b市政排水沟工程施工方案.doc

上传人:sccc 文档编号:4931201 上传时间:2023-05-24 格式:DOC 页数:89 大小:482.51KB
返回 下载 相关 举报
b市政排水沟工程施工方案.doc_第1页
第1页 / 共89页
b市政排水沟工程施工方案.doc_第2页
第2页 / 共89页
b市政排水沟工程施工方案.doc_第3页
第3页 / 共89页
b市政排水沟工程施工方案.doc_第4页
第4页 / 共89页
b市政排水沟工程施工方案.doc_第5页
第5页 / 共89页
点击查看更多>>
资源描述

《b市政排水沟工程施工方案.doc》由会员分享,可在线阅读,更多相关《b市政排水沟工程施工方案.doc(89页珍藏版)》请在三一办公上搜索。

1、les disposicions pertinents de lestat a la verticalitat seguretat supervisi i gesti departaments per avaluar operacions especials unitat nacional ha aconseguit qualificat personal format certificat abans de participar en el corresponent treball o gesti. 7, ls de la unitat dequipament especial ha de

2、ser seguretat equip especial dequipament especial operador educaci i formaci, i operadors dequips especials disposen del material necessari especial per assegurar la seguretat operacional de coneixement. 14, pont de normes de seguretat operaci 1, capit, el monitor i els principals tipus de treballad

3、ors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat est estrictament prohibit beure. 4, est estrictament prohibit per a erecci mquina de biga moviment longitudinal i lexterior a la nit. 5, un

4、pont en ambds costats de lrbita longitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista datletisme i un control estricte de lespai, tres pistes ha de ser parallel. 6, installaci de biga de formig de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontol

5、len i tornada, limport es calcula segons els angles oblics i lamplada de les rodes desquerra i dreta, per tal que els cotxes poden crrer sobre una pista horitzontal. 7, pont de desplaament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, instal lar superio

6、r i inferior pendent vertical, desplaament longitudinal de mquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i posterior per a la protecci, espai especial columna 1, molt a prop de la biga, al control de latenci. 9, un pont penjant penjant de prov

7、ar que la installaci de la mquina ha de ser corregut, tamb es pot utilitzar desprs de la crrega de la prova de la biga de formig i pont erigir mquina i llavors crrer per comenar la feina dinstallaci. 10, quan erigir installaci mquina, comprovacions de seguretat regular, una seguretat integral compro

8、va cada installaci un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecnic i elctric amb malaltia no estan permeses. 11, la sobrecrrega doperaci dinstallaci no s perms. Nivell, ha de ser enfortida sobre terreny prou slida, coixinets Outrigg

9、er cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent s superior a 13.8M / s (equivalent a 6 vent), grua no deures, quan la longitud de bra s superior a 50 m quan la velocitat del vent no podr ser superior a 9.8M / s (lequivalent de 5 vent). I prestar atenci als efectes en

10、 lestabilitat de la grua, vent no penjar-se, davant el vent t alguns perills, alant el contrari. (3) estrictament segons la capacitat nominal quan laixecament de la taula i aixecar loperaci corba desociety; after after 60 years of development, the socialist society more full of life And vigor. The r

11、emarkable sign is in China adhere to the basic principles of scientific socialism, not lost ancestors, always adhere to dialectical materialism and historical materialism as the theoretical foundation, adhere to the to the realization of communism as the supreme ideal, adhere to the Party of the wor

12、king class as the core of leadership, insist to liberate and develop productivity is the fundamental task, adhere to represent the most numerous peoples fundamental interests, adhere to public ownership and according to work, distribution is the basis of the socialist economic system, adhere to the

13、position of the people as masters of the country is the essential characteristic of the socialist democratic politics, adhere to reform and improve the socialist system and institutional mechanisms, and so on. At the same time, our country socialist And with distinct Chinese characteristics, the roa

14、d of socialism with Chinese characteristics, the system of theories of socialism with Chinese characteristics and the socialist system with Chinese characteristics, are deeply rooted in the creative practice of hundreds of millions of peoples indomitable, timely response to practice innovation theor

15、y calls, rich heritage of both historical and cultural traditions of the Chinese nation, and let the Chinese people love to see and hear the Chinese style and Chinese style, comply with the requirements of the development of the times, reflect the common aspiration of the people, with distinct chara

16、cteristics of the practice, theoretical characteristics, national characteristics, characteristics of the times. Therefore, it can always maintain the vigor and vitality, and always guide contemporary China along the right direction stride forward. So we must always hold high the great banner of soc

17、ialism with Chinese characteristics unswervingly. On the other hand, Chinas socialist society is still in primary stage, which is Chinas construction of socialist modernization insurmountable historical stage, the need for hundreds of years time. Chinas socialist system was born in semi colonial and

18、 semi feudal society, productivity level is far behind in the developed capitalist countries, which determines the our country must experience a long primary stage, to realize in other countries under the conditions of capitalism to achieve industrialization and production in the market, socializati

19、on and modernization. Today, our country socialism has made remarkable tremendous To accelerate the pace of achievements, but our country fundamental realities of the country is still has a large population, weak thin, development is not balanced. Chinas economy has leapt to the world, but the per c

20、apita gross domestic product is still ranked in the world the 90%; economic sustained and rapid development, but the development is not balanced, coordinated, can not be continued problems are still prominent, the transformation of economic developmentManipulator is now used as a industrial robots i

21、n use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator application began to filter into welding, logistics, m

22、echanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this robot to get peoples attention began to be a hi

23、gh degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set for mechanical devices. Now turned on the devel

