通用GVDP英文5版.ppt

上传人:小飞机 文档编号:5387904 上传时间:2023-07-02 格式:PPT 页数:66 大小:2.19MB
返回 下载 相关 举报
通用GVDP英文5版.ppt_第1页
第1页 / 共66页
通用GVDP英文5版.ppt_第2页
第2页 / 共66页
通用GVDP英文5版.ppt_第3页
第3页 / 共66页
通用GVDP英文5版.ppt_第4页
第4页 / 共66页
通用GVDP英文5版.ppt_第5页
第5页 / 共66页
点击查看更多>>
资源描述

《通用GVDP英文5版.ppt》由会员分享,可在线阅读,更多相关《通用GVDP英文5版.ppt(66页珍藏版)》请在三一办公上搜索。

1、,GVDP v5.0 UpdateDon Smith,22MAY06,This document is for internal GM use only.Not to be duplicated or disclosed outside GM without approval of Don Smith 586-986-1983,GVDP Post DSI v5.0 Released 06April06(for more information go to:gvdp/asiapacific/index.html),GVDP Pre-VPI Process Documentation v1.0Re

2、leased 06MAR06(for more information go to:),GVDP Pre-VPI GVDP version 5.0,Outline,Pre-VPI and Post-VPIGlobal GVDP 5.0 BackgroundHigh level frameworkProcess AgreementsProcess Agreement detail 5.0 contentProgram FrameworkArchitecture&Program Work StructureGVDP 5.0 Assumptions&EnablersProcess Documenta

3、tion,Pre-VPI and Post DSI GVDP,pre-VPI GVDP“bolts-on”to the beginning of the rest of the GVDP for individual programs and supplies needed deliverables at DSI,Program Development,ArchitectureFraming,ArchitectureEngineering,ArchitectureRefinement,Program Framing/ArchitectureDevelopment,Portfolio Plan

4、Development,Program Execution,Current Arch?,VPI,VDR,SORP,PFI,AFI,to ensure quality execution.,ASSI,AA,DSI,AC,Architecture Framing Initiated,Architecture Statement of Strategic Intent,Program Framing Initiation,Architecture Approval,Document of Strategic Intent,Architecture Confirmation,Vehicle Progr

5、am Initation,Verified Data Release,Start Of Regular Production,What is pre-VPI GVDP?,pre-VPI GVDP is GMs integration of architecture development and program development,pre-VPI GVPDIs GlobalIs a documented processAccommodates multi-market architectural development similar to Global EpsilonAccommodat

6、es the newly defined Global Portfolio ProcessProvides timing guidance for architecture and program development(start and end points)Defines required decision points and approval forums(governance),Pre-VPI GVDP Overview,Architectural Approval,Documentof Strategic Intent,Architecture Statement of Stra

7、tegic Intent,Vehicle Program Initiation,PFI,Yes,No,Arch.Framing Initiation,AFI,VPI,1 mth,Arch.Mods?,Program Framing Initiation,Portfolio Development,ProgramFraming,ArchitectureFraming,Engineering&Execution,ArchitectureRefinement,Program Development,5-6 Mo.,6-7 Mo.,6-7 Mo.,6 Mo.,6 Mo.,Ongoing,ASSI,AA

8、,AC,DSI,Architectural Confirmation,PFI,VPI,1 mth,ProgramFraming,Program Development,5-6 Mo.,6-7 Mo.,DSI,Lead Program(e.g.Vectra),Derivative Program(s)(e.g.GMX 353,GMX 354),No ArchitectureModifications(outside of bandwidth)(e.g.GMX211,GMX272,GMX386),New/Modified Architecture(e.g.Epsilon,Gamma,Delta),

9、AFI-AC Key Program Deliverables,ArchitectureFraming,Engineering&Execution,ArchitectureRefinement,AFI,Global Market&Arch.RequirementsBandwidth of physical dimensions/proportionsArch.Boundary Conditions(Material Cost&Investment)Body StylesMainstream Architecture Configuration/PackagingLoad path Strate

10、gyKey Architectural BOM Rows SelectedBaseline Powertrain Plan(Engine/Trans.Families,Drive Types)Proportional Model(s)Sourcing StrategyManufacturing Strategy,Virtual Performance AssessmentVirtual Package AssessmentUnderbody 3D Math ModelGlobal ADV PlanAllowable Costs SOR Development Sourcing Activiti

11、es,ASSI,AA,AC,Architecture Imperatives Architecture Cost Status Virtual Architecture Assessment Proportions/Integrated Packaging Systems&Component Concept Solutions Proportional Model Early Supplier Involvement Manufacturing Concept,Capability of arch.&bandwidths defined,ArchitectureCapability confi

