀虫害虫防治率达100%.9.1.3介壳虫最严重处,主干、主枝平均每100活虫1只以下(包括1只,下同),较细枝条平均每30长在4只以下,受害株率都为5%以下。9

41、.1.4杨、柳、槐烂皮病等主干防治率达100%,其中树种发生株率小于1%。9.1.5根部病虫害发生株率小于1%。9.1.6草花生长健壮,草花病虫害造成草花死亡或严重受害株率小于5%。9.1.7草坪密实正常,受害叶片占单株叶量小于5%,地下害虫控制每平方米小于2只。9.1.8新栽植苗木无危险性病虫害。9.1.9及时发现新病虫害,掌握常发性病虫害危害消长情况,采取科学方法进行治理。(二)公园养护管理质量标准1、乔木类1.1生长旺盛,枝叶健壮、叶色正常,数形美观。1.2行道树树行整齐美观,数冠完整,树干高度一致,分枝定点合理,无枯枝残叶,无严重的人为损伤,景观效果优良。1.3缺株率在4%以下。1.4

42、新植树木成活率和原有树木保存率均达到96%以上。1.5树下土壤经常保持疏松,防止板结、无杂草、杂物。2、灌木类2.1生长旺盛,树形美观,叶色正常、花期正常、无枯枝,残叶、杂物、,景观效果优良。2.2新植树木成活率和原有树木保存率均达到96%以上。3、绿篱类3.1生长旺盛,造型平整、美观,疏密适宜,无枯枝、残叶。3.2新植树木成活率和原有树木保存率均达到96%以上。4、草坪类4.1草坪生长茂盛,叶色正常,无枯黄叶,无杂物。4.2覆盖率达到96%以上。4.3每一缺草地块面积小于200C。5、草花类5.1品种纯正,植株生长健壮,株行美观,花繁叶茂。叶色正常,花期正常。5.2.花坛设计新颖、搭配合理,

43、整体效果突出。6、浇灌6.1根据气候、植物种类、树龄、生长季节不同合理浇灌。6.2.树木类6.2.1以管灌方式浇灌,单株单坑浇灌。6.2.2水圈达到标准要求。6.2.3一般情况下浇灌次数达到全年9次以上。6.2.4及时浇灌冻水和解冻水。6.3.草坪类6.3.1浇灌已喷灌结合管灌方式进行。6.3.2适时浇水,草坪每次浇水量应达到渗入地下10左右,2年以上草坪每次浇水量应达到渗入地下15左右。6.4.草花类6.4.1浇灌以管灌结合喷灌方式进行。6.4.2一般情况下,新植一周内浇水达到3次,定植后每周浇水1-3次。6.4.3植物生长无枯黄、萎蔫、非正常落叶等旱相。7、施肥7.1根据植物特点即土壤情况

44、合理施肥。7.2新植前施有机肥,生长期适当追肥。7.3植物生长正常,花期,花色正常。7.4无枯黄、生长缓慢、非正常落叶等现象和徒长、烧伤现象。8、修剪8.1即使修剪,保持植物株行整齐美观,枝条疏密适宜。8.2行道树定干高度一致、树冠整齐完整,伤口平整并及时处理。树木无枯枝死枝、病虫枝、徒长枝,绿篱修剪线条流畅,重点造型有艺术感。8.3草花类无残花、败叶、枯枝。直播类草花需间苗1-2次,选优去劣,清除混杂品种,使之达到合理的密度。8.4草坪类高度一致,边缘整齐,道路草坪保持高度9,广场公园草坪生长高度保持6-8。生长2年以上的草坪必须进行疏根和打孔。9、病虫害防治9.1.乔灌木9.1.1叶片生长正常,单株失叶量低于15%。9.1.2枝干健壮,蛀虫害虫防治率达100%。9.1.3介壳虫最严重处,主干、主枝平均每100活虫2只以下,较细枝条平均每30长在5只以下,受害株率都为4%以下。9.1.4杨、柳、槐烂皮病等主干防治率达100%,其中树种发生株率小于1%。9.1.5根部病虫害发生株率小于2%。9.1.6草花生长健壮,草花病虫害造成草花死亡或严重受害株率小于5%。9.1.7草坪密实正常,受害叶片占单株叶量小于10%,地下害虫控制每平方米小于3只以下。9.1.8新栽植苗木无危险性病虫害。9.1.9及时发现新病虫害,掌握常发性病虫害危害

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号