24、opment of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standards. Because robots are good development of the

25、technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of industrial PLC applications became ubiquitous. Mani

26、pulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of automation combined with restrictions on the manipula

27、tor development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opportunities awareness in world range within some

28、leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm research began Yu 20th century medium-term, after

29、 years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic arm spent most of mass production and use on the p

30、roduction line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like welding, painting, delivery as well as for material

31、s simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand目 录第一章:总体情况一、工程概况二、施工准备三、施工布置第二章:质量保证措施一、质量保证体系二、质量保证

32、措施三、隐蔽工程质量保证措施四、档案管理第三章:安全保证措施一、安全生产保证体系二、安全防范重点及安全制度三、安全技术保证措施第四章:文明施工与环境保护措施一、文明施工保证措施二、环境保护措施第五章:施工进度计划及工期保证措施一、施工工期和施工进度计划二、工期保证措施第六章:施工方案及措施一、总体工程施工方案二、沟槽开挖及垫层三、钢筋砼箱涵底板四、模板工程五、钢筋工程及沉降缝六、混凝土工程七、毛石挡墙八、回填土九、草皮种植十、施工协调措施第七章:施工资源计划与先进性一、拟投入机械设备计划二、材料投入计划三、劳动力安排计划四、劳务分包情况第八章:施工部署和总平面布置一、施工总部署二、施工指导思想

33、三、施工总平面布置图第九章:季节性施工措施第十章:施工成本控制第十一章 :施工场地治安保卫管理计划附表一、投入本标段的主要施工设备表附表二、拟配备本标段的试验和检测仪器设备表附表三、劳动力计划表附表四、计划开、竣工日期和施工进度网络图附表五、施工总平面图附表六、临时用地表les disposicions pertinents de lestat a la verticalitat seguretat supervisi i gesti departaments per avaluar operacions especials unitat nacional ha aconseguit qual

34、ificat personal format certificat abans de participar en el corresponent treball o gesti. 7, ls de la unitat dequipament especial ha de ser seguretat equip especial dequipament especial operador educaci i formaci, i operadors dequips especials disposen del material necessari especial per assegurar l

35、a seguretat operacional de coneixement. 14, pont de normes de seguretat operaci 1, capit, el monitor i els principals tipus de treballadors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat est

36、estrictament prohibit beure. 4, est estrictament prohibit per a erecci mquina de biga moviment longitudinal i lexterior a la nit. 5, un pont en ambds costats de lrbita longitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista datletisme i un control estricte d

37、e lespai, tres pistes ha de ser parallel. 6, installaci de biga de formig de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontollen i tornada, limport es calcula segons els angles oblics i lamplada de les rodes desquerra i dreta, per tal que els cotxes poden crrer sobre una pista horitzontal

38、. 7, pont de desplaament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, instal lar superior i inferior pendent vertical, desplaament longitudinal de mquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i

39、posterior per a la protecci, espai especial columna 1, molt a prop de la biga, al control de latenci. 9, un pont penjant penjant de provar que la installaci de la mquina ha de ser corregut, tamb es pot utilitzar desprs de la crrega de la prova de la biga de formig i pont erigir mquina i llavors crre

40、r per comenar la feina dinstallaci. 10, quan erigir installaci mquina, comprovacions de seguretat regular, una seguretat integral comprova cada installaci un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecnic i elctric amb malaltia no est

41、an permeses. 11, la sobrecrrega doperaci dinstallaci no s perms. Nivell, ha de ser enfortida sobre terreny prou slida, coixinets Outrigger cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent s superior a 13.8M / s (equivalent a 6 vent), grua no deures, quan la longitud de b

42、ra s superior a 50 m quan la velocitat del vent no podr ser superior a 9.8M / s (lequivalent de 5 vent). I prestar atenci als efectes en lestabilitat de la grua, vent no penjar-se, davant el vent t alguns perills, alant el contrari. (3) estrictament segons la capacitat nominal quan laixecament de la

43、 taula i aixecar loperaci corba demode and deepen the reform task of industrialization, urbanization and agricultural modernization, but the industry is big and not strong, agricultural base is still weak, rural development is relatively lagging behind, farmers income difficult problem is still a lo

44、t of; ideological and moral construction has made important progress, but some areas of moral anomie, integrity deletion The National Peoples life has reached a comparatively well-off level, but the gap between urban and rural areas and residents income distribution is stillAlthough large, education

45、, employment, social security and other vital interests of the masses is also more, part of the life of the masses remains difficult; the creative vitality of society generally increased, but the impact social harmony and stability of the various contradictions also many; and so on. These shows, our

46、 country is still in and will remain so for a long time the basic national conditions of the primary stage of socialism has not changed, the peoples growing material and cultural needs with the contradiction between the backward social production, the social principal contradiction does not change,

47、our countrys international status as the largest developing country in the world has not changed. I have to the problem, make decisions, do things, to promote reform and development of the any aspect of any field, Should be firmly based on the primary stage of socialism, the largest practical, do is

48、 not beyond the stage, and is not backward reality, both best effort, and our capabilities. the main content is what? , a total of eight, 281 words, including lead, the party honest self-discipline norms and the leadership of the party members and cadres self-discipline norms 3 parts, the main contents can be summarized as four must eight code. Lead part, reiterated on ideal and faith, the fundamental purpose, the fine traditions and work style, noble sentiments, such as four must p

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 建筑/施工/环境 > 农业报告


备案号:宁ICP备20000045号-2

经营许可证:宁B2-20210002

宁公网安备 64010402000987号