12、rmed virtually,Architecturesolutiondefined,Initial Participating Regions and ProgramsInitial Engineering Requirements Regulatory Performance Etc.,Initial arch.objectives identified,Program Framing,The purpose of Program Framing:Develop common program vision and objectives with Leadership Translate c

13、ustomer and corporate requirements into technical requirements Understand the engineering solutions within the existing architecture Modifications as required within existing bandwidths Develop the compatible boundary conditions captured in the DSI,Program Planning/Architecture Adaptation,Program Fr

14、aming,Portfolio Development,Target Exploration Workshop,Program Framing Kickoff,Document of Strategic Intent,Program Framing Complete,Program Definition Complete,Ongoing,Program Framing Initiation,PFI,DD,DSI Direction,GVDP,PFC,PDC,5-6 months,DSI,Approves“kick-off”of program DSI developmentConfirms P

15、FI inputs:“Big Idea”and Strategic Role in PortfolioArchitectureProgram scope and timeline Body Style and Brand Assumptions Potential Powertrain Families and Drive ConfigurationsInitial capital and engineering Workload assumptions Primary Region(s)of salePotential issuesAuthorizes resources(Core PET)

16、,Regional AVDLT or GPDC(if required),DSIPrep,Program Framing,Program Framing Kickoff,Document of Strategic Intent,Program Framing Complete,Program Framing,Program Definition Complete,Ongoing,Program Framing Initiated,PFI,DSI Direction,PFC,PDC,DD,Target Exploration Workshop,GVDP,5-6 months,DSI,Portfo

17、lio Development,Create and assess program alternativesDevelop organizational alignment concerning scope,vision,and key objectives(key wins,price of entry items)Establish program targets and boundary conditionsProgram positioning Preliminary Content(including powertain,key technologies)Financial Boun

18、dary ConditionsDesign enablersManufacturing footprintDevelop&verify high level engineering solutions that will meet existing Bill of Architecture(BOA),DSIPrep,GlobalPortfolio Planning,Global VDP 5.0 Background,Product development leadership direction to shorten time between VPI and SORPReduction bas

19、ed on GELT led studies of GMDAT and Toyota lead time advantages.Study concluded:GMs global VDP lead times lag Toyotas by several monthsToyotas enablers:decoupled development,overlapping functional work and fast functional processes DSI to SORP advantage of about 4 monthsGMDAT Lean VDP faster for in-

20、country productsActual GVDP 5.0 reduction is 15 weeks(37/20 to 33/20)for New and Major vehicle programs.Reduction moves single theme math 15 weeks closer to the market.GVDP 5.0 was released for programs with a Document of Strategic Intent(DSI)on or after June 1,2006,and for select programs earlierEx

21、isting 4.1 programs will not be updated to 5.0 logic or timing.Additional studies are being conducted to develop shorter templates for derivative programsGVDP Pre-VPI Released for use on 06MAR06 creates deliverables important to executing GVDP 5.0,GVDP 5.0 Release Announcement 07April 06,All,Followi

22、ng an initiative sanctioned by the Global Product Development Council(GPDC),Global Engineering Leadership Team(GELT)and Global Joint Engineering and Manufacturing Staff(GJEMS)to shorten product development lead time,we are pleased to announce the release of the Global Vehicle Development Process(GVD

23、P)5.0.This release improves VPI-SORP timing,for new and major programs,from 37 months to 33 months,and moves styling 15 weeks closer to market introduction.GVDP 5.0 is directed at programs with Document of Strategic Intent(DSI)dates after June 1,2006,and several select(slightly earlier)programs wher

24、e partial implementation will occur.Regards,Rick SpinaExecutive DirectorGlobal Program Management,GVDP 5.0 Framework 33/20,Theme Development,IDR,VDR,-112,Design ARM,Sourcing,SOR,B,CT,Procure Parts,FG,CV Design Solution,FG,SV Design Solution,Process/Formability,Construct/Verify Dies,B,CT,Procure Part

25、s,IV Design Solution,FG,DTA,-163,AD,-155,Design Dies,MVBs,MVBns,PPV,Design BodyShop Tools,Construct/VerifyBody Shop Tools,-15,Ped Pro Mule,Mules,VPI-SORP 15 week reduction from GVDP 4.1,-148,STD,DSI-SORP Overall leadtime is within 6 weeks of Toyota,Functional processes have been adjusted,added,or re

26、fined:Styling&Surfacing Mules Sourcing Dies and Bodyshop Tooling Pedestrian Protection PPAP End-of-Line Test Iterative Matching Etc.,DSI,-181,IDR,VDR,-112,Design ARM,Sourcing,SOR,B,CT,Procure Parts,Design ANRM,Sourcing,SOR,B,CT,Procure Parts,Theme Development,FG,CV Design Solution,FG,Design Solution

27、,IV Design Solution,FG,SV Design Solution,Process/Formability,DesignDies,Construction/VerifyDies,B,CT,Procure Parts,FG,SF,-116,PSD,-121,GVDP 4.1 Framework 37/20,MVBs,MVBns,PVV,Design BodyShop Tools,Construction/VerifyBody Shop Tools,Styling,Mules,IV,Engineering Design,Manufacturing/Launch,To show ho

28、w time was removed for 5.0,lets build the framework starting with 4.1,DSI,-166,IDR,VDR,-112,Theme Development,FG,CV Design Solution,FG,SV Design Solution,Process/Formability,DesignDies,Construction/VerifyDies,B,CT,Procure Parts,Build One,MVBs,MVBns,PPV,Construction/VerifyBody Shop Tools,Design BodyS

29、hop Tools,Styling,Mules,IV,Engineering Design,Manufacturing/Launch,Enabled by:Increased sketch work done pre-DSIRevised definition of IDR requirementsEarlier sourcing of DC 12 componentsRevised DFP schedule,STD,-148,IDR,VDR,FG,CV Design Solution,FG,SV Design Solution,Process/Formability,DesignDies,C

30、onstruction/VerifyDies,B,CT,Procure Parts,Build Two,MVBs,MVBns,PPV,Construction/VerifyBody Shop Tools,Design BodyShop Tools,Styling,Mules,IV,Engineering Design,Manufacturing/Launch,DTA,-163,AD,-155,Theme Development,STD,-148,IDR,VDR,Design,Sourcing,SOR,B,CT,Procure Parts,FG,CV Design Solution,FG,SV

31、Design Solution,Process/Formability,DesignDies,Construction/VerifyDies,B,CT,Procure Parts,Build Three,MVBs,MVBns,PPV,Construction/VerifyBody Shop Tools,Design BodyShop Tools,VPI,Styling,Mules,IV,Engineering Design,Manufacturing/Launch,4.1,DTA,-163,AD,-155,-112,Theme Development,STD,-148,IDR,VDR,Desi

32、gn,Sourcing,SOR,B,CT,Procure Parts,FG,CV Design Solution,FG,SV Design Solution,Process/Formability,DesignDies,Construction/VerifyDies,B,CT,Procure Parts,Build Four,MVBs,MVBns,PPV,Design BodyShop Tools,Construction/VerifyBody Shop Tools,Overlap of ME Activities with engineering design,Styling,Mules,I

33、V,Engineering Design,Manufacturing/Launch,Must adhere to IDR data approximately 1mm to VDR or as restricted by the Red/Blue Process,DTA,-163,AD,-155,-112,Theme Development,STD,-148,Key GVDP 5.0 Process Agreements,GVDP 5.0 Assumptions and Enablers(link)GVDP 5.0 Modification Restrictions(link)Lead Tim

34、e Reduction Changes Lengthening of DSI-VPI Process Styling&Surfacing Process Change Mule Stream Pull-Ahead Relative to VPI Overlapping of ME activities with Engineering DesignProcess Additions/Refinements/Clarifications PPAP Process End of Line Testing Ped Pro Iterative Matching PQRR Process Additio

35、nal Changes,Lengthening of DSI-VPI Process,Currently 22 weeks,DSI,-172,Theme,Alternatives,Develop Single Theme Alternatives,DSI,-181,AD,-166,DTA,-172,Theme,Alternatives,Develop Single Theme,+4,+2,GVDP 4.1,GVDP 5.0,4 additional weeks to develop themes2 additional weeks for engineering assessment of c

36、linic input(not Design driven),VPI,-144,Single Theme,Develop Theme,DSI Document of Strategic IntentSTD Single Theme Direction DTA Design Theme AlternativesVPI Vehicle Program InitiationAD Alternatives Development,Added 6 weeks,Lengthening of DSI-VPI Process,GVDP 5.0,What has changed?4 weeks added be

37、tween DTA and the STD2 weeks added between STD and VPIWhy has it changed?4 weeks,enables a more robust design styling process by allowing additional time to create and optimize multiple themes to a given set of architectural criteria with increased fidelity of the design surfaces.2 weeks,for enginee

38、ring assessment of the single theme decision outcome and to allow for management reviews(Engineering and Program Management Driven)What does this mean to Program Teams?Clinic properties will have the benefit of a more robust and comprehensive theme development processHigher fidelity theme at Single

39、Theme DirectionAdditional time to complete business case and Charter document at VPIAdditional time for management reviews,DSI,-172,Theme,Alternatives,Develop Single Theme Alternatives,Added 6 weeks,+4,+2,VPI,-144,Single Theme,DSI Document of Strategic Intent STD Single Theme Direction DTA Design Th

40、eme Alternatives VPI Vehicle Program InitiationAD Alternatives Development,Styling&Surfacing Process Change,IDR,VDR,Interior,Uppers,Doors,Fenders&Quarter Panels,Hood&Decklid,Fascias/Lamps/Grilles/Moldings,-113,-105,-88,-121,-113,-101,-119,-117,-117,-115,-110,-106,-106,-102,-97,-98,-98,-98,GVDP 4.1,I

41、DR,VDR,GVDP 5.0,-116,-106,-90,Interior,-116,-106,-96,Metal,-116,-106,-94,Fascias/Lamps/Grilles/Moldings,DSI,-172,Theme,Alternatives,Develop Single Theme Alternatives,Theme,Alternatives,Develop Single Theme,STD-Single Theme Direction DSO Design Sign Offf STD-MD Single Theme Direction Math Data SF Sty

42、ling FreezeDTA Design Theme Alternatives VPI Vehicle Program initiation PSD Preliminary Styling Data IDR Initial Data ReleaseAD Alternatives Development ESO Engineering Sign Off CSO Contact Sign off VDR Verified Data Release,TA,-115,Styling&Surfacing Process Change,What has changed?Theme development

43、 has been reduced by 16 weeks(STD to SF)Single theme math is now 15 weeks closer to the marketIDR/VDR activities consolidated(6 to 3)and moved to single IDRTime between DSO and SF reduced by 8 weeksPreliminary Styling Data(PSD)&Theme Approval(TA)have been removed Why has it changed?Enabled by higher

44、 fidelity theme at STD due to added time between DSI&VPI IDR/VDR work stream consolidation now aligns more closely with interdependent surface development Single IDR and proximity of DSO and SF eliminates need for PSDTheme approval not a separate milestone and essentially occurs at DSO.Final design

45、reflected in SF 4 weeks laterWhat does this mean to Program Teams?Earlier decisions required(relative to VPI)to support earlier styling critical sourcing Less time between STD and SF reduces the opportunity for iterations,reducing the program teams ability to make changes post DSOLess potential chan

46、ge after IDR since panels are developed simultaneously before IDR releaseEasier tracking of surface releases Requires rigorous adherence to R/B Process for IDR/VDR surface change management(formerly R/B/G Process)Critical for inner metal release integrity,IV fidelity,and overlap with ME workstream,I

47、DR,VDR,GVDP 5.0,-116,-106,-90,Interior,-116,-106,-96,Metal,-116,-106,-94,Fascias/Lamps/Grilles/Moldings,DSI,-172,Theme,Alternatives,Develop Single Theme Alternatives,clinic,DSI Document of Strategic Intent STD-Single Theme Direction DSO Design Sign Offf SF Styling FreezeDTA Design Theme Alternatives

48、 VPI Vehicle Program initiation PSD Preliminary Styling Data IDR Initial Data ReleaseAD Alternatives Development ESO Engineering Sign Off CSO Contact Sign off VDR Verified Data ReleaseVDRsm VDR Sheet Metal STD MD Single Theme Direction Math Data,Sourcing of Styling Critical Components,GVDP 5.0,DSI,-

49、172,clinic,DCS,-127,-147,Cluster,Design Center has eliminated 16 weeks(STD-SF)to enable 5.0.This is a 40%reduction in the amount of styling time Design Timing Reductions based on Key Suppliers Selected at designated timesSourcing timing is driven by need for styling to work with suppliers to develop

50、 criteria before ESO,SOR,-104,Final Soln,Design,-140,B,CT,Procure Parts,-113,FinalSoln,-124,-105,-137,-165,GVDP 5.0,ARC,-151,Sourcing,-172,DSI Document of Strategic IntentCVER Concept Vehicle Engineering ReleaseVPI Vehicle Program InitiationSVER Structure Vehicle Engineering ReleaseARC Architecture

展开阅读全文
相关资源
猜你喜欢
相关搜索
资源标签

当前位置:首页 > 生活休闲 > 在线阅读


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号